CyrusOne: Bilter Rd Bldg 2

2725 Bilter Rd

Operated by:

CyrusOne plans to develop a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.

  • The company submitted plans to Aurora lawmakers in May 2024 for two new data centers totaling more than half a million square feet, with the campus slated for a 32-acre site directly across Interstate 88 from CyrusOne’s existing complex in the city.
  • The first phase of the proposed development entails the construction of a 411K SF, two-story data center and facilities for backup generators. A second data center totaling 153K SF would be built during a later phase.

Map and Nearby Locations:

2725 Bilter Rd
Click Map to begin Search

Sites within 15 miles of CyrusOne: Bilter Rd Bldg 2

Show SqM
Distance Site About
0.11 miles CyrusOne: Bilter Road campus
CyrusOne plans to develop a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
0.26 miles Edged Energy: Chicago ORD03
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
0.38 miles Edged Energy: Chicago ORD02
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
0.40 miles CyrusOne: Aurora CHI2
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
0.45 miles CyrusOne Chicago Aurora CME
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
0.47 miles CyrusOne: CHI2 Bldg 2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
0.52 miles Edged Energy: Aurora, Chicago
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
2.61 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
2.79 miles NetSource Chicago
5.11 miles New Continuum: 603 Discovery
5.37 miles Cogent Naperville
7.89 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
11.72 miles CyrusOne Chicago Lombard
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
12.79 miles Digital Fortress: Chicago Lombard
12.79 miles 360TCS-Lombard
14.20 miles Equinix Chicago CH7
16.05 miles NYI Chicago (Oak Brook)
16.18 miles US Signal Oakbrook
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
16.18 miles Verizon: (Oak Brook)
16.18 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
17.22 miles LexusNexis Oak Brook
17.22 miles DataBank (ORD4) Oak Brook
17.22 miles Verizon: Swift Dr
17.70 miles NTT Chicago CH1
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
18.00 miles NTT: 1200 N Arlington Heights (Planned)
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
18.03 miles NTT: 1250 N Arlington Heights (Planned)
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
18.64 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
18.69 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
18.70 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
18.82 miles Microsoft Chicago Northlake
18.83 miles Compass Hoffman Estates
18.88 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
19.10 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
19.30 miles Skybox Chicago I
19.35 miles T5 Northlake IL
T5 Data Center is expanding its footprint in Chicago. T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 300,000 sq ft facility for multi-tenant or single-tenant operations.
19.73 miles 1450 E Devon Ave (CH3) DRT
19.82 miles Microsoft Hoffman Estates 2
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
19.82 miles Complete Source Schaumburg
19.82 miles ServerCentral CH1
19.82 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
19.82 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
19.83 miles 2200 Busse Rd (CH1) DRT
19.83 miles Rackspace Elk Grove ORD1
19.91 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
19.97 miles 2299 Busse (CH2) Digital Realty
19.97 miles CoreWeave: US Central ORD1
19.99 miles Microsoft Hoffman Estates 1
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.

CyrusOne: Bilter Rd Bldg 2 Data Center Photos


CyrusOne Bilter Road Campus preliminary site map

Operating Company

CyrusOne Inc, incorporated on July 31, 2012, is an owner, operator and developer of enterprise-class, carrier-neutral, multi-tenant datacenter properties. CyrusOne's data centers are purpose-built facilities.

The CyrusOne National IX Platform (the National IX Platform) delivers interconnection across states and between metro-enabled sites within the CyrusOne footprint and beyond. The platform enables data transfer and accessibility for customers by uniting all of the Company’s data centers. CyrusOne’s portfolio is located in several domestic and international markets. It has domestic properties in Chicago, Dallas, Houston, Phoenix, San Antonio and Cincinnati.

Company History:


July 2010: Cincinnati Bell acquires CyrusOne [r3]
Jan 2013: CyrusOne IPO [r2]
July 2014: Acquired Cervalis [r1]

References:


r1. Businesswire link July 1, 2015
r2. NASDAQ.com link Jan 18, 2013
r3. CyrusOne PR link

77 Facilities Owned
27 Markets Served
1200.82 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
cyrusone-bilter-road-campus-presentation-45fecb1f-ec6b-4cf7-9cdb-d86f7a1053c5 May 2024