|
11.10 miles
|
Prometheus Hyperscale: Dallas 3
|
Prometheus Hyperscale’s third 50MW facility at its Kaufman County, Texas campus, part of a 200MW AI-focused development with on-site generation and battery storage, expected online in early 2028.
|
|
11.10 miles
|
Prometheus Hyperscale: Dallas
|
Prometheus Hyperscale’s 200MW Dallas-area campus in Kaufman County, Texas, on a 500-acre site, featuring four liquid-cooled buildings powered by behind-the-meter gas generation and battery storage, with first capacity expected in 2026 and phased expansion beyond 2027.
|
|
11.10 miles
|
Prometheus Hyperscale: Dallas 2
|
Prometheus Hyperscale’s second 50MW facility at its Kaufman County, Texas campus, part of a 200MW AI-focused development with on-site generation and battery storage, expected online in Q2 or Q3 2027.
|
|
11.16 miles
|
Prometheus Hyperscale: Dallas 4
|
Prometheus Hyperscale’s fourth 50MW facility at its Kaufman County, Texas campus, completing a 200MW AI-focused development with on-site generation and battery storage, expected online in late 2028.
|
|
12.96 miles
|
Sprocket DAL1
|
|
|
12.96 miles
|
Earthlink Dallas
|
|
|
12.96 miles
|
LOGIX Dallas (2323 Bryan)
|
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
|
|
12.96 miles
|
Digital Realty: DFW10
|
Digital Realty's 2323 Bryan Street is an internet gateway and carrier facility in Dallas. Located in the Central Business District (CBD), the building consists of 26 floors and approximately 477,000 SF of datacenter, PBB and office space.
Telx (acquired by DRT) operated the building's Meet-Me Room (MMR). The 35,036 sqft MMR is in suite 2440.
|
|
12.96 miles
|
Equinix Dallas DA4
|
|
|
12.96 miles
|
Provision Data Services
|
The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.
|
|
13.16 miles
|
Opus Interactive Dallas
|
In 2014, Opus Interactive expanded its data center footprint in Dallas, Texas, with additional colocation and cloud hosting infrastructure.
|
|
13.16 miles
|
400 S Akard - Digital Realty
|
The building is a eight story (7 stories with a basement) multi-tenant data center.
|
|
13.17 miles
|
Lumen Dallas 4
|
|
|
13.17 miles
|
Sprocket DAL2
|
|
|
13.17 miles
|
Cogent: 400 S Akard
|
|
|
13.17 miles
|
DataBank Downtown Dallas DFW1
|
DataBank's 400 South Akard is a seven-story property built in 1921 to house the U.S. Federal Reserve Bank of Dallas. In 2000 the building was renovated as a datacenter, taking advantage of security features from its use as a banking facility.
|
|
13.25 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
13.25 miles
|
Aphorio Carter: Dallas
|
The Dallas Data Center is a premier colocation facility located on a 7.61-acre campus in Dallas, Texas. Spanning 125,538 rentable square feet, the property is fully leased to a prominent, NYSE-listed global consumer internet company.
|
|
13.32 miles
|
DataCanopy Dallas
|
|
|
13.38 miles
|
Lumen Dallas 3
|
|
|
13.81 miles
|
Prime: Garland, TX
|
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
|
|
13.98 miles
|
Prime: DFW02-03
|
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
|
|
13.99 miles
|
Prime: DFW02-02
|
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
|
|
14.19 miles
|
QTS: DFW2-DC7
|
QTS is expanding its South Dallas campus with DC7, a new two-story data center building planned near Wilmer in southern Dallas County.
|
|
14.49 miles
|
Flexential Dallas Infomart I-V
|
|
|
14.49 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of Stream Data Centers' DFWC Campus in Texas.
|
|
14.49 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of Stream Data Centers' DFWC Campus in Texas.
|
|
14.50 miles
|
Verizon Dallas (Infomart)
|
Verizon established a new Point of Presence (PoP) in the Infomart Dallas carrier-neutral Building Meet-Me Room (BMMR) in August 2017.
|
|
14.51 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of Stream Data Centers' DFWC Campus in Texas.
|
|
14.51 miles
|
Cologix: Dallas DAL1
|
Cologix DAL1 & DAL2 and DAL 3 are located in the carrier dense Infomart.
|
|
14.51 miles
|
Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
|
The Infomart is the center of network Interconnection and Peering in Dallas. In fact, the Infomart is the nexus of the Interconnection marketplace for the entire South Central United States. The only other building with reasonable network density is Digital Realty's 2323 Bryant Street.
