Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 0.00 miles | Verizon: 1220 L | |
| 0.03 miles | CoreSite DC1 - 1275 K Street NW |
1275 K Street is Washington DC's Network Hotel
|
| 0.15 miles | CoreSite DC2 | |
| 0.23 miles | Lumen DC 1 | |
| 0.23 miles | Cogent: 1120 Vermont | |
| 0.24 miles | Verizon: 1120 Vermont |
Former XO Communications site
|
| 0.75 miles | Lumen DC4 | |
| 3.42 miles | Verizon: 4301 Connecticut | |
| 6.86 miles | TAC: Northern Virginia |
TAC Data Centers is partnering to develop a premier hyperscale data center on a 125-acre site in Northern Virginia, the world’s most dynamic data center market.
|
| 9.27 miles | Starwood: Alexandria, VA |
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
|
| 9.34 miles | Lerner: Landover Expansion | |
| 9.39 miles | Lerner: Landover, MD |
|
| 9.91 miles | Lumen McLean 1 | |
| 9.97 miles | DataBank McLean IAD2 |
In 2020, DataBank acquired the site from zColo.
|
| 10.26 miles | Element Critical VA1 |
|
| 10.30 miles | Equinix Vienna DC7 |
|
| 10.61 miles | 8100 Boone - Digital Realty |
|
| 10.69 miles | Cogent Vienna | |
| 11.25 miles | 12401 Prosperity Dr: Lincoln Rackhouse |
12401 Prosperity Dr. is an enterprise grade, highly-secure data center located just 15 miles north of Washington D.C., in Silver Spring, MD.
|
| 11.28 miles | DataBridge: Silver Spring MD |
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
|
| 11.47 miles | Equinix Vienna DC8 | |
| 11.72 miles | AiNET Beltsville WDC-1 |
|
| 13.98 miles | Hyperscale Data Center Request Dataset |
The site was previously occupied by two office buildings that were constructed about 10 years ago but never fully occupied. These buildings, located at 7951 and 7961 Loisdale Road, were demolished in early June 2023.
|
| 14.56 miles | TPC: Konterra 1 |
TPC Data Center is planning its first data center in Prince George's County at 6201 Frost Place in Laurel, close to the Burtonsville substation.
|
| 16.33 miles | 1780 Business Center Drive (VA3) Digital Realty |
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
| 16.45 miles | Evocative: Virginia, IAD1 |
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
| 16.62 miles | Lincoln Rackhouse 1807 Michael Faraday |
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
| 16.78 miles | AiNET Laurel SCIF | |
| 18.32 miles | CoreSite VA2 |
|
| 18.33 miles | CoreSite Reston Campus VA1 |
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
| 18.33 miles | Contegix Reston |
The Contegix site is on CoreSite's Reston Campus
|
| 18.68 miles | CoreSite Reston VA3 |
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
| 19.14 miles | H5: Herndon |
|
| 19.32 miles | Lincoln Rackhouse 251 Exchange |
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
| 19.32 miles | Cogent: 510 Huntmar |
Cogent exited the data center and it is currently available to lease.
|
| 19.43 miles | Lumen Herndon 3 | |
| 19.44 miles | Lumen Herndon 1 |
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
October 16, 2023
Lumen Technologies
August 03, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas