0.27 miles
|
Point GammaInterested in this information?Contact us
|
|
|
0.43 miles
|
Metro PlazaInterested in this information?Contact us
|
|
|
0.44 miles
|
JK Land: Greenlin Expansion
|
|
|
0.49 miles
|
Global PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
0.55 miles
|
JK Land: Greenlin Park 1
|
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
|
|
0.58 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.60 miles
|
South HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
0.65 miles
|
CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
0.68 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.73 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.78 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.96 miles
|
SouthInterested in this information?Contact us
|
|
|
1.02 miles
|
TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.02 miles
|
Prime HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.17 miles
|
Luck Stone: Ashburn Expansion
|
|
|
1.18 miles
|
Luck Stone: Ashburn 1
|
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
|
|
1.32 miles
|
Stack: NVA06B
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
1.33 miles
|
Tuscarora Crossing Campus
|
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
|
|
1.47 miles
|
Stack: NVA06A
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
1.58 miles
|
Compass Loudoun County
|
|
|
1.67 miles
|
SDC Capital: Twin Creeks
|
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
|
|
1.68 miles
|
Farkas Family: Leesburg, VA
|
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
|
|
2.13 miles
|
Private Equity Data CenterInterested in this information?Contact us
|
|
|
2.24 miles
|
Private Equity Data CenterInterested in this information?Contact us
|
|
|
2.33 miles
|
Private Equity Data CenterInterested in this information?Contact us
|
|
|
2.35 miles
|
Springfield East: Leesburg, VA
|
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
|
|
2.38 miles
|
Private Equity Data CenterInterested in this information?Contact us
|
|
|
2.46 miles
|
Private Equity Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
2.53 miles
|
Vantage: VA33
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.57 miles
|
CyrusOne: Broadlands Expansion
|
|
|
2.61 miles
|
Vantage: VA37
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.61 miles
|
CyrusOne: Broadlands Boulevard 1
|
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
|
2.61 miles
|
Vantage: VA32
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.64 miles
|
Vantage: VA31
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
|
2.69 miles
|
Vantage: VA36
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.71 miles
|
Central PointInterested in this information?Contact us
|
|
|
2.74 miles
|
Vantage: VA35
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.80 miles
|
Vantage: VA34
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.80 miles
|
JK Land: Freedom Trail Rd
|
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
|
|
2.95 miles
|
Peterson: Leesburg Gateway Campus
|
Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
|
|
3.76 miles
|
Active Infra: Spring Valley Expansion
|
|
|
3.88 miles
|
JK Land: Ashburn
|
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
|
|
4.39 miles
|
Active Infra: Spring Valley 1
|
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
|
|
4.51 miles
|
WestInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.89 miles
|
DataBank Ashburn IAD3
|
|
|
4.93 miles
|
DataBank Ashburn IAD4
|
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
|
4.94 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
|
4.99 miles
|
FastServ Ashburn
|
|
|
5.00 miles
|
DataBank Ashburn IAD1
|
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
|
|
5.01 miles
|
DataCanopy: Ashburn 1
|
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
|
5.06 miles
|
NTT: VA8
|
|
|
5.06 miles
|
Regency DC Campus Ashburn
|
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
|
|
5.10 miles
|
PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.12 miles
|
Sabey Intergate: Ashburn Bldg-B
|
|
|
5.14 miles
|
Sabey Intergate: Ashburn Bldg-C
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
|
5.18 miles
|
NTT VA4
|
|
|
5.19 miles
|
NTT: VA9
|
|
|
5.23 miles
|
NTT VA5
|
|
|
5.26 miles
|
Sabey Intergate: Ashburn Bldg-A
|
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
|
5.28 miles
|
NTT: VA6
|
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
|
5.38 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
5.40 miles
|
Equinix DC13
|
Equinix DC13 is a colocation data center on the former UUNET campus at 21830 UUNET Way in Ashburn, Virginia, built in 2000 and acquired from Verizon in 2017.
