Cyrusone: Beaumeade Circle

Latest Podcast 21529 Beaumeade Cir
Operational
Fully operational facility
Operated by:

Cyrusone: Beaumeade Circle

Year Built: 2023
Ownership: CyrusOne owns the building.
Lot Size: 10 acres

Sites leasing space from CyrusOne:

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.

Harrison Street and AREP acquired the site for $21.5 million in January 2021. The land, formerly home to a retail strip mall-type facility, was previously owned by Chirisa Investments, which bought the site in 2018 and had planned to build a 280,000 sq ft (26,000 sqm), 30MW data center.

Map and Nearby Locations

21529 Beaumeade Cir
CyrusOne Sites
Nearby Facilities

Cyrusone: Beaumeade Circle Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cyrusone: Beaumeade Circle

Distance Site About
0.04 miles PowerHouse ABX1
0.10 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
0.19 miles Digital Realty: 21561 Beaumeade Cir
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
0.20 miles Equinix DC15
0.21 miles Ridge PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.22 miles Centersquare: Ashburn WDC1
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
0.25 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
0.30 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.32 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
0.32 miles DataCanopy: Ashburn 2
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
0.33 miles Equinix DC16
0.40 miles Equinix: DC17
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
0.40 miles Cologix: ASH2
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
0.41 miles Equinix: DC18
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
0.42 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
0.42 miles Cologix: Ashburn Expansion (Beaumeade Circle)
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
0.42 miles Lumen Ashburn
0.44 miles Equinix: DC22
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
0.46 miles Central RidgeInterested in this information?Contact us
0.48 miles Valley MaxInterested in this information?Contact us
0.51 miles Digital Realty: IAD-56
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
0.51 miles Dulles 28 Centre Motorplex
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
0.51 miles 44520 Hastings (ACC3) Digital Realty
0.51 miles 44490 Chilum (ACC2): Digital Realty
0.52 miles Cologix: ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
0.52 miles Valley MaxInterested in this information?Contact us
0.52 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
0.53 miles NTT VA2
0.54 miles Equinix Ashburn DC6
0.54 miles Equinix Ashburn DC11
0.57 miles Equinix DC21
0.57 miles Equinix Ashburn DC1
0.58 miles Lightedge: Ashburn
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
0.59 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
0.59 miles 21641 Charles View
0.60 miles 44470 Chillum - Digital Realty
0.62 miles Edge HubInterested in this information?Contact us
0.63 miles 21710 Charles View
0.63 miles Park UltraInterested in this information?Contact us
0.64 miles Equinix Ashburn DC5
0.64 miles Washington Commanders: Ashburn, VA
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
0.66 miles Equinix Ashburn DC4
0.67 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
0.69 miles 44521 Hastings (ACC5) Digital Realty
0.69 miles Plaza MaxInterested in this information?Contact us
0.71 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
0.71 miles Rackspace Ashburn IAD3
0.76 miles Point PlusInterested in this information?Contact us
0.80 miles CloudHQ: LC3
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
0.81 miles CloudHQ LC2
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
0.83 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
0.84 miles Tower GammaInterested in this information?Contact us
0.84 miles Cloud CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.85 miles Valley OneInterested in this information?Contact us
0.86 miles Paragon Park Lot 3B
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
0.86 miles Dulles 28 Technology Park
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
0.88 miles DataCanopy: Sterling, VA
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
0.89 miles 44751 Round Table (Bldg P)
0.89 miles Ridge MaxInterested in this information?Contact us
0.91 miles CloudHQ: LC1B
0.93 miles 21744 Sir Timothy Drive (ACC10)
0.93 miles 21745 Sir Timothy (ACC9) Digital Realty
0.93 miles CyrusOne: NVA5
0.95 miles CloudHQ: LC1A
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
0.95 miles Core PointInterested in this information?Contact us
0.99 miles CyrusOne: NVA7
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
1.01 miles Digital Realty: Broderick Drive
1.02 miles PowerHouse: Pacific Bldg A
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
1.06 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
1.10 miles South RidgeInterested in this information?Contact us
1.11 miles PowerHouse: Pacific Bldg B
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
1.11 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
1.12 miles PowerHouse: Pacific Bldg C
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
1.18 miles PointOne: IAD2
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
1.18 miles NTT: VA7
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
1.18 miles ProInterested in this information?Contact us
1.19 miles NTT VA4
1.21 miles Aligned: IAD-01
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
1.22 miles 44274 Round Table (Bldg L)
1.22 miles NTT VA5
1.24 miles Digital Realty: IAD43
1.25 miles NTT: VA6
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
1.26 miles Quantum Connect: Ashburn, VA
A data center is under construction at the Quantum business park in Ashburn, Virginia.
