Sites leasing space from H5 Data Centers:

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

H5 Data Centers owns and runs the Cleveland Technology Center (CTC), a multi-building data center and carrier hotel that spans 1525 to 1625 Rockwell Avenue in downtown Cleveland. More than two dozen network providers meet in the building, and the region's internet exchanges (CL-IX, FD-IX Ohio, NEO-IX and Ohio IX) operate there. Tenants include carriers, colocation providers and enterprises, several of which built their own data halls inside the complex. The building takes power from FirstEnergy over dual feeds from two diverse substations.

Site History

  • 2024: The city issued permits for two new 3.0 MW standby generators.
  • February 2017: H5 Data Centers bought the CTC from ByteGrid (Telecom Ramblings).
  • June 2015: ByteGrid commissioned 45,000 square feet of new data center space (Data Center Knowledge).
  • 2013: ByteGrid bought the CTC, then about half leased.

Project Profile

  • Building: four stories, two covered loading docks, 15,000 lb freight elevator, 120+ parking spaces
  • Raised floor: 30 in. raised floor, 9.5 ft to ceiling, 14 ft slab to slab
  • Power: 2.4 MW generators in N+1 per expansion phase, 48 hours of on-site fuel, dual-input PDUs
  • Cooling: chilled water with air-side economizer, McQuay 400-ton chillers, Schneider CRAHs
  • Certification: SSAE 16 SOC 1 Type 2

Map and Nearby Locations

1625 Rockwell Street
H5 Data Centers Sites
Nearby Facilities

Sites within 15 miles of H5 Cleveland Technology Center (CTC)

Distance Site
0.04 miles Carrier-Neutral Data CenterInterested in this information?Contact us
0.06 miles Verizon: 1525 Rockwell
0.06 miles SecureData 365 Cleveland
0.08 miles DataBank Cleveland
0.37 miles Fusion Connect Cleveland
0.37 miles BlueBridge: Cleveland
0.37 miles Lumen Cleveland 4
0.37 miles Cogent: 1621 Euclid
0.38 miles Sterling Linder Holdings: Sterling Building
0.39 miles DataBank Cleveland CLE1
0.62 miles AT&T: 750 Huron Rd
0.89 miles Verizon: 1150 W 3rd St
1.31 miles Lumen Cleveland (4000 Chester)
1.57 miles Cogent: 2650 Rockefeller Ave
3.47 miles Lakeland: Cleveland, Ohio
6.39 miles AT&T: 13630 Lorain Ave
7.60 miles StratCap: 4100 W 150
7.74 miles Lumen Cleveland 5
7.78 miles Expedient Garfield Heights 2
7.84 miles Expedient Garfield Heights 1
8.47 miles Bluebird: Parma
10.39 miles Ark: Independence
11.18 miles BlueBridge: Mayfield Heights
12.83 miles Progressive: Mayfield Village
13.02 miles Verizon: North Royalton
15.34 miles Cleveland Clinic Brecksville

H5 Cleveland Technology Center (CTC) Data Center Photos See all

CTC Circa 2013
Source: Baxtel
CTC Circa 2017
Source: Baxtel
Conference Room at H5 Cleveland
Source: H5
Lobby Area
Source: H5
Lobby with a view of the conference room
Lobby Area
Source: H5

Lobby with a view of the conference room

Entrance to 1625 Rockwell
Source: H5
Rooftop at CTC
Source: H5

Operating Company

Operated by:

H5 Company History:


0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Cleveland Extends Data Center Moratorium Through January 29, 2027
Cleveland City Council voted on the night of Oct. 19 to extend the city's moratorium on new data centers through Jan. 29, 2027, or until council enacts permanent rules. The extension keeps zoning p...

Cleveland Extends Data Center Moratorium Through January 29, 2027

October 21, 2026 Cleveland

Cleveland City Council voted on the night of Oct. 19 to extend the city's moratorium on new data centers through Jan. 29, 2027, or until council enacts permanent rules. The extension keeps zoning permits and occupancy certificates frozen for new standalone data centers and also covers...

Read more
Read H5 expands its San Antonio data center
H5 expands its San Antonio data center

H5 expands its San Antonio data center

November 21, 2023 H5 Data Centers

H5 this week announced the phase three expansion of its 100 Taylor Street facility, adding an additional 340 cabinets and up to 1.5MW of additional UPS capacity. This site, located at 100 Taylor Street, was acquired by H5 in 2018 and was previously owned by the Texas ISP Taylor Telecom. It is an...

Read more
Read H5 Data Centers to expand its Phoenix data center
H5 Data Centers to expand its Phoenix data center

H5 Data Centers to expand its Phoenix data center

July 04, 2023 H5 Data Centers

H5 Data Centers has announced a 30,000 sqft expansion of its Phoenix colocation facility. Located at 2600 W. Germann Road in Chandler, AZ, this expansion is part of the company's third phase of development at the 180,000-square-foot data center. Further to this square-footage expansion, phase...

Read more
Read Construction of H5's Ashburn, VA Data Center Begins
Construction of H5's Ashburn, VA Data Center Begins

Construction of H5's Ashburn, VA Data Center Begins

March 22, 2023 H5 Data Centers

After dismantling the former data center there, H5 Data Centers has started construction on a new one in Ashburn, Virginia. This week, the company started building a 255,000-square-foot, three-story data center with a 42-megawatt capacity. The building is offered for pre-leasing at Loudoun...

Read more
Read H5 To Expand Its Cleveland Data Center
H5 To Expand Its Cleveland Data Center

H5 To Expand Its Cleveland Data Center

May 06, 2022 H5 Cleveland Technology Center (CTC)

H5 is looking to expand its Cleveland facility in Ohio. The data center company filed with the Cleveland planning commission to expand its data center located at 1625 Rockwell Avenue. It also filed for a Façade change at the facility. Although the application didn’t reveal specifics of the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.