0.17 miles
|
TowerInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
0.28 miles
|
Core ValleyInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
0.37 miles
|
Ridge UltraInterested in this information?Contact us
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
|
0.57 miles
|
Digital Realty: 9905 Godwin
|
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
|
|
0.69 miles
|
QTS: Manassas DC3
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
0.71 miles
|
QTS Manassas DC6
|
This facility is part of QTS Manassas 1 Campus in Virginia.
|
|
0.75 miles
|
QTS: Manassas DC2
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
0.79 miles
|
RidgeInterested in this information?Contact us
|
The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.
|
|
0.79 miles
|
QTS Manassas DC1
|
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
|
0.84 miles
|
Digital Realty: IAD50
|
|
|
0.87 miles
|
QTS: Manassas DC4
|
|
|
0.89 miles
|
Digital Realty: IAD51
|
|
|
0.90 miles
|
Station AlphaInterested in this information?Contact us
|
Amazon is building another data center in it's Innovation Drive campus.
|
|
0.92 miles
|
Tower UltraInterested in this information?Contact us
|
The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.
|
|
0.92 miles
|
East ParkInterested in this information?Contact us
|
The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.
|
|
0.98 miles
|
Hub ThreeInterested in this information?Contact us
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
|
1.01 miles
|
Metro RidgeInterested in this information?Contact us
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
|
1.03 miles
|
CloudInterested in this information?Contact us
|
Amazon's Tanner Way Campus in Manassas comprises four single-story data center buildings, spanning a total of 795,191 square feet.
|
|
1.05 miles
|
QTS Manassas DC5
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
1.11 miles
|
Stack: NVA05C
|
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
|
|
1.12 miles
|
TowerInterested in this information?Contact us
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
|
1.17 miles
|
CloudHQ: MDC3
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
1.18 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
|
1.20 miles
|
CloudHQ: MDC2
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
1.26 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
|
1.26 miles
|
CloudHQ: Manassas MDC Campus
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
1.27 miles
|
CloudInterested in this information?Contact us
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
|
1.28 miles
|
TPC: Manassas, VA
|
|
|
1.35 miles
|
Cloud StationInterested in this information?Contact us
|
|
|
1.35 miles
|
Core RidgeInterested in this information?Contact us
|
|
|
1.41 miles
|
JK Land: Comcast Center
|
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
|
|
1.50 miles
|
Stack: NVA05D
|
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
|
|
1.61 miles
|
HubInterested in this information?Contact us
|
|
|
1.68 miles
|
Ridge OneInterested in this information?Contact us
|
|
|
1.71 miles
|
Edge PlazaInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
|
1.72 miles
|
Edge ValleyInterested in this information?Contact us
|
|
|
1.72 miles
|
Evoswitch USA WDC 1
|
|
|
1.72 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
|
1.72 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
|
1.74 miles
|
CloudHQ MCC2
|
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
|
|
1.76 miles
|
CloudHQ: MCC7
|
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
|
|
1.76 miles
|
ParkInterested in this information?Contact us
|
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
|
|
1.80 miles
|
Stack: NVA02C
|
The facility has a substantial footprint of 15,000 square feet, encompassing both critical and non-critical spaces.
|
|
1.82 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
|
1.85 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
|
1.98 miles
|
Stack: NVA02D
|
STACK Infrastructure NVA02D, Building D of NVA02 Campus, is located at Hornbaker Road in Manassas.
|
|
2.01 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
|
|
2.02 miles
|
CloudHQ: MCC5
|
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
|
|
2.04 miles
|
CloudHQ: MCC4
|
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
|
|
2.05 miles
|
Stack: NVA02G
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.06 miles
|
Stack: NVA02F
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.10 miles
|
Stack: NVA02E
|
STACK Infrastructure's NVA02E, Building E of NVA02 Campus, is located at Hornbaker Road in Manassas. The data center spans a substantial footprint of 280,000 square feet, encompassing both critical and non-critical spaces.
|
|
2.15 miles
|
CloudHQ Manassas MCC1
|
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
|
|
2.15 miles
|
North ParkInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
|
2.25 miles
|
CloudHQ: MCC6Z
|
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
|
|
2.30 miles
|
CloudHQ: MCC6A
|
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
|
|
2.33 miles
|
Stack: Bristow 2 (NVA02L)
|
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
|
|
2.33 miles
|
CenterInterested in this information?Contact us
|
|
|
2.37 miles
|
CloudHQ MCC3
|
CloudHQ MCC3 is a part of The MCC data center campus.
