Crown Castle 101 E Town

Latest Podcast 101 E Town St
Operational
Fully operational facility
Operated by:

Crown Castle 101 E Town

░░░ Request Dataset MW
Total Power

History

  • Crown Castle acquired Lightower in 2017.
  • Lightower acquired the site from Datacenter101 in July 2016.

Map and Nearby Locations

101 E Town St
Crown Castle Sites
Nearby Facilities

Sites within 15 miles of Crown Castle 101 E Town

Distance Site About
0.30 miles CENTRA: 180 East Broad (CMH01)
0.30 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
0.42 miles Carrier-Neutral Data CenterInterested in this information?Contact us
0.60 miles Racksquared 325 E Spring St
0.61 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
0.61 miles Lumen: 226 North Fifth
0.64 miles Cogent: 240 North 5th
0.65 miles CityNet Columbus
0.66 miles Lumen: 266 North 5th
1.10 miles Lumen: 580 North 4th
1.10 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
6.18 miles Kyndryl: Columbus
6.46 miles Racksquared 2560 Value Way
7.38 miles Edge StationInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
7.38 miles PointInterested in this information?Contact us
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
7.59 miles Central StationInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
7.76 miles Campus MaxInterested in this information?Contact us
This data center is a part of Google's Lockbourne Campus in Ohio.
7.78 miles CoreInterested in this information?Contact us
This data center is a part of Google's Lockbourne Campus in Ohio.
7.79 miles NorthInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.86 miles Point OneInterested in this information?Contact us
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
7.90 miles Metro ValleyInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.94 miles CampusInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.94 miles CeraNet Columbus
8.00 miles East ValleyInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
8.09 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
8.10 miles GlobalInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
8.11 miles Expedient Upper Arlington
8.93 miles Carrier-Neutral Data CenterInterested in this information?Contact us
9.12 miles eNET Columbus
9.36 miles DataCanopy: Columbus
9.48 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
10.00 miles Hub AlphaInterested in this information?Contact us
10.05 miles Plaza UltraInterested in this information?Contact us
10.07 miles NorthInterested in this information?Contact us
10.12 miles AlphaInterested in this information?Contact us
10.16 miles Hub PlusInterested in this information?Contact us
10.28 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
10.84 miles Cologix COL3
10.90 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
11.02 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
11.27 miles Park GammaInterested in this information?Contact us
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
11.32 miles ValleyInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.36 miles Prime RidgeInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.42 miles East RidgeInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
11.66 miles PrimeInterested in this information?Contact us
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.
11.72 miles WeConnect Westerville
11.82 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
12.03 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
12.93 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
13.55 miles Expedient: Lewis Center (CMH3)
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
13.60 miles OneInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.73 miles Hub ProInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.78 miles ProInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.86 miles Discover Financial Services New Albany
13.92 miles SouthInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
14.01 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
14.03 miles ThreeInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
14.11 miles Compass New Albany
14.13 miles CentralInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
14.14 miles TJX Corporate Techno
14.19 miles Point MaxInterested in this information?Contact us
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
14.26 miles Compugen New Albany
14.27 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
14.32 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
14.39 miles QTS: New Albany 2 DC1
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
14.40 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
14.44 miles Stack: NAL01B
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
14.44 miles North RidgeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.47 miles Plaza PlusInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
14.49 miles MetroInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.51 miles ParkInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
14.52 miles Centersquare: Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord.
14.53 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
14.53 miles Metro HubInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.55 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
14.56 miles Station ThreeInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
14.58 miles Core RidgeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.60 miles Metro ParkInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.60 miles Tower UltraInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
14.61 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
14.66 miles TowerInterested in this information?Contact us
Amazon is building a five-building data center campus in New Albany, Ohio.
14.76 miles Central ParkInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.80 miles CoreInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.94 miles Valley OneInterested in this information?Contact us
Microsoft acquired 289 acres of land in Pataskala for $30.7 million.
15.03 miles Plaza PrimeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.06 miles Point PrimeInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
15.06 miles GlobalInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
15.09 miles EdgeConneX: Ashville, Ohio
The proposed EdgeConneX data center project in Pickaway County, Ohio, involves the development of 680 acres of farmland in the village of Ashville.
15.10 miles South HubInterested in this information?Contact us
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
15.30 miles UltraInterested in this information?Contact us
The Prometheus data center campus in New Albany, Ohio, serves as a primary hub for Meta's AI training infrastructure.
15.33 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
15.33 miles HubInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.39 miles ThreeInterested in this information?Contact us
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
15.40 miles West ValleyInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
15.42 miles West HubInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.45 miles East RidgeInterested in this information?Contact us
15.48 miles ThreeInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.55 miles Valley UltraInterested in this information?Contact us
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
15.81 miles EdgeConneX: Ashville 2
Local officials in Ashville, Ohio, blocked the expansion of a proposed EdgeConneX data center in February 2026. Although the company owns an initial 200-acre plot, their request to annex an additional 490 acres was denied.
15.94 miles North RidgeInterested in this information?Contact us
16.00 miles StationInterested in this information?Contact us
16.02 miles Cologix: Columbus COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
16.04 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
16.07 miles Cloud CenterInterested in this information?Contact us
16.11 miles Valley BetaInterested in this information?Contact us
16.14 miles Edge CampusInterested in this information?Contact us
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
16.19 miles Tower MaxInterested in this information?Contact us
16.29 miles South PointInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.35 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
16.37 miles Hub PlusInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.40 miles Center GammaInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.40 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
16.44 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
16.51 miles North TowerInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.53 miles Vantage: New Albany (OH1)
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
16.55 miles Cloud ParkInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.63 miles GammaInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.66 miles OneInterested in this information?Contact us
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
16.67 miles Station TwoInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.72 miles East TowerInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.76 miles Tower ProInterested in this information?Contact us
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
16.81 miles Edge RidgeInterested in this information?Contact us
16.85 miles Park AlphaInterested in this information?Contact us
16.89 miles ProInterested in this information?Contact us
16.94 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
16.97 miles PlazaInterested in this information?Contact us
16.97 miles Ridge PlusInterested in this information?Contact us
17.03 miles EdgeConnex: Johnstown South Campus
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
17.05 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.12 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.16 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
17.24 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.26 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.27 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
17.29 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
17.51 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
17.51 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
17.60 miles Ridge OneInterested in this information?Contact us
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
17.81 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
19.18 miles Cologix: Johnstown COL8
19.30 miles Cologix: Johnstown COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
19.31 miles Cologix: Johnstown Expansion
19.56 miles Tower MaxInterested in this information?Contact us
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.