|
|
5.40 miles
|
NTT: VA7
|
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
|
5.41 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
|
5.41 miles
|
South RidgeInterested in this information?Contact us
|
|
|
5.42 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
5.46 miles
|
Deft: DRT-IAD1
|
|
|
5.46 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
5.46 miles
|
CloudHQ: LC5
|
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
|
5.47 miles
|
West CampusInterested in this information?Contact us
|
|
|
5.50 miles
|
Aligned: IAD-02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
|
5.51 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
5.52 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
5.52 miles
|
Aligned: IAD-01
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
|
5.55 miles
|
Rackspace Ashburn IAD3
|
|
|
5.55 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
5.55 miles
|
Global PointInterested in this information?Contact us
|
|
|
5.58 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
5.59 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
5.60 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
|
5.61 miles
|
44521 Hastings (ACC5) Digital Realty
|
|
|
5.61 miles
|
East RidgeInterested in this information?Contact us
|
|
|
5.61 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
5.62 miles
|
Quantum Connect: Ashburn, VA
|
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
|
5.62 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
5.64 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
5.64 miles
|
44470 Chillum - Digital Realty
|
|
|
5.64 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
|
5.70 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
|
5.70 miles
|
NTT VA2
|
|
|
5.71 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
5.73 miles
|
44490 Chilum (ACC2): Digital Realty
|
|
|
5.73 miles
|
EastInterested in this information?Contact us
|
|
|
5.74 miles
|
Tower OneInterested in this information?Contact us
|
|
|
5.74 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
|
5.77 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
|
5.78 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
5.79 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
5.79 miles
|
Lumen Ashburn
|
|
|
5.80 miles
|
Equinix Ashburn DC4
|
Equinix DC4 is a single-story colocation data center at 21691 Filigree Court on Equinix's Ashburn, Virginia campus that opened in Q1 2007.
|
|
5.80 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
|
5.82 miles
|
Campus GammaInterested in this information?Contact us
|
|
|
5.84 miles
|
West RidgeInterested in this information?Contact us
|
|
|
5.84 miles
|
Cologix: ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
|
5.85 miles
|
Equinix Ashburn DC5
|
Equinix DC5 is a single-story colocation data center at 21701 Filigree Court on Equinix's Ashburn, Virginia campus that opened in Q2 2008.
|
|
5.86 miles
|
44372 Round Table: Digital Realty
|
|
|
5.87 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
5.88 miles
|
Cologix: ASH2
|
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
|
|
5.90 miles
|
Equinix: DC17
|
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
|
5.90 miles
|
DataCanopy: Ashburn 2
|
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
|
5.90 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
|
5.91 miles
|
Equinix: DC18
|
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
|
5.91 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
5.91 miles
|
44274 Round Table (Bldg L)
|
Digital Realty's largest building: a two-level, 1,057,000 sq ft air-cooled high-density data center at 44274 Round Table Plaza in Ashburn, Virginia.
|
|
5.92 miles
|
Equinix Ashburn DC1
|
Equinix DC1 at 21711 Filigree Court in Ashburn, Virginia, opened in July 1999 as Equinix's first data center and anchors its Ashburn campus.
|
|
5.92 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
|
5.92 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
5.96 miles
|
Lightedge: Ashburn
|
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
|
5.96 miles
|
CloudHQ LC2
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
5.97 miles
|
Equinix DC16
|
Equinix DC16 is a four-story colocation data center at 44740 Performance Circle in Ashburn, Virginia, that opened in Q4 2023 and added two more phases in 2025.
|
|
5.97 miles
|
CloudHQ: LC1A
|
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
|
5.99 miles
|
HubInterested in this information?Contact us
|
|
|
6.00 miles
|
Centersquare: Ashburn WDC1
|
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
|
6.01 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
6.01 miles
|
Equinix Ashburn DC6
|
Equinix DC6 is a two-story colocation data center at 21721 Filigree Court on Equinix's Ashburn, Virginia campus that opened in July 2010.