|
|
2.38 miles
|
Stack: NVA02I
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.40 miles
|
Stack: NVA02J
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.50 miles
|
Stack: NVA02H
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.52 miles
|
Iron Mountain: VA-6
|
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
|
|
2.54 miles
|
Stack: Bristow Campus (NVA02K)
|
Stack Infrastructure planned to build a large-scale data center campus on a 58-acre site in Bristow, but Prince William County supervisors voted to reject STACK Infrastructure’s proposed Bristow Campus.
|
|
2.68 miles
|
Metro ParkInterested in this information?Contact us
|
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
|
|
2.77 miles
|
Iron Mountain: VA-8
|
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
|
|
2.80 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
|
2.86 miles
|
Iron Mountain: VA-7
|
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
|
|
2.93 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
|
2.98 miles
|
West TowerInterested in this information?Contact us
|
|
|
3.03 miles
|
Opus Interactive Manassas
|
|
|
3.12 miles
|
Campus ProInterested in this information?Contact us
|
|
|
3.12 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
|
3.13 miles
|
OneInterested in this information?Contact us
|
|
|
3.20 miles
|
ThreeInterested in this information?Contact us
|
|
|
3.20 miles
|
Iron Mountain VA-2
|
|
|
3.22 miles
|
Iron Mountain: Manassas Point
|
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
|
3.29 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
|
3.60 miles
|
Prime PointInterested in this information?Contact us
|
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
|
|
3.63 miles
|
West TowerInterested in this information?Contact us
|
|
|
3.64 miles
|
Station TwoInterested in this information?Contact us
|
|
|
3.67 miles
|
CenterInterested in this information?Contact us
|
|
|
3.73 miles
|
Campus ProInterested in this information?Contact us
|
|
|
3.78 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
3.81 miles
|
Station GammaInterested in this information?Contact us
|
|
|
3.86 miles
|
Equinix Manassas DC14
|
|
|
3.90 miles
|
Global ParkInterested in this information?Contact us
|
|
|
3.95 miles
|
North TowerInterested in this information?Contact us
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
|
3.96 miles
|
TowerInterested in this information?Contact us
|
|
|
3.98 miles
|
Global ParkInterested in this information?Contact us
|
Amazon Data Services has expanded its footprint in Northern Virginia’s hyper-competitive data center corridor with a $120 million acquisition of 44 contiguous acres in Manassas, Prince William County.
|
|
3.98 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
4.00 miles
|
UltraInterested in this information?Contact us
|
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
|
|
4.00 miles
|
Central StationInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
4.04 miles
|
Station UltraInterested in this information?Contact us
|
|
|
4.04 miles
|
BlackChamber: Gainesville, VA
|
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
|
|
4.20 miles
|
Plaza PlusInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
4.25 miles
|
ThreeInterested in this information?Contact us
|
|
|
4.29 miles
|
Plaza OneInterested in this information?Contact us
|
Amazon Data Services acquired the 269-acre site of the planned Devlin Technology Park in Prince William County, Bristow, in late 2025.