1.26 miles Vantage VA13
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
1.30 miles Vantage VA14
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
1.30 miles 44372 Round Table: Digital Realty
1.32 miles NTT: VA9
1.33 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
1.35 miles NTT: VA8
1.36 miles Stack: NVA04C
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
1.36 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.37 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.37 miles Vantage VA11
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
1.37 miles Edge CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.39 miles Vantage VA12
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
1.39 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.40 miles Menlo: MD-DC2 (Sterling)
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
1.41 miles Prime PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.42 miles Equinix DC13
1.43 miles Sentinel: Cloud Plaza, Sterling, VA
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
1.44 miles EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.44 miles Stack: NVA04B
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
1.47 miles Aligned: IAD-02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
1.48 miles Vantage VA15
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
1.49 miles PointOne: Ashburn
The campus will have 2 buildings
1.49 miles Sabey Intergate: Ashburn Bldg-A
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
1.50 miles TA Realty: Sterling, Virginia
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
1.52 miles Stack: NVA04A
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
1.52 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.52 miles CloudHQ: LC9
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
1.52 miles Sabey Intergate: Ashburn Bldg-C
Intergate.Ashburn is a purpose-built data center campus on 38 acres
1.53 miles Vantage VA16
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
1.56 miles CloudHQ: LC8
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
1.56 miles Corscale: Kincora
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
1.58 miles CloudHQ: LC5
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
1.62 miles CloudHQ: LC10
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
1.63 miles Sabey Intergate: Ashburn Bldg-B
1.64 miles Plaza UltraInterested in this information?Contact us
1.64 miles COPT: 45771 Maries Rd
1.68 miles QTS: ASH2 DC1
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
1.69 miles CloudHQ: LC4
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
1.69 miles DataBank Ashburn IAD3
1.69 miles FastServ Ashburn
1.70 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
1.70 miles DataBank Ashburn IAD1
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
1.70 miles TwoInterested in this information?Contact us
1.71 miles DataCanopy: Ashburn 1
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
1.71 miles CloudHQ: LC14
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
1.71 miles COPT: 45761 Maries Rd
1.71 miles SDC: Low Latency Lane 1
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
1.72 miles QTS: ASH2 DC2
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
1.75 miles CloudHQ: LC11
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
1.76 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
1.76 miles CloudHQ: LC13
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
1.77 miles Ridge UltraInterested in this information?Contact us
1.77 miles North PointInterested in this information?Contact us
1.78 miles DataBank Ashburn IAD4
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
1.79 miles SDC: Low Latency Lane Expansion
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
1.81 miles SDC: Low Latency Lane 2
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
1.81 miles Vantage: VA22
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
1.82 miles Hyperscale Data CenterInterested in this information?Contact us
1.83 miles CloudHQ: LC12
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
1.87 miles Vantage: VA21
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
1.89 miles Center PlusInterested in this information?Contact us
1.91 miles Centersquare: Sterling DC3
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
1.92 miles QTS Ashburn-Shellhorn DC2
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
1.92 miles Vantage: VA23
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
1.93 miles Regency DC Campus Ashburn
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
1.93 miles Prime CenterInterested in this information?Contact us
1.93 miles 44100 Digital Loudoun Plaza (Bldg J)
1.95 miles EdgeCore Ashburn
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
1.97 miles CyrusOne Northern Virginia Sterling I, II, III
1.98 miles North PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.98 miles SDC: Import Plaza D
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