|
|
6.01 miles
|
Equinix Ashburn DC11
|
Equinix DC11 is a two-story colocation data center at 21721 Filigree Court, the final building on Equinix's Ashburn, Virginia campus, opened in January 2013.
|
|
6.03 miles
|
Digital Realty: 21561 Beaumeade Cir
|
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
|
6.04 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
6.05 miles
|
South ParkInterested in this information?Contact us
|
|
|
6.07 miles
|
CloudHQ: LC1B
|
|
|
6.08 miles
|
CloudHQ: LC3
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
6.10 miles
|
Cologix: Ashburn Expansion (Beaumeade Circle)
|
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
|
|
6.11 miles
|
QTS Ashburn-Shellhorn DC1
|
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
|
|
6.12 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
|
6.13 miles
|
QTS Ashburn-Shellhorn DC2
|
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
|
|
6.13 miles
|
Equinix DC15
|
Equinix DC15 is a two-story colocation data center at 44780 Performance Circle in Ashburn, Virginia, that opened in Q2 2020 and doubled with a second phase in Q4 2021.
|
|
6.13 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
|
6.14 miles
|
Digital Realty: IAD-56
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
|
6.20 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
6.21 miles
|
PowerHouse ABX1
|
|
|
6.21 miles
|
Cyrusone: Beaumeade Circle
|
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
|
6.22 miles
|
Ridge MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.23 miles
|
StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.25 miles
|
SDC: Import Plaza A
|
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
|
|
6.25 miles
|
44751 Round Table (Bldg P)
|
|
|
6.25 miles
|
Edge HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.26 miles
|
Equinix: DC22
|
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
|
6.27 miles
|
Washington Commanders: Ashburn, VA
|
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
|
6.32 miles
|
Equinix DC21
|
Equinix DC21 is a two-story colocation data center at 22175 Beaumeade Circle in Ashburn, Virginia, that opened in Q4 2020 and grew in phases through Q3 2023.
|
|
6.36 miles
|
SDC: Import Plaza B
|
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
|
|
6.36 miles
|
Campus OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.37 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
|
6.41 miles
|
Tower ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.41 miles
|
SDC: Import Plaza C
|
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
|
|
6.43 miles
|
SDC: Import Plaza D
|
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
|
|
6.43 miles
|
Hub ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.48 miles
|
Valley OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.48 miles
|
Stack: NVA04C
|
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
|
|
6.48 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
6.49 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
6.54 miles
|
CoreInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.54 miles
|
Stack: NVA04B
|
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
|
|
6.55 miles
|
Corscale: Kincora
|
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
|
|
6.60 miles
|
Stack: NVA04A
|
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
|
|
6.60 miles
|
Metro StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.61 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
6.63 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
6.72 miles
|
Dulles 28 Centre Motorplex
|
This site is no longer planned as a data center. A new Dominion Energy utility substation (Auto World Substation) is now proposed here instead.
|
|
6.75 miles
|
SDC: Low Latency Lane 2
|
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
6.76 miles
|
21641 Charles View
|
|
|
6.78 miles
|
Digital Realty: Broderick Drive
|
|
|
6.79 miles
|
SDC: Low Latency Lane 1
|
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
6.79 miles
|
East RidgeInterested in this information?Contact us
|
|
|
6.80 miles
|
CyrusOne: NVA7
|
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
|
6.81 miles
|
DataCanopy: Sterling, VA
|
Data Canopy colocation space in Sterling, Virginia, with private and multi-tenant cages.