|
|
14.51 miles
|
Lumen Dallas 2
|
|
|
14.52 miles
|
Cologix: DAL2
|
DAL2 is a 12,000-square-foot facility located in the Infomart building at 1950 North Stemmons Freeway. Cologix opened its second site at the Dallas Infomart in 2013.
|
|
14.54 miles
|
Cologix: DAL3
|
DAL3 is a 13.2K SQFT facility located in the renowned Infomart building at 1950 North Stemmons Freeway.
|
|
14.54 miles
|
DataBank DFW5
|
|
|
14.61 miles
|
Equinix Dallas DA11
|
DA11 is Equinix's expansion next to the Infomart.
|
|
14.64 miles
|
QTS: DFW2-DC1
|
QTS is building a new data center campus outside Dallas, Texas. The company aims to develop a two-story, 413,725 sq ft (38,436 sqm) building in the Lancaster area of Dallas County.
|
|
14.65 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Stream Data Centers is currently developing its second hyperscale campus in Wilmer, Texas, situated in South Dallas County.
|
|
14.67 miles
|
Digital Realty: 1505 Ferris
|
DRT's 181,200 square foot (16,800 sqm) core & shell data center is located on Ferris Road in Garland, TX.
|
|
14.67 miles
|
QTS: DFW2-DC3
|
QTS is expanding its DFW2 data center campus through the construction of two additional buildings in Wilmer, Dallas County.
|
|
14.69 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of Stream Data Centers' DFWC Campus in Texas.
|
|
14.71 miles
|
Cawley Partners: South Creek Ranch
|
The initial plans for this expansive property designate 2,000 acres in the northern section specifically for digital commerce parks, which will include data centers.
|
|
14.72 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of Stream Data Centers' DFWC Campus in Texas.
|
|
14.78 miles
|
QTS: DFW2-DC2
|
The Texas Department of Licensing and Regulation (TDLR) received two applications from QTS for data center developments in Wilmer, Dallas County.
|
|
14.79 miles
|
Digital Realty: DFW37
|
Digital Realty has filed to expand its planned data center campus in the Garland area of Dallas, Texas. The company is planning to construct a 410,000 sq ft (38090 sqm) data center building comprised of a tenant office and six data halls.
|
|
14.79 miles
|
Project Orange Expansion
|
|
|
14.82 miles
|
Project Labrador
|
WHL Dallas 45 LLC has filed development plans for Project Labrador, a massive data center campus planned for a 419-acre site in the Lancaster area of Dallas.
|
|
14.87 miles
|
Verizon Dallas (Richardson)
|
|
|
14.92 miles
|
Project Orange
|
WHL Dallas 45 LLC has filed development plans for Project Orange, a massive data center campus planned in the Lancaster area of Dallas.
|
|
14.92 miles
|
Digital Garland
|
|
|
14.93 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of Stream's Dallas DFW-B campus in Texas.
|
|
14.99 miles
|
Project Labrador Expansion
|
|
|
14.99 miles
|
QTS: DFW2-DC6
|
QTS is developing a 363,500 square-foot data center in a two-story building, featuring office and shell data hall space, in Fort Worth.
|
|
15.01 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of Stream's Dallas DFW-B campus in Texas.
|
|
15.07 miles
|
Stream: Dallas DFW-B1
|
Stream Data Centers is building a 690,000 sq. ft. hyperscale campus on 77 acres in Wilmer. The first 135,000 square-foot (12,540 sq. m.) phase of the project is located near I-45 and East Belt Line Road in Wilmer.
|
|
15.12 miles
|
QTS: DFW2-DC5
|
QTS is developing a 363,500 square-foot data center in a two-story building, featuring office and shell data hall space, in Fort Worth.
|
|
15.21 miles
|
NTT: TX4
|
NTT is expanding in Garland, adding another building to its existing campus. The project will consist of a new 235,910 sq ft (21,915 sqm) data center.
|
|
15.30 miles
|
NTT Dallas TX1
|
RagingWire’s Dallas TX1 Datacenter is a 16 megawatt facility with 230,000 square feet of data center space. TX1 is the first phase of a 42 acre campus that can expand capacity up to 80 megawatts and 1 million sqft spread across 5 interconnected buildings.
|
|
15.31 miles
|
NTT TX2
|
NTT TX2 is the second building of NTT's Garland campus. The datacenter building is 229,500 square feet in size with two-story office and loading dock located on the ground floor.
