DataBank: DFW11

Latest Podcast 3320 Batchler Rd
Under Construction
New facility under construction
Operated by:

DataBank: DFW11

Year Planned: 2027
Utility Provider: Oncor
Floors: 2

Sites leasing space from DataBank:

  • Edge PlazaInterested in this information?Contact us

DFW11 is building 3 of 8 on DataBank's Red Oak campus in Ellis County, south of Dallas. The two-story building is covered by the $2 billion construction loan DataBank closed in April 2026 for its first three buildings, which it said were already leased. Shell construction started in December 2025, and data hall fit-out began in April 2026.

Site History

  • April 2026: DataBank closes construction financing, and data hall fit-out starts.
  • December 2025: Construction starts.

Map and Nearby Locations

3320 Batchler Rd
DataBank Sites
Nearby Facilities

DataBank: DFW11 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of DataBank: DFW11

Distance Site About
0.02 miles Edge ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.15 miles Park PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.15 miles DataBank: DFW12
DFW12 is the fourth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
0.15 miles DataBank: DFW10
DFW10 is the second of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
0.16 miles Campus GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.19 miles DataBank: DFW9
DFW9 is the first of eight planned buildings on DataBank's 292-acre Red Oak campus in Ellis County, south of Dallas.
0.20 miles DataBank: DFW13
DFW13 is the fifth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
0.20 miles Tower UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.35 miles Lincoln: Red Oak DFW4
Planned data center building DFW4 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
0.36 miles DataBank: DFW14
DFW14 is the sixth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
0.44 miles Lincoln: Red Oak DFW3
Planned data center building DFW3 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
0.52 miles Lincoln: Red Oak DFW2
Planned data center building DFW2 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. It is the campus's lead building, with an initial phase targeted for the second quarter of 2028.
0.54 miles DataBank: DFW15
DFW15 is the seventh of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
0.60 miles DataBank: DFW16
DFW16 is the last of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
2.67 miles Compass: Red Oak Goodloe Lane Campus
Compass Datacenters' planned second data center campus in Red Oak, Texas, on about 830 acres the city rezoned for eight two-story buildings in 2026.
2.80 miles North PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.82 miles Skybox: PowerCampus Dallas
Skybox Datacenters' PowerCampus Dallas is a three-building data center campus with its own substation in Lancaster, south of Dallas; Google operates its first building.
2.90 miles Stack: DFW02 Expansion
Expansion land on STACK Infrastructure's DFW02 campus in Lancaster, held for buildings beyond the five in STACK's 2026 plan.
2.91 miles Stack: DFW02C
STACK Infrastructure's DFW02C is building 3 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
2.91 miles Stack: DFW02F
DFW02F was the sixth building in STACK Infrastructure's original 2024 plan for its DFW02 campus in Lancaster. STACK's 2026 plan has five larger buildings and no DFW02F.
2.94 miles Metro CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.96 miles Compass: Red Oak X
Compass Datacenters' Red Oak X is building 10 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.05 miles Edge CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.07 miles Compass: Red Oak IX
Compass Datacenters' Red Oak IX is building 9 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.11 miles Stack: DFW02E
STACK Infrastructure's DFW02E is building 5 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
3.13 miles Stack: DFW02B
STACK Infrastructure's DFW02B is building 2 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
3.24 miles East PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.26 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.28 miles Stack: DFW02A
STACK Infrastructure's DFW02A is building 1 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
3.30 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.32 miles Compass: Red Oak VI
Compass Datacenters' Red Oak VI is building 6 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.32 miles Stack: DFW02D
STACK Infrastructure's DFW02D is building 4 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
3.33 miles Ridge UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.33 miles Global PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.34 miles Compass: Red Oak VII
Compass Datacenters' Red Oak VII is building 7 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.34 miles Compass: Red Oak VIII
Compass Datacenters' Red Oak VIII is building 8 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.46 miles Yondr: Lancaster 1
First planned building at Yondr's Lancaster campus, on the 29-acre west tract at 801 E. Belt Line Road. Yondr's concept plan shows a two-hall building of about 300,000 sq ft. Construction has not started.
3.51 miles QTS: Dallas IV
Dallas IV is QTS's 131-acre tract at 501 Lavender Road in Wilmer, Texas, planned for five data center buildings of about 378,100 sq ft each. QTS has not filed any of them with the state.
3.60 miles Diode Ventures: Weston Holladay Technology Park
Diode Ventures plans the Weston Holladay Technology Park, a hyperscale data center campus on more than 900 acres in Red Oak, south of Dallas.
3.62 miles QTS: DFW3-DC1
DC1 is the first of two data centers QTS plans on its 98.6-acre DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft on the west side of the site. Construction has not started.
3.62 miles QTS: DFW3-DC2