|
|
6.81 miles
|
Digital Realty: IAD43
|
|
|
6.83 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
|
|
6.84 miles
|
21710 Charles View
|
|
|
6.84 miles
|
Prime HubInterested in this information?Contact us
|
|
|
6.85 miles
|
CyrusOne: NVA5
|
|
|
6.86 miles
|
SDC: Low Latency Lane Expansion
|
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
|
|
6.88 miles
|
Ridge AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.90 miles
|
Hub ThreeInterested in this information?Contact us
|
|
|
6.90 miles
|
MetroInterested in this information?Contact us
|
|
|
6.91 miles
|
PowerHouse: Pacific Bldg C
|
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
6.93 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.94 miles
|
QTS: ASH2 DC2
|
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
|
|
6.94 miles
|
Point GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.94 miles
|
PowerHouse: Pacific Bldg A
|
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
|
|
6.95 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
|
|
6.95 miles
|
Core StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.97 miles
|
PowerHouse: Pacific Bldg B
|
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
6.98 miles
|
PlazaInterested in this information?Contact us
|
|
|
6.98 miles
|
QTS: ASH2 DC1
|
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
|
|
7.02 miles
|
WestInterested in this information?Contact us
|
|
|
7.03 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
7.06 miles
|
Station GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.06 miles
|
Paragon Park Lot 3B
|
This site is no longer advancing as a data center. It is the location of Dominion Energy’s proposed Golden Substation, a 500/230 kV utility substation planned on roughly 16 acres.
|
|
7.14 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
|
7.22 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
7.26 miles
|
Valley MaxInterested in this information?Contact us
|
|
|
7.26 miles
|
PointOne: IAD2
|
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
|
7.26 miles
|
Stack: Loudoun 1
|
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
7.29 miles
|
Vantage VA13
|
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
|
|
7.29 miles
|
PointOne: Ashburn
|
The campus will have 2 buildings
|
|
7.30 miles
|
Stack: Loudoun 2
|
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
7.32 miles
|
TA Realty: Sterling, Virginia
|
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
|
|
7.33 miles
|
Vantage VA14
|
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
|
|
7.34 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
7.37 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
7.37 miles
|
Vantage VA15
|
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
|
|
7.40 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.41 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
7.41 miles
|
Vantage VA12
|
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
|
|
7.43 miles
|
Vantage VA16
|
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
|
|
7.43 miles
|
Vantage VA11
|
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
|
|
7.43 miles
|
West StationInterested in this information?Contact us
|
|
|
7.45 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
7.47 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
|
|
7.48 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
|
|
7.48 miles
|
Tower OneInterested in this information?Contact us
|
|
|
7.50 miles
|
ProInterested in this information?Contact us
|
|
|
7.53 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
7.53 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
7.53 miles
|
COPT: 45771 Maries Rd
|
|
|
7.53 miles
|
GammaInterested in this information?Contact us
|
|
|
7.55 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
|
|
7.59 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
7.60 miles
|
PrimeInterested in this information?Contact us
|
|
|
7.61 miles
|
COPT: 45761 Maries Rd
|
|
|
7.62 miles
|
Hub PlusInterested in this information?Contact us
|
|
|
7.64 miles
|
CyrusOne: NVA9 Bldg-1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
7.72 miles
|
CyrusOne: NVA9 Bldg-2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
7.72 miles
|
CyrusOne: NVA9 Bldg-1A
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
7.72 miles
|
Core HubInterested in this information?Contact us
|
|
|
7.72 miles
|
EastInterested in this information?Contact us
|
|
|
7.74 miles
|
Digital Realty: IAD45
|
This facility is part of the Digital Dulles Campus in Sterling, VA.