|
|
15.34 miles
|
NTT: TX3
|
NTT TX3 is the third building of NTT's Garland campus. The datacenter building is approximately 229,500 square feet in size consisting of additional office space and adding equipment to data vaults.
|
|
15.44 miles
|
Stream: DFWA-1
|
In January 2020, Stream commissioned phase I of a greenfield hyperscale data center development on a 23-acre site in Garland, next to northeast Dallas, Texas.
|
|
15.53 miles
|
CleanArc: Dallas Campus
|
CleanArc Data Centers and Crow Holdings are partnering to develop a turnkey data center campus in central Dallas, Texas.
|
|
15.59 miles
|
900 N Dorothy
|
|
|
15.60 miles
|
Digital Realty: DFW35
|
This facility is a part of Digital Dallas Campus in Richardson.
|
|
15.66 miles
|
Digital Dallas Campus in Richardson - Digital Realty
|
|
|
15.68 miles
|
Digital Realty: DFW18
|
This facility is a part of Digital Dallas Campus in Richardson
|
|
15.70 miles
|
DataBank North Dallas DFW2
|
The facility is located in Northern Dallas in the Technology Business Corridor
|
|
15.73 miles
|
Digital Realty: DFW29
|
This facility is a part of Digital Dallas Campus in Richardson.
|
|
15.74 miles
|
H5 Colo
|
|
|
15.75 miles
|
Digital Realty: DFW25
|
Located in the epicenter of North Dallas' high-technology corridor on the 69-acre Digital Dallas campus, this facility offers over 100,000 square feet of space and connectivity to more than 60 network service providers.
|
|
15.75 miles
|
Rackspace Richardson DFW3
|
In 2012, US hosting company Rackspace signed a long-term lease for more than 58,000 sq ft of raised floor space at Digital Realty Trust's data center campus in Richardson, Texas (Dallas metro).
|
|
15.76 miles
|
Digital Realty: DFW17
|
This facility is a part of Digital Dallas Campus in Richardson
|
|
15.83 miles
|
Digital Realty: DFW28
|
This facility is a part of Digital Dallas Campus in Richardson
|
|
15.84 miles
|
Digital Realty: DFW16
|
This facility is a part of Digital Dallas Campus in Richardson.
|
|
15.84 miles
|
Equinix Dallas DA10
|
The site was previously was a Terremark NAP of Dallas
|
|
15.88 miles
|
AT&T Switching Station (Richardson)
|
A fire in October 2018 at this AT&T switching site caused a widespread outage of AT&T Internet and U-Verse TV services across North Texas.
|
|
16.01 miles
|
EdgeCore Dallas
|
|
|
16.07 miles
|
Stack: DFW02 Campus
|
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
|
|
16.15 miles
|
Stack: DFW02B
|
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
|
16.15 miles
|
Stack: DFW02D
|
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
|
16.22 miles
|
Stack: DFW02E
|
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
|
16.23 miles
|
Stack: DFW02C
|
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
|
16.29 miles
|
Stack: DFW02F
|
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
|
16.38 miles
|
Yondr: Lancaster, TX
|
Yondr Group is expanding its U.S. presence with a new data center campus in Lancaster, Texas.
|
|
16.38 miles
|
Yondr: Lancaster Expansion
|
|
|
16.41 miles
|
CyrusOne: Dallas DFW6
|
CyrusOne invested $79.8 million to retrofit an existing building in Richardson, Texas, transforming it into their new DFW6 data center.
|
|
16.42 miles
|
DigiCo: Dallas DAL1
|
In January 2025, the newly established DigiCo Infrastructure REIT acquired State Farm’s Richardson data center from JDM III AZ LLC. The 129,170 sq ft facility, which was originally built by the insurance provider in 2015.
|
|
16.49 miles
|
DataBank DFW7 LBJ
|
|
|
16.64 miles
|
Stream DFW IV
|
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
|
|
16.64 miles
|
Mapletree: 3300 Essex
|
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
|
|
16.75 miles
|
Contegix Dallas
|
|
|
16.75 miles
|
QuadraNet Dallas
|
|
|
16.76 miles
|
HostPapa DFW1
|
|
|
16.78 miles
|
TierPoint Dallas (Colo4)
|
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
|
|
16.96 miles
|
Cisco Richardson TXDC1
|
|
|
17.01 miles
|
Equinix: Dallas DA12
|
Equinix is expanding its Texas footprint with the development of DA12, a massive $836 million data center campus located at the former Taylor Publishing site in West Dallas.