DC2 is the second of two data centers QTS plans on its DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft east of DC1, beside the site's planned substation. Construction has not started.
3.64 miles QTS: DFW2-DC7
QTS is expanding its South Dallas campus with DC7, a new two-story data center building planned near Wilmer in southern Dallas County.
3.73 miles QTS: DFW2 Expansion
DFW2 Expansion holds the fourth planned building on QTS's 113.5-acre Dallas II tract between Sunrise Road and Mason Road in Wilmer and Lancaster, Texas. QTS has not filed it with the state.
3.79 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.79 miles West TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.80 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.80 miles Prime StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.81 miles Compass: Red Oak II
Compass Datacenters' Red Oak II is building 2 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.81 miles Compass: Red Oak I
Compass Datacenters' Red Oak I is building 1 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.82 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.82 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.82 miles Compass: Red Oak III
Compass Datacenters' Red Oak III is building 3 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.82 miles Compass: Red Oak IV
Compass Datacenters' Red Oak IV is building 4 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.83 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.84 miles Compass: Red Oak V
Compass Datacenters' Red Oak V is building 5 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
3.86 miles QTS: DFW2-DC5
DC5 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
3.87 miles QTS: Dallas VI
Dallas VI is QTS's tract of about 75 acres at 401 Lavender Road in Wilmer, Texas, planned for three data center buildings of 285,000 to 378,100 sq ft. QTS has not filed any of them with the state.
3.90 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.93 miles Yondr: Lancaster Expansion
Four later buildings on Yondr's Lancaster campus between East Belt Line Road and Greene Road, from Yondr's five-building concept plan.
3.93 miles Compass: Red Oak DFW III-I
Compass Datacenters' DFW III-I is the first and smallest data center on its DFW III campus in Red Oak, south of Dallas, completed in 2020.
3.96 miles NTT: TX11
TX11 is the first planned building on NTT's Lancaster campus at Sunrise Road and Belt Line Road, a data center of about 225,000 sq ft on the 108.7-acre tract NTT bought in December 2025.
3.98 miles QTS: DFW2-DC6
DC6 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
3.98 miles QTS: DFW2-DC4
QTS is developing a 413,726-square-foot, two-story data center with office and shell data hall space on its South Dallas DFW2 campus near Wilmer, in southern Dallas County.
4.02 miles QTS: DFW2-DC1
DC1 is the first building on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, a two-story, 413,726 sq ft data center with office and shell data hall space.
4.06 miles QTS: DFW2-DC3
DC3 is a two-story, 560,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
4.07 miles QTS: Dallas V
Dallas V is QTS's tract of about 101 acres at 420 Lavender Road and South Millers Ferry Road in Wilmer, Texas, held for future data centers. QTS has published no building plan for it.
4.08 miles QTS: DFW2-DC2
DC2 is a two-story, 470,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
4.08 miles NTT: Lancaster TX10 Expansion
Six later buildings (TX12 to TX17) on NTT's Lancaster campus at Sunrise Road and Belt Line Road, from the seven-building test fit for the 108.7-acre tract.
4.11 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.14 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.16 miles QTS: Greene Road Expansion
Buildings B to E on QTS's Greene Road tract in Lancaster, Texas, from the five-building Project Labrador zoning plan.
4.17 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.23 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.27 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.32 miles QTS: Dallas III
Dallas III is a planned QTS data center of about 336,500 sq ft on 53.8 acres east of Mason Road at Belt Line Road in Wilmer, Texas, on the DFW2 plat. QTS has not filed it with the state.
4.32 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.53 miles QTS: Greene Road DC1
DC1 is the first building pad on QTS's Greene Road tract in Lancaster, one of five two-story data centers of about 240,600 sq ft each on the Project Labrador zoning plan.
6.84 miles Cawley Partners: South Creek Ranch
Cawley Partners plans digital commerce parks, including data centers, on about 2,000 acres of its South Creek Ranch in Ferris, south of Dallas.
9.37 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.35 miles Kyndryl: Dallas (1000 Belleview)
Kyndryl runs the former IBM Dallas Data Center on Belleview Street in the Cedars, south of downtown, in a building the City of Dallas now owns.
16.40 miles Digital Realty: Midlothian
Digital Realty plans a four-building data center campus on about 167 acres at Gifco Road and Quarry Road in Midlothian, south of Dallas.
17.04 miles Sprocket DAL2
Former Sprocket Networks hosting site at 400 South Akard Street in downtown Dallas. Sprocket left the hosting business around 2020 and now sells dark fiber.
17.04 miles DataBank Downtown Dallas DFW1
DataBank's DFW1 fills 400 South Akard, the 1921 former Federal Reserve Bank of Dallas and one of downtown Dallas's main carrier hotels. DataBank bought the building back from Digital Realty in 2023.
17.04 miles Lumen Dallas 4
Lumen Dallas 4 is a Lumen network colocation suite on the fifth floor of 400 South Akard, DataBank's carrier hotel in downtown Dallas.
17.04 miles Opus Interactive Dallas
In 2014, Opus Interactive expanded its data center footprint in Dallas, Texas, with additional colocation and cloud hosting infrastructure.