|
|
7.74 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
7.74 miles
|
Center MaxInterested in this information?Contact us
|
|
|
7.75 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.77 miles
|
Core HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.79 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
|
7.80 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
7.80 miles
|
PlusInterested in this information?Contact us
|
|
|
7.80 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
7.84 miles
|
Prime TowerInterested in this information?Contact us
|
|
|
7.86 miles
|
Tower UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.86 miles
|
EdgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.88 miles
|
Prime RidgeInterested in this information?Contact us
|
|
|
7.88 miles
|
Core TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.89 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
7.89 miles
|
Yondr: Arcola Bldg 1
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
7.89 miles
|
Campus OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.90 miles
|
Vantage: VA22
|
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
7.91 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
7.91 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
7.92 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
|
7.92 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
7.92 miles
|
Centersquare: Sterling DC2
|
|
|
7.93 miles
|
TowerInterested in this information?Contact us
|
|
|
7.93 miles
|
Edge StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.94 miles
|
Central ValleyInterested in this information?Contact us
|
|
|
7.94 miles
|
Vantage: VA21
|
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
|
|
7.94 miles
|
EdgeInterested in this information?Contact us
|
|
|
7.95 miles
|
Centersquare: Sterling DC4
|
|
|
7.96 miles
|
Yondr: Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
7.97 miles
|
CyrusOne Sterling VIII
|
|
|
7.97 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
7.98 miles
|
Plaza UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.99 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
8.00 miles
|
Vantage: VA23
|
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
8.00 miles
|
Central RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.02 miles
|
Core CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.02 miles
|
North TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.04 miles
|
TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.05 miles
|
East TowerInterested in this information?Contact us
|
|
|
8.06 miles
|
Station BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.06 miles
|
PrimeInterested in this information?Contact us
|
|
|
8.06 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
8.09 miles
|
Point PrimeInterested in this information?Contact us
|
|
|
8.10 miles
|
Valley AlphaInterested in this information?Contact us
|
|
|
8.10 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
8.11 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
8.12 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
8.15 miles
|
Ridge UltraInterested in this information?Contact us
|
|
|
8.15 miles
|
Plaza UltraInterested in this information?Contact us
|
|
|
8.17 miles
|
Point GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.18 miles
|
OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.20 miles
|
TowerInterested in this information?Contact us
|
|
|
8.31 miles
|
Valley GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.33 miles
|
PowerHouse: Arcola Bldg B
|
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
8.34 miles
|
CentralInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.36 miles
|
PowerHouse: Arcola Bldg A
|
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
8.47 miles
|
West PointInterested in this information?Contact us
|
|
|
8.51 miles
|
Hub GammaInterested in this information?Contact us
|
|
|
8.56 miles
|
Point PrimeInterested in this information?Contact us
|
|
|
8.61 miles
|
Kyndryl: Sterling
|
|
|
8.68 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
8.73 miles
|
Connect Data Centers: Sterling, VA
|
|
|
8.75 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
8.76 miles
|
Centersquare: IAD2-B
|
|
|
8.78 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
8.82 miles
|
Hub GammaInterested in this information?Contact us
|
|
|
8.90 miles
|
Center ThreeInterested in this information?Contact us
|
|
|
9.04 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
9.06 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
9.12 miles
|
PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.15 miles
|
BetaInterested in this information?Contact us
|
|
|
9.15 miles
|
Park MaxInterested in this information?Contact us
|
|
|
9.17 miles
|
Edge PointInterested in this information?Contact us
|
|
|
9.17 miles
|
ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.24 miles
|
Prime PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.25 miles
|
GammaInterested in this information?Contact us
|
|
|
10.38 miles
|
South RidgeInterested in this information?Contact us
|
|
|
10.46 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
10.46 miles
|
StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.51 miles
|
Ridge PlusInterested in this information?Contact us
|
|
|
10.54 miles
|
UltraInterested in this information?Contact us
|
|
|
10.55 miles
|
MetroInterested in this information?Contact us
|
|
|
10.59 miles
|
Valley ThreeInterested in this information?Contact us
|
|
|
10.60 miles
|
Valley TwoInterested in this information?Contact us
|
|
|
10.73 miles
|
South CampusInterested in this information?Contact us
|
|
|
10.73 miles
|
Core PointInterested in this information?Contact us
|
|
|
10.75 miles
|
West ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.78 miles
|
GlobalInterested in this information?Contact us
|
|
|
10.88 miles
|
NorthInterested in this information?Contact us
|
|
|
10.91 miles
|
Central RidgeInterested in this information?Contact us
|
|
|
11.02 miles
|
West RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.03 miles
|
UltraInterested in this information?Contact us
|
|
|
11.13 miles
|
Tower PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.14 miles
|
Hub ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.16 miles
|
EastInterested in this information?Contact us
|
|
|
11.22 miles
|
CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.25 miles
|
Prime TowerInterested in this information?Contact us
|
|
|
11.34 miles
|
Lumen Herndon 1
|
|
|
11.36 miles
|
Lumen Herndon 3
|
|
|
11.36 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
11.45 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
11.54 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
11.59 miles
|
Atmosphere: Dickerson, Maryland
|
|
|
11.66 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
11.68 miles
|
H5: Herndon
|
|
|
11.70 miles
|
Equinix Herndon DC97
|
Equinix DC97 is a leased colocation data center at 460 Springpark Place in Herndon, Virginia. Terremark opened it in 2005 as a regional exchange; Verizon acquired Terremark in 2011 and sold the site to Equinix in 2017.