|
|
17.02 miles
|
Stream: DFW V
|
In 2015, Texas-based Stream Data Centers sold a 73,320 sqft data center to a local financial services company and was then immediately hired to run it.
|
|
17.29 miles
|
Flexential Dallas (Plano)
|
Flexential's Plano site in Dallas is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
|
|
17.38 miles
|
Lumen Dallas 1
|
|
|
17.40 miles
|
Verizon: 1300 W Mockingbird
|
Former XO facility
|
|
17.49 miles
|
Aligned: DFW-02
|
Aligned DFW-02 is the second building of Aligned's Plano Data center campus. DFW-02 is part of a 19-acre campus offering 36 megawatts of critical capacity across 220,000 sq. ft.
|
|
17.52 miles
|
Evocative: DAL1
|
|
|
17.52 miles
|
Aligned Plano
|
Aligned's DFW-01 data center is located on a 19-acre campus at 2800 Summit Avenue in Plano. The facility offers 375000 gross square feet of space and 60 megawatts of power.
|
|
17.64 miles
|
DataBank DFW6 Love Field
|
|
|
17.66 miles
|
Ascent Dallas DAL1
|
|
|
17.77 miles
|
CoreSpace Dallas
|
|
|
17.82 miles
|
365 Richardson, TX
|
|
|
17.85 miles
|
Global IP Networks - Plano
|
|
|
17.87 miles
|
DataBank DFW4 Empire Central
|
The site was acquired by Zayo in January 2016 from Stream Datacenters.
|
|
17.95 miles
|
8435 Stemmons - Digital Realty
|
|
|
18.03 miles
|
Skybox: PowerCampus Dallas
|
The Skybox PowerCampus is Located at Oncor’s deregulated power territory, Lancaster, TX. PowerCampus™ Dallas will strategically address emerging high-density compute needs in the Dallas area providing up to 300 MWs of power
|
|
18.12 miles
|
South RidgeInterested in this information?Contact us
|
In northern Texas, Project Fei is a data center project co-located with a 240 MW utility-scale solar farm.
|
|
18.38 miles
|
Fiberhub DFW1
|
|
|
18.38 miles
|
Prime: Dallas DFW01
|
In April 2023, Prime Data Centers discreetly added Dallas to its list of data center locations. The company now has a presence at 1515 Round Table Drive in Dallas, offering 6MW of capacity across a 106,865 square foot (9,930 square meter) facility.
|
|
18.41 miles
|
Evocative DA4
|
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
|
|
18.45 miles
|
Prime: DFW01-02
|
Prime Data Centers is planning to develop a three-story, 96,800 sq ft (8,995 sqm) data center at 1455 Round Table Drive in Dallas County.
|
|
18.55 miles
|
Lumen Dallas 6
|
|
|
18.62 miles
|
Digital Realty: DFW14
|
|
|
18.63 miles
|
DataBank: DFW16
|
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
|
18.64 miles
|
Flexential Dallas (Synergy Park)
|
|
|
18.67 miles
|
DataBank: DFW11
|
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
|
18.68 miles
|
DataBank: DFW12
|
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
|
18.82 miles
|
Databank: Red Oak DFW9
|
DataBank is planning a $256 million data center project in Red Oak, Ellis County, Texas. The facility, named DFW9, will be located on Stainback Road and cover over 425,000 sq ft (40,000 sqm).
|
|
18.83 miles
|
DataBank: DFW10
|
DataBank is building a second data center at its upcoming Red Oak campus in Dallas, Texas.
|
|
18.83 miles
|
DataBank: DFW15
|
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
|
18.86 miles
|
DataBank: DFW14
|
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
|
18.89 miles
|
DataBank: DFW13
|
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
|
18.91 miles
|
NTT 2300 W Plano
|
In January 2019, GI Partners bought the more than 1 million-square-foot office and tech complex at 2300 W. Plano Parkway near Bush Turnpike.
|
|
19.57 miles
|
Cloud ParkInterested in this information?Contact us
|
Amazon Web Services (AWS) operates a 30,000 square foot (2,790 sq m) data center located in DeSoto, outside Dallas, Texas.
|
|
19.72 miles
|
Mobius: Farmers Branch
|
|
|
19.87 miles
|
Centersquare: Dallas DFW3
|
The Centersquare Dallas portfolio consists of three data centers located in Fort Worth, Allen and Dallas providing close proximity to business hubs in downtown Dallas, Plano and Fort Worth.
|