17.05 miles Cogent: 400 S Akard
Former Cogent Communications data center in Suite 700 of 400 South Akard Street in downtown Dallas. Cogent closed the 8,000 sq ft site in 2025.
17.23 miles Lumen Dallas 3
Lumen Dallas 3 is a small Lumen network point of presence in One Main Place, a 33-story office tower at 1201 Main Street in downtown Dallas.
17.27 miles Carrier-Neutral Data CenterInterested in this information?Contact us
17.35 miles Global IP Networks: Dallas
Global IP Networks runs a colocation and network site inside the 2020 Live Oak data center tower in downtown Dallas.
17.37 miles Provision Data Services
Provision Data Services runs a colocation data center in a 12-story former insurance office tower on Live Oak Street in downtown Dallas.
17.38 miles Sprocket DAL1
Sprocket Networks ran its primary DAL1 hosting data center in the 2020 Live Oak tower in downtown Dallas until about 2014.
17.59 miles Earthlink Dallas
Former EarthLink colocation suite at 2323 Bryan Street in downtown Dallas, opened in 2013. EarthLink sold its IT services and data center business to Synoptek in 2016.
17.60 miles LOGIX Dallas (2323 Bryan)
LOGIX Fiber Networks' colocation suite in the 2323 Bryan Street carrier hotel in downtown Dallas, which LOGIX took over when it bought Alpheus Communications in 2018.
17.60 miles Equinix Dallas DA4
Equinix DA4 is a colocation suite at 2323 Bryan Street in downtown Dallas that LayerOne opened in 2000 and Equinix acquired with Switch and Data in 2010.
17.60 miles Digital Realty: DFW10
Digital Realty's DFW10 at 2323 Bryan Street is one of downtown Dallas's two main carrier hotels, a 26-story tower with more than 60 carriers and the building meet-me room.
17.61 miles DataCanopy Dallas
This former downtown Dallas data center occupied a suite in an office building on Ross Avenue, run in turn by NeoSpire, Hosting.com, Ntirety and Data Canopy.
17.67 miles Cogent: Dallas 2
Cogent Communications runs a small carrier-neutral colocation data center in a former Sprint network building on Parkhouse Street, west of downtown Dallas.
18.17 miles AT&T: Dallas Toll Building
AT&T's Dallas Toll Building is a 20-story telephone switching and long-distance routing building on Bryan Street, east of downtown Dallas.
18.27 miles Flō Networks: Dallas XCN (4316 Bryan)
XCN is a small carrier-neutral telecom colocation building on Bryan Street east of downtown Dallas, built up by XC Networks and now run with Flō Networks.
18.28 miles AT&T: Dallas Tandem (4211 Bryan)
AT&T's 4211 Bryan Street building is a fortified 1961 switching center east of downtown Dallas that serves as a regional tandem and backbone node.
18.74 miles Colovore: Mesquite DFW01
Colovore plans a liquid-cooled colocation data center on Long Creek Road in Mesquite; the city denied a related zoning amendment in March 2026.
18.81 miles Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
The Infomart at 1950 North Stemmons Freeway is the main interconnection hub of Dallas and the South Central US. Equinix owns the 1.5 million sq ft building and runs its DA1, DA2, DA3 and DA6 data centers inside it, beside several other colocation providers.
18.82 miles Lumen Dallas 2
Lumen Dallas 2 is a Lumen network colocation suite in the Dallas Infomart, the city's main interconnection hub at 1950 North Stemmons Freeway.
18.83 miles DataBank DFW5
DataBank's DFW5 is a colocation suite inside the Dallas Infomart, the city's main interconnection hub, run before DataBank by CoreXchange and Zayo's zColo.
18.84 miles Cologix: DAL1
Cologix DAL1 & DAL2 and DAL 3 are located in the carrier dense Infomart.
18.85 miles Flexential Dallas Infomart I-V
18.86 miles BoA: Dallas Infomart
Bank of America's data center inside the Dallas Infomart at 1950 North Stemmons Freeway, in service since 2008.
18.87 miles Cologix: DAL3
DAL3 is a 13.2K SQFT facility located in the renowned Infomart building at 1950 North Stemmons Freeway.
18.88 miles Cologix: DAL2
DAL2 is a 12,000-square-foot facility located in the Infomart building at 1950 North Stemmons Freeway. Cologix opened its second site at the Dallas Infomart in 2013.
18.93 miles Equinix Dallas DA11
DA11 is Equinix's expansion next to the Infomart.
19.36 miles CleanArc: Dallas Campus
Crow Holdings and CleanArc Data Centers are developing a data center campus at the Dallas Market Center in the Stemmons Corridor of central Dallas.
19.66 miles KDC: Midlothian Digital Ranch
KDC plans the Digital Ranch data center campus on about 396 acres south of the Midlothian RailPort, with on-site power generation.
19.70 miles Aligned: DFW-03
Aligned's DFW-03 is a two-story data center under construction on Britton Road in east Mansfield, south of Fort Worth.
19.71 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.73 miles South TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.79 miles Center PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.97 miles PowerHouse: Grand Prairie Campus
PowerHouse Data Centers and Provident are building a 28-building data center campus off Miller Road in Grand Prairie, south of Dallas, with an on-site Oncor switching station.
19.98 miles HostPapa DFW1
ColoCrossing, owned by HostPapa, runs a small colocation and dedicated server footprint inside TierPoint's Dallas data center on Irving Boulevard.
19.98 miles Contegix Dallas
Contegix ran hosting inside TierPoint's Dallas data center on Irving Boulevard before it left the hosting business.
19.98 miles TierPoint Dallas (Colo4)
TierPoint's Dallas data center is a multi-tenant colocation facility on Irving Boulevard in the Stemmons corridor, opened by Colo4 in 2000.
19.99 miles QuadraNet Dallas
QuadraNet runs a small hosting footprint inside TierPoint's Dallas data center on Irving Boulevard; Edge Centres has owned QuadraNet since 2024.
20.00 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