1.98 miles Point AlphaInterested in this information?Contact us
1.99 miles SDC: Import Plaza B
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
1.99 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.99 miles Prime ValleyInterested in this information?Contact us
1.99 miles CyrusOne Sterling VIII
1.99 miles 43780 Digital Loudoun Plaza (Bldg H)
2.01 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.01 miles Park PrimeInterested in this information?Contact us
2.01 miles 44060 Digital Loudoun Plaza (Bldg K)
2.01 miles Centersquare: Sterling DC2
2.02 miles Metro TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.02 miles SDC: Import Plaza C
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
2.02 miles Global HubInterested in this information?Contact us
2.02 miles QTS Ashburn-Shellhorn DC1
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
2.03 miles Campus AlphaInterested in this information?Contact us
2.06 miles 43915 Devin Shafron (Bldg A)
2.06 miles SDC: Import Plaza A
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
2.06 miles Digital Realty: IAD55
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
2.06 miles 21110 Ridgetop
The site is fully leased to triple net tenants.
2.08 miles Tower ProInterested in this information?Contact us
2.09 miles Center UltraInterested in this information?Contact us
2.09 miles 43940 Digital Loudoun Plaza (Bldg G)
2.09 miles Centersquare: Sterling DC4
2.10 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
2.10 miles Prologis: Executive Drive
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
2.11 miles Deft: DRT-IAD1
2.11 miles 43830 Devin Shafron (Bldg F)
2.12 miles GammaInterested in this information?Contact us
2.13 miles Metro PlazaInterested in this information?Contact us
2.14 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
2.14 miles 43790 Devin Shafron (Bldg E)
2.15 miles 43881 Devin Shafron (Bldg B)
2.17 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.21 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
2.22 miles 43831 Devin Shafron (Bldg C)
2.23 miles Metro CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.23 miles Ridge ProInterested in this information?Contact us
2.25 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.26 miles Park BetaInterested in this information?Contact us
2.27 miles 43791 Devin Shafron (Bldg D)
2.28 miles Prime CenterInterested in this information?Contact us
2.32 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.35 miles Cloud PointInterested in this information?Contact us
2.41 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
2.42 miles SouthInterested in this information?Contact us
2.43 miles Prologis: Global Plaza Rd
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
2.60 miles Connect Data Centers: Sterling, VA
2.69 miles Csquare: Dulles IAD3
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
2.71 miles Kyndryl: Sterling
2.76 miles CyrusOne Northern Virginia Sterling IV
2.83 miles Centersquare: IAD2-B
2.84 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
2.90 miles EdgeInterested in this information?Contact us
2.92 miles Campus UltraInterested in this information?Contact us
2.99 miles Ridge MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.99 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
3.04 miles Prime CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.05 miles Core ValleyInterested in this information?Contact us
3.12 miles Campus OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.14 miles Station OneInterested in this information?Contact us
3.18 miles Prime ParkInterested in this information?Contact us
3.23 miles PlazaInterested in this information?Contact us
3.29 miles MaxInterested in this information?Contact us
3.32 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
3.56 miles Hyperscale Data CenterInterested in this information?Contact us
3.58 miles JK Land: Ashburn
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
3.61 miles Hyperscale Data CenterInterested in this information?Contact us
3.62 miles Hyperscale Data CenterInterested in this information?Contact us
3.67 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.68 miles Hyperscale Data CenterInterested in this information?Contact us
3.99 miles CyrusOne: Broadlands Boulevard 1
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
4.10 miles CyrusOne: Broadlands Expansion
4.49 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
4.60 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
4.61 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
4.75 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
4.75 miles JK Land: Freedom Trail Rd
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
4.90 miles Belmont Innovation Campus
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
4.96 miles Compass Loudoun County
4.97 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.98 miles Vantage: VA32
This facility is a part of Vantage's VA3 data center campus in Ashburn.