|
|
11.73 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
11.74 miles
|
Starwood: Stonecroft Blvd, Chantilly
|
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
|
|
11.77 miles
|
GlobalInterested in this information?Contact us
|
|
|
11.84 miles
|
PrimeInterested in this information?Contact us
|
|
|
11.84 miles
|
Campus MaxInterested in this information?Contact us
|
|
|
11.91 miles
|
Station AlphaInterested in this information?Contact us
|
|
|
11.94 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
11.96 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.98 miles
|
TAC: Northern Virginia
|
TAC Data Centers' planned two-phase hyperscale campus on a 125-acre site in Northern Virginia, developed as a joint venture with an unnamed partner. TAC has not disclosed the county or parcel.
|
|
11.99 miles
|
Tower OneInterested in this information?Contact us
|
|
|
12.15 miles
|
PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.23 miles
|
Central PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.50 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
12.50 miles
|
East PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.57 miles
|
MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.60 miles
|
Dulles South Innovation Center
|
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
|
|
12.60 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.69 miles
|
CoreSite: VA2
|
|
|
12.71 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
12.71 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
13.95 miles
|
Parkstone Tech Park
|
|
|
14.15 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
14.32 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
14.43 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
14.97 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
16.23 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
17.91 miles
|
Cloud CampusInterested in this information?Contact us
|
|
|
17.95 miles
|
Plaza ThreeInterested in this information?Contact us
|
|
|
17.97 miles
|
ParkInterested in this information?Contact us
|
|
|
18.01 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
18.03 miles
|
CampusInterested in this information?Contact us
|
|
|
18.14 miles
|
Corscale: Gainesville 1
|
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
|
18.14 miles
|
Equinix Manassas DC14
|
Equinix DC14 is a two-story colocation data center at 7400 Infantry Ridge Road in Manassas, Virginia, built in 2004 and acquired from Verizon, where it was IAD4, in 2017.
|
|
18.14 miles
|
CorScale: Gainesville 5
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
18.20 miles
|
Rowan: Frederick 1A
|
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland.
|
|
18.21 miles
|
PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.22 miles
|
CorScale: Gainesville 4
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
18.30 miles
|
John Marshall Commons Tech Park
|
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
|
18.31 miles
|
CorScale: Gainesville 2
|
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
|
18.32 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.33 miles
|
GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.33 miles
|
Hub GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.33 miles
|
Rowan: Frederick 1C
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
|
18.35 miles
|
Rowan: Frederick 2D
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
|
18.35 miles
|
Rowan: Frederick 2C
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
|
18.35 miles
|
CorScale: Gainesville 3
|
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
|
18.38 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
18.38 miles
|
Campus PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.39 miles
|
Tower OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.39 miles
|
NTT: VA13
|
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
18.40 miles
|
Rowan: Frederick 1B
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
|
18.42 miles
|
ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.44 miles
|
NTT: VA12
|
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
18.48 miles
|
NTT: VA11
|
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
18.48 miles
|
Tower ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.49 miles
|
Rowan: Frederick 2B
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
|
18.51 miles
|
NTT: VA10
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
18.52 miles
|
ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.54 miles
|
UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.55 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.57 miles
|
Rowan: Frederick 2A
|
Bauxite II will span 822,620 sq ft (76,400 sqm) on a 111.5-acre site, comprising four data center buildings.