DataBank is a data center developer and operator that provides colocation, interconnection, cloud and managed services. Founded in 2005 and headquartered in Dallas, the company expanded its footprint through acquisitions and new builds.

Following the December 2020 close of its purchase of zColo assets from Zayo, DataBank reported operating 60 data centers across 28 markets in the U.S. and the U.K. In October 2024, DataBank announced an approximately $2.0 billion equity raise led by AustralianSuper to support new campuses in Dallas, Culpeper and Atlanta.

DataBank History:

  • In October 2024, announced an approximately $2.0 billion equity raise led by AustralianSuper to fund development of new campuses in Dallas, Culpeper, and Atlanta.
  • In December 2020, Databank closed the acquisition of zColo data center assets in the U.S. and U.K. from Zayo.
  • In January 2017, Boca Raton-based Digital Bridge Holdings acquired DataBank. DataBank will continue to operate independently
  • Also in January 2017 DataBank separately acquired C7 Data Centers and C7's four Utah data centers.
  • In January 2017, acquired facilities in Cleveland and Pittsburgh from 365 Data Centers.
  • In July 2016, acquired by Digital Bridge Holdings from Avista Capital Partners.
  • Founded in 2005 in Dallas, Texas.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read DataBank Raises $2bn for Dallas Data Center Buildout
DataBank Raises $2bn for Dallas Data Center Buildout

DataBank Raises $2bn for Dallas Data Center Buildout

April 22, 2026 Dallas

US data center firm DataBank has secured new financing to support the build-out of three data centers in Dallas, Texas. The company this week announced it has obtained a $2 billion loan to fund construction of the first three facilities at its new Red Oak campus. DataBank said the deal represents...

Read more
Read Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park
Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

June 18, 2025 Dallas

Cawley Partners has acquired 5,200 acres south of Dallas to potentially develop a large data center park outside Dallas. The acquired South Creek Ranch in the City of Ferris is set to see a mix of uses, including data centers, logistics, manufacturing, and residential. “This particular piece of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.