5.03 miles East ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.04 miles Luck Stone: Ashburn 1
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
5.05 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
5.05 miles Vantage: VA35
This facility is a part of Vantage's VA3 data center campus in Ashburn.
5.05 miles Luck Stone: Ashburn Expansion
5.07 miles Vantage: VA34
This facility is a part of Vantage's VA3 data center campus in Ashburn.
5.07 miles Campus GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.11 miles Vantage: VA33
This facility is a part of Vantage's VA3 data center campus in Ashburn.
5.13 miles Vantage: VA31
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
5.15 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
5.19 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
5.23 miles Lumen Herndon 1
5.25 miles Lumen Herndon 3
5.26 miles Vantage: VA37
This facility is a part of Vantage's VA3 data center campus in Ashburn.
5.27 miles Vantage: VA36
This facility is a part of Vantage's VA3 data center campus in Ashburn.
5.35 miles SDC Capital: Twin Creeks
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
5.39 miles Prime ParkInterested in this information?Contact us
5.45 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
5.54 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
5.57 miles H5: Herndon
5.58 miles Hyperscale Data CenterInterested in this information?Contact us
5.60 miles Equinix Herndon DC97
5.64 miles Hyperscale Data CenterInterested in this information?Contact us
5.66 miles Hyperscale Data CenterInterested in this information?Contact us
5.70 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
5.77 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
5.78 miles Hyperscale Data CenterInterested in this information?Contact us
5.80 miles Cloud CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.81 miles Prime ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.93 miles Ridge ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.95 miles Springfield East: Leesburg, VA
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
5.95 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
5.95 miles Farkas Family: Leesburg, VA
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
5.98 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.00 miles JK Land: Greenlin Park 1
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
6.01 miles Tuscarora Crossing Campus
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
6.01 miles Park AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.02 miles Cloud CampusInterested in this information?Contact us
6.09 miles Global RidgeInterested in this information?Contact us
6.10 miles South TowerInterested in this information?Contact us
6.12 miles Cloud PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.13 miles JK Land: Greenlin Expansion
6.20 miles North CampusInterested in this information?Contact us
6.21 miles SouthInterested in this information?Contact us
6.21 miles JK Land: Cross Mill Center
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
6.31 miles Prime HubInterested in this information?Contact us
6.43 miles Active Infra: Spring Valley 1
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
6.47 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
6.48 miles Hub GammaInterested in this information?Contact us
6.53 miles Active Infra: Spring Valley Expansion
6.55 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
6.60 miles CoreSite: VA2
6.62 miles Edge ValleyInterested in this information?Contact us
6.63 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
6.63 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
6.64 miles Park AlphaInterested in this information?Contact us
6.74 miles JK Land: Tech Park 1 Expansion
6.78 miles Point ProInterested in this information?Contact us
6.79 miles Valley ThreeInterested in this information?Contact us
6.80 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.80 miles Valley ThreeInterested in this information?Contact us
6.83 miles Point PlusInterested in this information?Contact us
6.84 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
6.86 miles Station UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.91 miles ValleyInterested in this information?Contact us
6.92 miles Prime ValleyInterested in this information?Contact us
6.94 miles PowerHouse: Arcola Bldg B
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
6.97 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
6.98 miles Hub ThreeInterested in this information?Contact us
6.98 miles GlobalInterested in this information?Contact us
6.99 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.99 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
7.00 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
7.01 miles PowerHouse: Arcola Bldg A
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
7.02 miles Tower GammaInterested in this information?Contact us
7.06 miles Plaza PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.07 miles Hub UltraInterested in this information?Contact us
7.08 miles WestInterested in this information?Contact us
7.17 miles Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.19 miles Global PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.19 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
7.23 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
7.25 miles Plaza ProInterested in this information?Contact us
7.27 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
7.35 miles SouthInterested in this information?Contact us
7.36 miles Center BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.37 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.41 miles Global TowerInterested in this information?Contact us
7.42 miles Stack: NVA06B
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
7.43 miles PrimeInterested in this information?Contact us
7.43 miles Ridge GammaInterested in this information?Contact us
7.46 miles Cloud CenterInterested in this information?Contact us
7.48 miles West TowerInterested in this information?Contact us
7.48 miles RidgeInterested in this information?Contact us
7.49 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.50 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
7.50 miles Peterson: Leesburg Gateway Campus
Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
7.51 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.53 miles Stack: NVA06A
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
7.54 miles PrimeInterested in this information?Contact us
7.55 miles UltraInterested in this information?Contact us
7.55 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.56 miles Hub ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.62 miles Park ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.65 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.67 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
