0.11 miles
|
CyrusOne: Bilter Rd Bldg 2
|
CyrusOne plans to develop a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
0.15 miles
|
Edged Energy: Chicago ORD03
|
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
|
0.26 miles
|
Edged Energy: Chicago ORD02
|
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
|
0.42 miles
|
Edged Energy: Aurora, Chicago
|
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
|
0.42 miles
|
CyrusOne: Aurora CHI2
|
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
|
0.45 miles
|
CyrusOne Chicago Aurora CME
|
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
0.52 miles
|
CyrusOne: CHI2 Bldg 2
|
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
|
2.60 miles
|
4267 Meridian Pkwy: Lincoln Rackhouse
|
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
|
2.69 miles
|
NetSource Chicago
|
|
5.05 miles
|
New Continuum: 603 Discovery
|
|
5.27 miles
|
Cogent Naperville
|
|
7.80 miles
|
Centersquare: Lisle CHI1
|
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|
11.61 miles
|
CyrusOne Chicago Lombard
|
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
12.68 miles
|
Digital Fortress: Chicago Lombard
|
|
12.68 miles
|
360TCS-Lombard
|
|
14.10 miles
|
Equinix Chicago CH7
|
|
15.94 miles
|
NYI Chicago (Oak Brook)
|
|
16.07 miles
|
US Signal Oakbrook
|
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
16.07 miles
|
Verizon: (Oak Brook)
|
|
16.07 miles
|
Server Farm Oak Brook
|
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
17.11 miles
|
LexusNexis Oak Brook
|
|
17.11 miles
|
DataBank (ORD4) Oak Brook
|
|
17.11 miles
|
Verizon: Swift Dr
|
|
17.59 miles
|
NTT Chicago CH1
|
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
|
17.89 miles
|
NTT: 1200 N Arlington Heights (Planned)
|
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
|
17.92 miles
|
NTT: 1250 N Arlington Heights (Planned)
|
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
|
18.52 miles
|
Aligned ORD-02
|
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
|
18.58 miles
|
Aligned Chicago ORD-01
|
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
18.59 miles
|
Element Critical CH2
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
18.71 miles
|
Microsoft Chicago Northlake
|
|
18.77 miles
|
Element Critical CH1
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
18.77 miles
|
Compass Hoffman Estates
|
|
18.98 miles
|
505 N Railroad Ave - Digital Realty
|
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
19.19 miles
|
Skybox Chicago I
|
|
19.24 miles
|
T5 Northlake IL
|
T5 Data Center is expanding its footprint in Chicago. T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 300,000 sq ft facility for multi-tenant or single-tenant operations.
|
19.61 miles
|
1450 E Devon Ave (CH3) DRT
|
|
19.71 miles
|
ServerCentral CH1
|
|
19.71 miles
|
Digital Elk Grove Village Campus
|
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
19.71 miles
|
HostPapa CH1
|
Formerly known as "ColoCrossing CH1"
|
19.71 miles
|
Rackspace Elk Grove ORD1
|
|
19.71 miles
|
2200 Busse Rd (CH1) DRT
|
|
19.72 miles
|
Complete Source Schaumburg
|
|
19.73 miles
|
Microsoft Hoffman Estates 2
|
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
19.80 miles
|
Centersquare: Chicago ORD2
|
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
19.85 miles
|
2299 Busse (CH2) Digital Realty
|
|
19.86 miles
|
CoreWeave: US Central ORD1
|
|
19.91 miles
|
Microsoft Hoffman Estates 1
|
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|