EdgeConnex: Johnstown South Campus

Latest Podcast 9850 Innovation Campus Wy
Under Construction
New facility under construction
Operated by:

EdgeConnex: Johnstown South Campus

Short Code: Phase I
Year Planned: 2027
Ownership: EdgeConneX owns the building.
Lot Size: 100 acres

Sites on this Campus:

EdgeConneX is investing $137.2 million to develop over 1 million sq ft of data center space in Licking County, Ohio.

Phase I: Conversion of Existing Building

The initial phase converts a 524,524 sq ft industrial building at 9850 Innovation Campus Way into a data center. This building comes with a 15-year, 100% property tax abatement and is expected to be complete by April 2026.

Phase II: New Construction

Phase II includes building a new 700,000 sq ft, two-story facility and an 80,000 sq ft energy center with gas generators. This phase is set for substantial completion by Q3 2027.

Map and Nearby Locations

9850 Innovation Campus Wy
EdgeConneX Sites
Nearby Facilities

EdgeConnex: Johnstown South Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of EdgeConnex: Johnstown South Campus

Distance Site About
0.12 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
0.38 miles Park ProInterested in this information?Contact us
0.56 miles Metro StationInterested in this information?Contact us
0.57 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
0.57 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
0.63 miles SouthInterested in this information?Contact us
0.67 miles Central CenterInterested in this information?Contact us
0.72 miles North CenterInterested in this information?Contact us
0.83 miles Center TwoInterested in this information?Contact us
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
1.13 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
1.35 miles Central TowerInterested in this information?Contact us
1.37 miles StationInterested in this information?Contact us
1.46 miles Plaza MaxInterested in this information?Contact us
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
1.50 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
1.51 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
1.56 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
1.61 miles Valley PrimeInterested in this information?Contact us
1.61 miles RidgeInterested in this information?Contact us
1.64 miles Vantage: New Albany (OH1)
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
1.66 miles Tower MaxInterested in this information?Contact us
1.76 miles Campus UltraInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
1.82 miles BetaInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
1.85 miles Plaza TwoInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
1.89 miles Prime ParkInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
1.90 miles West StationInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
1.96 miles Prime RidgeInterested in this information?Contact us
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
2.00 miles Cloud StationInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
2.02 miles Point UltraInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
2.04 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
2.06 miles ParkInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
2.06 miles East TowerInterested in this information?Contact us
The Prometheus data center campus in New Albany, Ohio, serves as a primary hub for Meta's AI training infrastructure.
2.12 miles Cloud ParkInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
2.21 miles BetaInterested in this information?Contact us
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
2.31 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
2.35 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
2.39 miles NorthInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
2.44 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
2.45 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
2.45 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
2.45 miles Center OneInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
2.49 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
2.52 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
2.52 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
2.69 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
2.77 miles Valley BetaInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
2.77 miles UltraInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
2.77 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
2.79 miles Metro PointInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
2.82 miles Campus BetaInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
2.83 miles QTS: New Albany 2 DC1
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
2.86 miles PrimeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
2.87 miles Station UltraInterested in this information?Contact us
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
2.95 miles South RidgeInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
3.02 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
3.06 miles ProInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
3.24 miles UltraInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
3.31 miles Ridge MaxInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
3.34 miles Cologix: Johnstown Expansion
3.34 miles Center BetaInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
3.37 miles Cologix: Johnstown COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
3.41 miles Cologix: Johnstown COL8
3.47 miles PlusInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.32 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
4.47 miles Stack: NAL01B
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
4.55 miles Compugen New Albany
4.65 miles Compass New Albany
4.73 miles TJX Corporate Techno
4.98 miles Discover Financial Services New Albany
5.03 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
6.58 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
7.60 miles Core RidgeInterested in this information?Contact us
Microsoft acquired 289 acres of land in Pataskala for $30.7 million.
7.69 miles Valley BetaInterested in this information?Contact us
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
9.46 miles CeraNet Columbus
11.16 miles Cloud HubInterested in this information?Contact us
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
11.41 miles eNET Columbus
11.95 miles WeConnect Westerville
12.44 miles Racksquared 2560 Value Way
13.31 miles North HubInterested in this information?Contact us
Microsoft put its data center construction plans on hold in New Albany, Heath, and Hebron in April 2025.
14.28 miles South ValleyInterested in this information?Contact us
Microsoft put its data center construction plans on hold in New Albany, Heath, and Hebron in April 2025.
14.80 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
14.84 miles Cologix COL3
14.89 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
15.34 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Vantage plans to build another data center campus near Columbus, Ohio.
15.48 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
15.72 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
15.82 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
16.07 miles Expedient: Lewis Center (CMH3)
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
16.21 miles Centersquare: Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord.
16.51 miles Lumen: 580 North 4th
16.55 miles Racksquared 325 E Spring St
16.59 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
16.61 miles CityNet Columbus
16.64 miles Cogent: 240 North 5th
16.64 miles Lumen: 266 North 5th
16.65 miles Lumen: 226 North Fifth
16.65 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
16.78 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
16.82 miles Cologix: Columbus COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
16.83 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
16.83 miles CENTRA: 180 East Broad (CMH01)
16.85 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
17.03 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
17.18 miles Carrier-Neutral Data CenterInterested in this information?Contact us
17.49 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
18.99 miles Expedient Upper Arlington

EdgeConnex: Johnstown South Campus Data Center Photos See all

EdgeConneX acquired an industrial building in Ohio
Source: EdgeConneX

Operating Company

Operated by:

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

0
Facilities
0
Markets

News See all

Read EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County
EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

June 03, 2026 EdgeConneX

US operator EdgeConneX has filed plans to construct two 730,000-square-foot (67,820 sqm) data centers in Bastrop County, Texas. Named EDCAUS11 and EDCAUS12, the projects are planned for a 180-acre site at 6682 FM 535 in Cedar Creek, which the company acquired in November 2025. The parcel is...

Read more
Read EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy
EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

May 23, 2026 EdgeConneX

The government of Italy has described EdgeConneX’s €3 billion investment as being of “national strategic interest.” The EdgeConneX Campus Italia program, announced on May 14 during a council of ministers chaired by Prime Minister Giorgia Meloni, will develop three data center campuses in the...

Read more
Read EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

March 19, 2026 EdgeConneX

EdgeConneX has begun construction on a new data center outside Osaka, Japan. The company announced this week that it is developing its first 200MW, AI-ready campus in Greater Osaka in partnership with Kagoya Asset Management.The Kyotanabe campus will cover 130,000 sqm (1.4 million sq ft), with...

Read more
Read EdgeConneX Partners with Ral Estate Firm Stockland
EdgeConneX Partners with Ral Estate Firm Stockland

EdgeConneX Partners with Ral Estate Firm Stockland

September 16, 2025 EdgeConneX

ASX-listed real estate firm Stockland announced it had formed an exclusive arrangement with EdgeConneX to establish a partnership to develop, own, and operate a data center portfolio, and was “exploring opportunities across Stockland’s logistics pipeline.”This partnership will combine...

Read more
Read EdgeConneX to Develop Second Facility in Japan
EdgeConneX to Develop Second Facility in Japan

EdgeConneX to Develop Second Facility in Japan

August 28, 2025 EdgeConneX

Data center firm EdgeConneX this week announced the acquisition of its second data center site in the Greater Osaka and Yawata areas of Japan. The new site will provide an additional 150MW upon completion, bringing EdgeConneX's total data center capacity in Japan to 350MW of utility power at full...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?