7.71 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.79 miles SouthInterested in this information?Contact us
7.94 miles South ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.95 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
7.96 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.97 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
7.98 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.14 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
8.24 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
8.29 miles Global ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.41 miles South CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.42 miles West ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.11 miles Parkstone Tech Park
11.69 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
12.88 miles Equinix Vienna DC8
13.32 miles Atmosphere: Dickerson, Maryland
13.41 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
14.06 miles Cogent Vienna
14.10 miles 8100 Boone - Digital Realty
14.49 miles DataBank McLean IAD2
In 2020, DataBank acquired the site from zColo.
14.53 miles Lumen McLean 1
14.54 miles Equinix Vienna DC7
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC7 in Q2 2026.
14.58 miles Element Critical VA1
14.84 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
15.20 miles Verizon: 7777 Infantry Ridge
Former AOL data center
15.30 miles Equinix Manassas DC14
15.82 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
15.88 miles Station BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.93 miles Campus OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.13 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.24 miles Edge CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.39 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.47 miles RidgeInterested in this information?Contact us
16.49 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
16.56 miles GammaInterested in this information?Contact us
16.56 miles Core CenterInterested in this information?Contact us
16.57 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
16.58 miles ThreeInterested in this information?Contact us
16.60 miles Corscale: Gainesville 1
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
16.64 miles Hub ThreeInterested in this information?Contact us
16.72 miles BetaInterested in this information?Contact us
16.77 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
16.77 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
16.88 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
17.08 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.08 miles Edge TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.10 miles Campus MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.12 miles Global ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.12 miles Park PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.17 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.17 miles Edge HubInterested in this information?Contact us
17.20 miles Edge ValleyInterested in this information?Contact us
17.22 miles Ridge PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.23 miles Ridge UltraInterested in this information?Contact us
17.24 miles Prime ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.31 miles Park PrimeInterested in this information?Contact us
17.31 miles PrimeInterested in this information?Contact us
17.32 miles Plaza OneInterested in this information?Contact us
17.32 miles StationInterested in this information?Contact us
17.33 miles Edge ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.36 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
17.37 miles Park UltraInterested in this information?Contact us
17.39 miles BlackChamber: Gainesville, VA
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
17.42 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.43 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
17.43 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
17.44 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
17.45 miles NTT: VA10
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
17.45 miles Plaza GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.46 miles Hub PlusInterested in this information?Contact us
17.49 miles Iron Mountain VA-1
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
17.54 miles Iron Mountain VA-2
17.55 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
17.55 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.57 miles Center MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.59 miles South PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.61 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
17.62 miles Park AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.62 miles Campus OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.64 miles Plaza AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.64 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
17.68 miles Point UltraInterested in this information?Contact us
17.69 miles Cloud PointInterested in this information?Contact us
17.70 miles StationInterested in this information?Contact us
17.71 miles Center ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.72 miles East TowerInterested in this information?Contact us
17.72 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
17.72 miles Opus Interactive Manassas
17.78 miles Valley AlphaInterested in this information?Contact us
17.79 miles Global CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.84 miles Core PointInterested in this information?Contact us
17.86 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
17.88 miles Iron Mountain: VA-8
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
17.97 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
18.03 miles TPC: Manassas, VA
18.05 miles Iron Mountain: VA-6
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
18.17 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
18.18 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
18.21 miles PlusInterested in this information?Contact us
18.26 miles Yondr Bristow Campus
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
18.30 miles MaxInterested in this information?Contact us
18.30 miles Core ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.35 miles Yondr: Manassas
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
18.42 miles Stack: NVA05A
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
18.43 miles Yondr: Bristow Bldg 2
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
18.47 miles Cloud ValleyInterested in this information?Contact us
18.57 miles 8217 Linton Hall (VA4) Digital Realty
18.66 miles QTS Manassas 1 DC5
This facility is part of QTS Data Center Campus in Manassas.