|
|
4.34 miles
|
NorthInterested in this information?Contact us
|
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
|
|
4.87 miles
|
Station ThreeInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
4.88 miles
|
Yondr Bristow Campus
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
|
4.89 miles
|
Park PlusInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
4.93 miles
|
Core PlazaInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
4.96 miles
|
Metro PointInterested in this information?Contact us
|
|
|
4.98 miles
|
Yondr: Bristow Bldg 2
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
|
|
5.12 miles
|
Central PointInterested in this information?Contact us
|
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
|
|
5.21 miles
|
JK Land: Hunter Trust
|
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
|
|
5.24 miles
|
Prime HubInterested in this information?Contact us
|
|
|
5.26 miles
|
North CenterInterested in this information?Contact us
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
|
5.28 miles
|
MetroInterested in this information?Contact us
|
|
|
5.30 miles
|
PrimeInterested in this information?Contact us
|
|
|
5.38 miles
|
South ValleyInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
5.42 miles
|
TowerInterested in this information?Contact us
|
|
|
5.48 miles
|
Data Center Edge District
|
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
|
|
5.53 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
|
5.54 miles
|
CorScale: Gainesville 4
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
5.56 miles
|
CorScale: Gainesville 5
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
5.62 miles
|
CorScale: Gainesville 3
|
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
|
5.70 miles
|
Center BetaInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
5.77 miles
|
CorScale: Gainesville 2
|
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
|
5.83 miles
|
Corscale: Gainesville Crossing
|
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
|
6.95 miles
|
NTT Gainesville VA Campus
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
7.03 miles
|
NTT: VA11
|
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
7.11 miles
|
NTT: VA12
|
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
7.13 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
7.26 miles
|
NTT: VA13
|
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
7.33 miles
|
Gardner Property Project
|
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
|
7.34 miles
|
John Marshall Commons Tech Park
|
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
|
7.40 miles
|
ProInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
7.47 miles
|
Prime CenterInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
7.52 miles
|
PointInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
7.61 miles
|
StationInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
7.74 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
7.74 miles
|
TwoInterested in this information?Contact us
|
Amazon Data Services acquired 91 acres in Manassas for $218m
|
|
8.89 miles
|
Parkstone Tech Park
|
|
|
9.25 miles
|
South CenterInterested in this information?Contact us
|
|
|
9.26 miles
|
Quantico Ridge Data Center
|
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
|
|
9.27 miles
|
Campus AlphaInterested in this information?Contact us
|
|
|
9.32 miles
|
CyrusOne: Vint Hill
|
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
|
|
9.35 miles
|
Headwaters: Catlett, VA
|
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
|
|
9.42 miles
|
OVH US East Vint Hill
|
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
|
|
9.46 miles
|
North StationInterested in this information?Contact us
|
|
|
9.48 miles
|
Tower ProInterested in this information?Contact us
|
|
|
9.48 miles
|
Ridge TwoInterested in this information?Contact us
|
|
|
9.52 miles
|
OVH: Vint Hill Bldg 2
|
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
|
|
10.00 miles
|
Vint Hill Corners
|
The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.
|
|
10.63 miles
|
Metro HubInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
10.64 miles
|
Hub MaxInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
10.77 miles
|
West CenterInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
10.98 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
|
|
11.01 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
11.09 miles
|
TowerInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
11.09 miles
|
Station OneInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
11.23 miles
|
Point GammaInterested in this information?Contact us
|
|
|
11.28 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
11.55 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
11.57 miles
|
Edge ValleyInterested in this information?Contact us
|
|
|
11.57 miles
|
South HubInterested in this information?Contact us
|
|
|
11.60 miles
|
ParkInterested in this information?Contact us
|
|
|
11.64 miles
|
Campus AlphaInterested in this information?Contact us
|
|
|
11.67 miles
|
Valley PlusInterested in this information?Contact us
|
|
|
11.70 miles
|
East CampusInterested in this information?Contact us
|
|
|
11.73 miles
|
CentralInterested in this information?Contact us
|
|
|
11.74 miles
|
North TowerInterested in this information?Contact us
|
|
|
11.95 miles
|
Ridge AlphaInterested in this information?Contact us
|
|
|
11.97 miles
|
ValleyInterested in this information?Contact us
|
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
|
|
11.98 miles
|
Central PointInterested in this information?Contact us
|
|
|
11.99 miles
|
ProInterested in this information?Contact us
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
|
12.04 miles
|
CoreInterested in this information?Contact us
|
|
|
12.12 miles
|
South RidgeInterested in this information?Contact us
|
|
|
12.58 miles
|
East ParkInterested in this information?Contact us
|
|
|
12.68 miles
|
Cloud CampusInterested in this information?Contact us
|
|
|
12.70 miles
|
Campus GammaInterested in this information?Contact us
|
|
|
12.77 miles
|
ParkInterested in this information?Contact us
|
|
|
13.01 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
13.41 miles
|
EastInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
13.43 miles
|
Hub PlusInterested in this information?Contact us
|
|
|
13.46 miles
|
Core CenterInterested in this information?Contact us
|
|
|
13.48 miles
|