|
|
18.57 miles
|
Rowan: Frederick 1D
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
|
18.61 miles
|
Valley UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.71 miles
|
Edge StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.74 miles
|
Edge TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.77 miles
|
AlphaInterested in this information?Contact us
|
|
|
18.77 miles
|
Gardner Property Project
|
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
|
18.80 miles
|
HubInterested in this information?Contact us
|
|
|
18.81 miles
|
EdgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.82 miles
|
TowerInterested in this information?Contact us
|
|
|
18.83 miles
|
West ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.85 miles
|
Ridge ThreeInterested in this information?Contact us
|
|
|
18.85 miles
|
Park TwoInterested in this information?Contact us
|
|
|
18.88 miles
|
Rowan: Frederick 3C
|
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
|
|
18.89 miles
|
OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.90 miles
|
Park BetaInterested in this information?Contact us
|
|
|
18.91 miles
|
SouthInterested in this information?Contact us
|
|
|
18.93 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
18.94 miles
|
Campus BetaInterested in this information?Contact us
|
|
|
18.96 miles
|
Rowan: Frederick 3A
|
Bauxite III will span 591,913 sq ft (54,990 sqm) across a 55-acre site, comprising three data center buildings.
|
|
19.01 miles
|
North StationInterested in this information?Contact us
|
|
|
19.03 miles
|
Rowan: Frederick 3B
|
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
|
|
19.05 miles
|
Point BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.09 miles
|
Hub ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.09 miles
|
Equinix Vienna DC8
|
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC8 in Q4 2020.
|
|
19.12 miles
|
Aligned: IAD04 Bldg1
|
The company withdrew in 2023 when Maryland restricted diesel generator usage. However, following regulatory changes, Aligned recommitted to the project in 2024.
|
|
19.19 miles
|
EastInterested in this information?Contact us
|
|
|
19.21 miles
|
Aligned: IAD06
|
Aligned is developing IAD-06 as part of its Frederick campus within Quantum Frederick Park, expanding hyperscale data center infrastructure on a former industrial redevelopment site in Maryland.
|
|
19.21 miles
|
Aligned: IAD04 Bldg2
|
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
|
19.27 miles
|
Aligned: IAD04 Bldg3
|
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
|
19.30 miles
|
Iron Mountain: Manassas Point
|
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
|
19.31 miles
|
Campus OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.36 miles
|
TPG Real Estate: Frederick Campus
|
The Quantum Frederick Project, a 2,100-acre data center campus and fiber optic loop (QLoop) in Frederick County, Maryland, was first announced by TPG Real Estate and Quantum Loophole in 2021.
|
|
19.38 miles
|
Aligned: IAD04 Bldg4
|
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
|
19.42 miles
|
BlackChamber: Gainesville, VA
|
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
|
|
19.60 miles
|
CoreInterested in this information?Contact us
|
|
|
19.64 miles
|
TowerInterested in this information?Contact us
|
|
|
19.64 miles
|
Global PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.67 miles
|
CoreInterested in this information?Contact us
|
|
|
19.68 miles
|
Core ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.72 miles
|
PrimeInterested in this information?Contact us
|
|
|
19.75 miles
|
Valley TwoInterested in this information?Contact us
|
|
|
19.75 miles
|
Iron Mountain VA-1
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
|
19.79 miles
|
North PlazaInterested in this information?Contact us
|
|
|
19.82 miles
|
Iron Mountain VA-2
|
|
|
19.91 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
|
19.95 miles
|
Yondr: Bristow Bldg1
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
|
19.95 miles
|
Iron Mountain: VA-7
|
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
|
|
19.98 miles
|
NorthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.99 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.99 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|