Crown Castle 101 E Town Data Center Photos See all

Operating Company

Operated by:

Crown Castle's facilities were acquired from Lightower, Sidera, FiberTech.

History

In 2017 Crown Castle acquired Lightower Fiber Networks for $7.1B. Lightower Fiber Networks was a fiber provider with over 20,000 route miles of network and access to over 8,500 buildings in the Northeast, Mid-Atlantic and Chicago Metro

In 2015, Lightower acquired Fibertech Networks.

16
Facilities
11
Markets
24MW
Megawatts

News See all

Read Crown Castle changes focus to small cells as building towers
Crown Castle changes focus to small cells as building towers

Crown Castle changes focus to small cells as building towers

June 12, 2024 Crown Castle

Crown castle which operates more than 40,000 towers, has acknowledged that it's become more difficult to build new infrastructure. This is due to opposition from residents and the fact that some municipalities don't want more telecom masts at all."It's generally because it's very difficult to...

Read more
Read Glass Lewis stands with Ted Miller against Crown Castle board
Glass Lewis stands with Ted Miller against Crown Castle board

Glass Lewis stands with Ted Miller against Crown Castle board

May 17, 2024 Crown Castle

Proxy firm Glass Lewis has publicly urged Crown Castle shareholders to vote for two activist director candidates, including the company's co-founder and former chief executive officer, Ted Miller, to the board, along with former CFO Charles Green. Furthermore, Glass Lewis also told shareholders...

Read more
Read Crown Castle reveals update on fiber business review
Crown Castle reveals update on fiber business review

Crown Castle reveals update on fiber business review

April 22, 2024 Crown Castle

Tower company Crown Castle recently revealed that it has been in talks with multiple parties regarding its fiber business in recent months. Miller, who was the company's CEO until 2001, wants to sell the fiber business and has previously said the assets could fetch as much as $15 billion. "The...

Read more
Read Crown Castle announces new CEO
Crown Castle announces new CEO

Crown Castle announces new CEO

April 09, 2024 Crown Castle

Crown Castle has announced Steven J. Moskowitz as president and CEO, bringing an end to Crown Castle's search for a successor to former CEO Jay Brown, who announced his departure in December. Anthony Melone acted as interim CEO from January 16, 2024. “I have long admired Crown Castle’s quality...

Read more
Read Crown Castle CEO announces retirement plans after investors call for change
Crown Castle CEO announces retirement plans after investors call for change

Crown Castle CEO announces retirement plans after investors call for change

December 09, 2023 Crown Castle

Crown Castle has announced that its CEO, Jay Brown has informed them of his decision to step down from the role of CEO earlier this week and will retire from the company next year. This news comes only a week after activist investor Elliott Investment Management issued a statement calling for a...

Read more