Hub PrimeInterested in this information?Contact us
|
|
|
13.50 miles
|
South CampusInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
13.53 miles
|
MaxInterested in this information?Contact us
|
|
|
13.54 miles
|
Global StationInterested in this information?Contact us
|
|
|
13.61 miles
|
Ridge GammaInterested in this information?Contact us
|
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
|
|
13.64 miles
|
PowerHouse Arcola
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
13.67 miles
|
PowerHouse: Arcola Bldg B
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
13.67 miles
|
Global CenterInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
|
|
13.70 miles
|
South PointInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
13.78 miles
|
PointInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
|
|
13.87 miles
|
Central CenterInterested in this information?Contact us
|
|
|
13.88 miles
|
Center MaxInterested in this information?Contact us
|
|
|
13.89 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
13.96 miles
|
East CampusInterested in this information?Contact us
|
|
|
13.99 miles
|
Tower TwoInterested in this information?Contact us
|
|
|
14.00 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
14.02 miles
|
Center AlphaInterested in this information?Contact us
|
|
|
14.05 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
14.12 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
14.12 miles
|
Yondr Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
14.16 miles
|
CloudInterested in this information?Contact us
|
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
|
14.18 miles
|
West StationInterested in this information?Contact us
|
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
14.19 miles
|
Yondr Arcola, VA
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
14.20 miles
|
PrimeInterested in this information?Contact us
|
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
|
|
14.26 miles
|
Station PlusInterested in this information?Contact us
|
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
|
|
14.31 miles
|
Tower UltraInterested in this information?Contact us
|
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
14.32 miles
|
PointInterested in this information?Contact us
|
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
|
|
14.36 miles
|
Core CampusInterested in this information?Contact us
|
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
14.37 miles
|
RidgeInterested in this information?Contact us
|
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
|
|
14.42 miles
|
West PlazaInterested in this information?Contact us
|
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
14.50 miles
|
PrimeInterested in this information?Contact us
|
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
14.50 miles
|
CyrusOne Sterling IX
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
14.52 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
14.56 miles
|
Cloud CenterInterested in this information?Contact us
|
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
|
|
14.56 miles
|
CyrusOne: NVA9 Bldg 2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
14.57 miles
|
CyrusOne: NVA9 Bldg 1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
14.59 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
14.71 miles
|
Stack: Loudoun 2
|
This facility is part of Stack's Loudoun County Campus is Virginia.
|
|
14.72 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
14.74 miles
|
Stack: Loudoun County Campus
|
Stack Infrastructure is further expanding in Virginia with a new 122-acre campus in Loudoun County, near Dulles Airport.
|
|
14.78 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
14.82 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
15.03 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
15.49 miles
|
Maple Tree Farm
|
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
|
|
15.50 miles
|
CoreSite Reston VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
15.56 miles
|
Global CenterInterested in this information?Contact us
|
Amazon Web Services' plans to build a 220,000-square-foot data center at the intersection of Blackwell Road and Lee Highway in Warrenton.
|
|
15.75 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
15.77 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
15.77 miles
|
CoreSite Reston Campus VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
15.85 miles
|
CoreSite VA2
|
|
|
15.94 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
15.99 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.07 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.10 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.16 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
16.16 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
16.25 miles
|
H5: Herndon
|
|
|
16.33 miles
|
Lumen Herndon 3
|
|
|
16.34 miles
|
Lumen Herndon 1
|
|
|
16.37 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
16.50 miles
|
CloudInterested in this information?Contact us
|
|
|
16.54 miles
|
WestInterested in this information?Contact us
|
|
|
16.58 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
16.59 miles
|
Campus TwoInterested in this information?Contact us
|
|
|
16.61 miles
|
PlusInterested in this information?Contact us
|
|
|
16.62 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
16.67 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
16.68 miles
|
Cloud PointInterested in this information?Contact us
|
|
|
16.72 miles
|
Plaza AlphaInterested in this information?Contact us
|
|
|
16.73 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
16.75 miles
|
Tower PlusInterested in this information?Contact us
|
|
|
16.78 miles
|
Centersquare: IAD2-B
|
|
|
16.79 miles
|
RidgeInterested in this information?Contact us
|
|
|
16.81 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
16.82 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
16.83 miles
|
Campus UltraInterested in this information?Contact us
|
|
|
16.84 miles
|
StationInterested in this information?Contact us
|
|
|
16.87 miles
|
StationInterested in this information?Contact us
|
|
|
16.89 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
16.89 miles
|
Point GammaInterested in this information?Contact us
|
The site was previously occupied by two office buildings that were constructed about 10 years ago but never fully occupied. These buildings, located at 7951 and 7961 Loisdale Road, were demolished in early June 2023.
