Compass Groveport AEP II

Latest Podcast 4470 S Hamilton Rd
Operational
Fully operational facility
Operated by:

Compass Groveport AEP II

Year Built: 2019
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

American Electric Power invested approximately $125 million into the data center on Hamilton Road. The facility was constructed and managed by Compass

Map and Nearby Locations

4470 S Hamilton Rd
Compass Datacenters Sites
Nearby Facilities

Compass Groveport AEP II Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Compass Groveport AEP II

Distance Site About
4.87 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
5.69 miles DataCanopy: Columbus
6.29 miles WestInterested in this information?Contact us
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
6.41 miles Center OneInterested in this information?Contact us
This data center is a part of Google's Lockbourne Campus in Ohio.
6.56 miles Cloud ValleyInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
6.61 miles Point PlusInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
6.65 miles Core PointInterested in this information?Contact us
This data center is a part of Google's Lockbourne Campus in Ohio.
6.99 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
8.02 miles CeraNet Columbus
8.09 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
8.25 miles CENTRA: 180 East Broad (CMH01)
8.25 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
8.30 miles Racksquared 325 E Spring St
8.44 miles Lumen: 226 North Fifth
8.44 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
8.45 miles CityNet Columbus
8.47 miles Cogent: 240 North 5th
8.50 miles Lumen: 266 North 5th
8.50 miles Carrier-Neutral Data CenterInterested in this information?Contact us
8.88 miles Lumen: 580 North 4th
9.88 miles Core CampusInterested in this information?Contact us
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.
10.73 miles EdgeConneX: Ashville, Ohio
The proposed EdgeConneX data center project in Pickaway County, Ohio, involves the development of 680 acres of farmland in the village of Ashville.
11.07 miles Station PlusInterested in this information?Contact us
Microsoft acquired 289 acres of land in Pataskala for $30.7 million.
11.16 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
11.41 miles Cloud PlazaInterested in this information?Contact us
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
11.45 miles EdgeConneX: Ashville 2
Local officials in Ashville, Ohio, blocked the expansion of a proposed EdgeConneX data center in February 2026. Although the company owns an initial 200-acre plot, their request to annex an additional 490 acres was denied.
11.93 miles Racksquared 2560 Value Way
12.55 miles Carrier-Neutral Data CenterInterested in this information?Contact us
13.36 miles Kyndryl: Columbus
13.37 miles West ValleyInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.39 miles Valley PrimeInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.45 miles NorthInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.58 miles North CenterInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.59 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
13.69 miles CentralInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.75 miles Valley UltraInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
13.77 miles EastInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
13.79 miles QTS: New Albany 2 DC1
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
13.80 miles Plaza TwoInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
13.82 miles GlobalInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
13.82 miles East HubInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
13.82 miles Valley OneInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
13.91 miles South CenterInterested in this information?Contact us
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
14.16 miles Ridge GammaInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.21 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
14.23 miles South ValleyInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.25 miles eNET Columbus
14.30 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
14.34 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
14.50 miles Global ParkInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.53 miles Station ThreeInterested in this information?Contact us
The Prometheus data center campus in New Albany, Ohio, serves as a primary hub for Meta's AI training infrastructure.
14.58 miles PrimeInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.60 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
14.66 miles Prime PlazaInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
14.74 miles Center PrimeInterested in this information?Contact us
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
14.74 miles Global RidgeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
14.91 miles Prime RidgeInterested in this information?Contact us
In 2021 Google bought a farm at 104 Whiley Road, west of U.S. 33 and the first site was completed in 2024.
15.09 miles CampusInterested in this information?Contact us
This facility is part of Google's Lancaster campus in Ohio.
15.74 miles Discover Financial Services New Albany
15.80 miles NorthInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
15.83 miles Compass New Albany
15.89 miles CloudInterested in this information?Contact us
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
15.91 miles Metro HubInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
15.91 miles TJX Corporate Techno
15.95 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
15.95 miles Compugen New Albany
15.98 miles Global ParkInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
16.04 miles Station GammaInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
16.04 miles Expedient Upper Arlington
16.11 miles Stack: NAL01B
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
16.12 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
16.14 miles Core CenterInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
16.20 miles GammaInterested in this information?Contact us
16.27 miles Valley OneInterested in this information?Contact us
16.28 miles PrimeInterested in this information?Contact us
16.35 miles Plaza BetaInterested in this information?Contact us
16.39 miles ProInterested in this information?Contact us
16.55 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
16.59 miles EdgeConnex: Johnstown South Campus
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
16.62 miles Core StationInterested in this information?Contact us
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
16.63 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
16.68 miles Ridge ProInterested in this information?Contact us
16.68 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
16.72 miles Plaza TwoInterested in this information?Contact us
16.73 miles Campus TwoInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.73 miles North PlazaInterested in this information?Contact us
16.75 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
16.77 miles Prime TowerInterested in this information?Contact us
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
16.79 miles Prime CenterInterested in this information?Contact us
16.80 miles Park ThreeInterested in this information?Contact us
16.81 miles Core ParkInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.85 miles Tower OneInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
16.88 miles Vantage: New Albany (OH1)
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
17.03 miles Campus ProInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
17.04 miles Edge PlazaInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
17.05 miles WeConnect Westerville
17.16 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
17.16 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
17.25 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
17.37 miles Cologix COL3
17.44 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
17.52 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
17.56 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
17.66 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
17.66 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
17.71 miles SouthInterested in this information?Contact us
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
17.72 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
17.74 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.75 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
17.79 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
17.83 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Vantage plans to build another data center campus near Columbus, Ohio.
17.83 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.89 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.94 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
17.96 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
18.07 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
18.09 miles Metro TowerInterested in this information?Contact us
18.14 miles Station PrimeInterested in this information?Contact us
18.16 miles WestInterested in this information?Contact us
18.20 miles Tower OneInterested in this information?Contact us
18.25 miles South ParkInterested in this information?Contact us
19.31 miles Campus ProInterested in this information?Contact us
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
19.37 miles Cloud PointInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
19.41 miles ParkInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
19.47 miles Prime HubInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
19.68 miles Cologix: Johnstown COL8
19.71 miles Cologix: Johnstown Expansion
19.72 miles Cologix: Johnstown COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
19.81 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.

Compass Groveport AEP II Data Center Photos See all

The second AEP facility under construction in Groveport OH
Source: Baxtel

Operating Company

Operated by:

Compass Datacenters provides solutions from the core to the edge. We serve cloud and SaaS providers, enterprises, colocation and hosting companies and customers with distributed infrastructure requirements.

43
Facilities
14
Markets
815MW
Megawatts

News See all

Read Compass Datacenters Funds $15M Animal Shelter Amid Ellis County Data Center Debate
Compass Datacenters is seeking to ease opposition to its data center plans by proposing a $15 million contribution toward a new animal shelter in Red Oak, Ellis County, Texas. A June 2 statement sa...

Compass Datacenters Funds $15M Animal Shelter Amid Ellis County Data Center Debate

June 05, 2026 Compass Datacenters

Compass Datacenters is seeking to ease opposition to its data center plans by proposing a $15 million contribution toward a new animal shelter in Red Oak, Ellis County, Texas. A June 2 statement said Ellis County and Compass Datacenters have announced a proposed $15 million grant agreement to...

Read more
Read Compass to develop new data center campus in Mississippi
Compass to develop new data center campus in Mississippi

Compass to develop new data center campus in Mississippi

January 10, 2025 Compass Datacenters

Compass Datacenters is to develop a new $10 billion data center campus in Mississippi. The $10 billion figure was the total investment value of the campus, including IT equipment by customers, rather than the company's individual investment figure. “We are looking forward to building our next...

Read more
Read County’s planning staff recommends denial of massive data center project again
County’s planning staff recommends denial of massive data center project again

County’s planning staff recommends denial of massive data center project again

December 13, 2023 Compass Datacenters

The Prince William County staff have again recommended the denial of all three rezoning requests associated with the PW Digital Gateway data center project. This comes after two rejections of the rezoning requests by QTS and Compass in recent months. County staff said in a report, “At this point,...

Read more
Read Compass will soon buy Sears' 2.4 million-square-foot Chicago facility
Compass will soon  buy Sears' 2.4 million-square-foot Chicago facility

Compass will soon buy Sears' 2.4 million-square-foot Chicago facility

July 21, 2023 Compass Datacenters

Compass Datacenters, which was recently taken over, is planning to purchase a former Sears office complex in Chicago, Illinois, presumably for a new data center campus. The data center constructor and operator are "poised" to acquire the Sears site in the Hoffman Estates neighborhood, as first...

Read more
Read Compass Datacenters bought by Ontario Teachers' Plan and Brookfield
Compass Datacenters bought by Ontario Teachers' Plan and Brookfield

Compass Datacenters bought by Ontario Teachers' Plan and Brookfield

June 20, 2023 Compass Datacenters

Brookfield Infrastructure Partners will acquire Compass Datacenters with the company's current investor, Ontario Teachers' Pension Plan. This week, Brookfield Infrastructure, its financial partners, and longtime investor Ontario Teachers' Pension Plan revealed that they had officially agreed to...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?