|
|
16.89 miles
|
CentralInterested in this information?Contact us
|
|
|
16.91 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
16.98 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
16.98 miles
|
Hub TwoInterested in this information?Contact us
|
|
|
17.02 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
17.06 miles
|
North StationInterested in this information?Contact us
|
|
|
17.06 miles
|
NorthInterested in this information?Contact us
|
|
|
17.07 miles
|
CloudInterested in this information?Contact us
|
|
|
17.09 miles
|
GammaInterested in this information?Contact us
|
|
|
17.13 miles
|
East StationInterested in this information?Contact us
|
|
|
17.14 miles
|
44351 Import Plz
|
|
|
17.14 miles
|
Center ThreeInterested in this information?Contact us
|
|
|
17.16 miles
|
Core ValleyInterested in this information?Contact us
|
|
|
17.18 miles
|
GammaInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
17.20 miles
|
Import Plz, Ashburn
|
|
|
17.20 miles
|
CampusInterested in this information?Contact us
|
|
|
17.20 miles
|
North CenterInterested in this information?Contact us
|
|
|
17.23 miles
|
QTS: ASH2 DC2
|
DC2 is the second building of Ashburn's Lockridge ASH2 Campus.
|
|
17.23 miles
|
Core HubInterested in this information?Contact us
|
|
|
17.24 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
17.24 miles
|
Tower ProInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
17.26 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
17.27 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
|
17.27 miles
|
QTS Ashburn Lockridge
|
QTS Lockridge ASH2 hyperscale campus is located in Sterling, Virginia. Comprising two bookend buildings on a tight infill site, the two-story single-use facilities span a 28-acre campus.
|
|
17.28 miles
|
Edge CampusInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
17.31 miles
|
QTS Ashburn-Shellhorn
|
|
|
17.32 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
17.37 miles
|
QTS Ashburn-Shellhorn DC2
|
|
|
17.42 miles
|
Cloud TowerInterested in this information?Contact us
|
|
|
17.45 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
17.45 miles
|
Connect Data Centers: Sterling, VA
|
|
|
17.46 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
|
17.47 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
17.50 miles
|
Core PointInterested in this information?Contact us
|
|
|
17.51 miles
|
Tower GammaInterested in this information?Contact us
|
|
|
17.53 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
17.54 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
17.56 miles
|
Stack: NVA04B
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
17.56 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
|
17.57 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
17.60 miles
|
Vantage VA16
|
|
|
17.61 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
17.61 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
17.62 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
17.62 miles
|
Vantage: VA23
|
This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
|
|
17.62 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
17.62 miles
|
Stack: NVA04C
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
17.63 miles
|
Vantage VA2 Campus
|
On 18.6 acres east of Route 28 in Sterling, Virginia, Vantage Data Centers is developing its VA2 campus.
|
|
17.64 miles
|
Vantage VA15
|
In July 2025, Vantage completed the topping out of the fifth building at its data center campus in Ashburn, Loudoun County, Virginia.
|
|
17.64 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
17.65 miles
|
West TowerInterested in this information?Contact us
|
|
|
17.65 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
17.65 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
17.70 miles
|
Vantage: VA22
|
This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
|
|
17.71 miles
|
Digital Realty: IAD43
|
|
|
17.72 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
17.72 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
17.72 miles
|
Deft: DRT-IAD1
|
|
|
17.72 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
17.75 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
17.77 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
17.83 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
17.83 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
17.84 miles
|
Vantage VA12
|
|
|
17.86 miles
|
PowerHouse: Pacific Bldg C
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
17.89 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019.
|
|
17.91 miles
|
Vantage VA14
|
|
|
17.91 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
17.92 miles
|
PowerHouse: Pacific Bldg B
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
17.92 miles
|
Vantage VA13
|
|
|
17.93 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
17.95 miles
|
Digital Realty: Broderick Drive
|
|
|
18.00 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
|
18.00 miles
|
PowerHouse Pacific
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
18.02 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
|
18.02 miles
|
44372 Round Table: Digital Realty
|
|
|
18.05 miles
|
44274 Round Table (Bldg L)
|
|
|
18.12 miles
|
CloudHQ: LC5
|
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
|
18.14 miles
|
44751 Round Table (Bldg P)
|
|
|
18.18 miles
|
Aligned IAD02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
|
18.21 miles
|
CloudHQ: LC1B
|
|
|
18.23 miles
|
CloudHQ Ashburn Campus
|
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
|
18.23 miles
|
Dulles 28 Technology Park
|
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
|
|
18.24 miles
|
Regency DC Campus Ashburn
|
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
|
|
18.25 miles
|
Quantum Connect: Ashburn, VA
|
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
|
18.30 miles
|
CloudHQ: LC3
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
18.32 miles
|
Equinix DC13
|
|
|
18.36 miles
|
CloudHQ LC2
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
18.39 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
|
18.39 miles
|
Aligned Ashburn
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
|
18.40 miles
|
Equinix DC21
|
|
|
18.41 miles
|
Sabey Intergate.Ashburn (Building A)
|
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
|
18.44 miles
|
Sabey: Intergate.Ashburn (Building B)
|
|
|
18.48 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
|
18.50 miles
|
DataCanopy: Ashburn 1
|
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
|
18.52 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
|
18.52 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
|
18.52 miles
|
Digital Realty: IAD-56
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
|
18.52 miles
|
DataBank Ashburn IAD4
|
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
|
18.53 miles
|
Equinix: DC22
|
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
|
18.53 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
|
18.53 miles
|
FastServ Ashburn
|
|
|
18.56 miles
|
NTT: VA7
|
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
|
18.57 miles
|
Cogent Vienna
|
|
|
18.58 miles
|
Equinix Ashburn DC11
|
|
|
18.58 miles
|
Equinix Ashburn DC6
|
|
|
18.58 miles
|
Lightedge: Ashburn
|
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
|
18.62 miles
|
Equinix Ashburn DC1
|
|
|
18.62 miles
|
Equinix Ashburn DC5
|
|
|
18.63 miles
|
Cologix: Ashburn ASH2
|
Cologix has acquired 38 acres in Ashburn’s "Data Center Alley" for a new AI-ready interconnection hub.
|
|
18.63 miles
|
NTT: VA6
|
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
|
18.66 miles
|
Equinix Ashburn DC4
|
|
|
18.66 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
|
18.67 miles
|
8100 Boone - Digital Realty
|
|
|
18.67 miles
|
East ValleyInterested in this information?Contact us
|
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
|
|
18.67 miles
|
NTT: VA9
|
|
|
18.67 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
|
18.67 miles
|
DataBank Ashburn IAD3
|
|
|
18.68 miles
|
Equinix Vienna DC7
|
|
|
18.69 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
|
18.71 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
|
18.71 miles
|
Element Critical VA1
|
|
|
18.74 miles
|
NTT VA5
|
|
|
18.74 miles
|
Dulles 28 Centre Motorplex
|
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
|
|
18.75 miles
|
Prime PlazaInterested in this information?Contact us
|
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
|
|
18.75 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
18.75 miles
|
East PointInterested in this information?Contact us
|
Amazon plans to build another data center in Loudoun County.
|
|
18.76 miles
|
Paragon Park Lot 3B
|
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
|
|
18.77 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
|
18.79 miles
|
21710 Charles View
|
|
|
18.79 miles
|
Point AlphaInterested in this information?Contact us
|
|
|
18.80 miles
|
NTT Ashburn Campus
|
|
|
18.85 miles
|
NTT: VA8
|
|
|
18.87 miles
|
Cologix: ASH1-N
|
This facility is part of Cologix ASH1 campus in Ashburn.
|
|
18.87 miles
|
NTT VA4
|
|
|
18.90 miles
|
Equinix Vienna DC8
|
|
|
18.90 miles
|
44521 Hastings (ACC5) Digital Realty
|
|
|
18.91 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
|
18.91 miles
|
PowerHouse ABX1
|
|
|
18.95 miles
|
Cyrusone: Beaumeade Circle
|
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
|
18.97 miles
|
Rackspace Ashburn IAD3
|
|
|
18.97 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
18.97 miles
|
Core PointInterested in this information?Contact us
|
|
|
18.97 miles
|
44490 Chilum (ACC2): Digital Realty
|
|
|
18.98 miles
|
21641 Charles View
|
|
|
19.03 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
|
19.03 miles
|
44470 Chillum - Digital Realty
|
|
|
19.04 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
|
19.06 miles
|
Center UltraInterested in this information?Contact us
|
|
|
19.07 miles
|
Lumen Ashburn
|
|
|
19.08 miles
|
Digital Realty: 21561 Beaumeade Cir
|
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
|
19.09 miles
|
Centersquare: Ashburn WDC1
|
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
|
19.12 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
|
19.12 miles
|
Edge PlazaInterested in this information?Contact us
|
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
|
|
19.13 miles
|
DataCanopy: Ashburn 2
|
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
|
19.15 miles
|
Equinix DC15
|
|
|
19.16 miles
|
PointOne: IAD2
|
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
|
19.19 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
|
19.22 miles
|
ParkInterested in this information?Contact us
|
|
|
19.25 miles
|
Equinix DC16
|
|
|
19.25 miles
|
Active Infra: Spring Valley Expansion
|
|
|
19.25 miles
|
Active Infra: Spring Valley Tech Park
|
Active Infrastructure plans to develop a 3.5 million-square-foot (325,161 sqm) data center campus on 362 acres in Leesburg, Loudoun County, Virginia.
|
|
19.26 miles
|
NTT VA2
|
|
|
19.27 miles
|
North HubInterested in this information?Contact us
|
|
|
19.29 miles
|
Equinix: DC17
|
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
|
19.32 miles
|
Equinix: DC18
|
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
|
19.39 miles
|
DataCanopy: Sterling, VA
|
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
|
|
19.40 miles
|
Cloud TowerInterested in this information?Contact us
|
|
|
19.41 miles
|
CyrusOne Northern Virginia Sterling V
|
|
|
19.41 miles
|
NorthInterested in this information?Contact us
|
|
|
19.43 miles
|
CloudInterested in this information?Contact us
|
|
|
19.43 miles
|
CyrusOne Sterling VIII
|
|
|
19.45 miles
|
DataBank McLean IAD2
|
In 2020, DataBank acquired the site from zColo.
|
|
19.46 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
19.47 miles
|
WestInterested in this information?Contact us
|
|
|
19.51 miles
|
Lumen McLean 1
|
|
|
19.52 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.52 miles
|
SouthInterested in this information?Contact us
|
|
|
19.53 miles
|
UltraInterested in this information?Contact us
|
|
|
19.53 miles
|
CampusInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
19.54 miles
|
COPT: 45761 Maries Rd
|
|
|
19.54 miles
|
Washington Commanders: Ashburn, VA
|
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
|
19.54 miles
|
PrimeInterested in this information?Contact us
|
|
|
19.55 miles
|
CyrusOne: NVA7
|
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
|
19.56 miles
|
COPT: 45771 Maries Rd
|
|
|
19.56 miles
|
Starwood: Alexandria, VA
|
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
|
|
19.57 miles
|
Centersquare: Sterling DC2
|
|
|
19.58 miles
|
Station OneInterested in this information?Contact us
|
|
|
19.59 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
19.66 miles
|
East CenterInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
19.67 miles
|
Kyndryl: Sterling
|
|
|
19.67 miles
|
Centersquare: Sterling DC4
|
|
|
19.67 miles
|
PointOne: Ashburn
|
The campus will have 2 buildings
|
|
19.68 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
|
19.70 miles
|
Tower PlusInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
19.71 miles
|
CyrusOne: Broadlands Expansion
|
|
|
19.73 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
|
19.74 miles
|
CyrusOne: Broadlands Boulevard
|
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
|
19.75 miles
|
PlusInterested in this information?Contact us
|
|
|
19.79 miles
|
OneInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
19.79 miles
|
StationInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
19.88 miles
|
CenterInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
19.99 miles
|
Point PrimeInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|