18.69 miles QTS: Manassas 1 DC3
This facility is part of QTS Data Center Campus in Manassas.
18.75 miles QTS: Manassas 1 DC2
This facility is part of QTS Data Center Campus in Manassas.
18.75 miles QTS: Manassas 1 DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
18.78 miles Hub UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.80 miles JK Land: Comcast Center
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
18.81 miles Core TowerInterested in this information?Contact us
18.85 miles JK Land: Hunter Trust
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
18.88 miles QTS: Manassas 1 DC4
18.91 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.92 miles QTS Manassas 1 DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
18.95 miles Black Chamber: Nokesville
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
18.95 miles Prime StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.04 miles Campus UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.10 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.12 miles Station PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.18 miles Point OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.18 miles North PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.31 miles VAZATA Northern Virginia (NoVa One)
19.31 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
19.31 miles Tower OneInterested in this information?Contact us
19.31 miles Evoswitch USA WDC 1
19.34 miles Stack: NVA02G
NVA02G is a 185,803 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 9530 Hornbaker Road in Manassas, Virginia.
19.44 miles Stack: NVA02D
NVA02D is a 281,000 sq ft data center building on STACK Infrastructure's NVA02 campus at 9590 Hornbaker Road in Manassas, Virginia.
19.49 miles Stack: NVA02C
NVA02C, or Building C, is a 14,387 sq ft building on STACK Infrastructure's NVA02 campus at 9730 Hornbaker Road in Manassas, Virginia.
19.50 miles Digital Realty: IAD53
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
19.51 miles Metro TowerInterested in this information?Contact us
19.53 miles RidgeInterested in this information?Contact us
19.55 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.55 miles Stack: NVA02B
NVA02B is a 224,652 sq ft data center building on STACK Infrastructure's NVA02 campus at 9740 Hornbaker Road in Manassas, Virginia.
19.57 miles Stack: NVA02E
NVA02E is a 259,200 sq ft data center building on STACK Infrastructure's NVA02 campus at 9570 Hornbaker Road in Manassas, Virginia.
19.62 miles Stack: NVA02F
NVA02F is a data center building under construction on STACK Infrastructure's NVA02 campus at 9640 Hornbaker Road in Manassas, Virginia.
19.62 miles Stack: NVA02A
NVA02A is a 226,862 sq ft data center building on STACK Infrastructure's NVA02 campus at 9750 Hornbaker Road in Manassas, Virginia.
19.63 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.70 miles Digital Realty: IAD50
19.72 miles Stack: NVA02H
NVA02H is a 256,212 sq ft, two-story data center building under construction on STACK Infrastructure's NVA02 campus at 10167 Linton Hall Road in Prince William County, Virginia.
19.72 miles Center ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.73 miles Hub PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.78 miles Digital Realty: IAD51
19.78 miles Central PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.78 miles Stack: NVA02I
NVA02I is a 256,280 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10161 Linton Hall Road in Prince William County, Virginia.
19.84 miles Station MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.86 miles Core CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.91 miles Point ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.91 miles Stack: NVA02J
NVA02J is a 201,000 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10155 Linton Hall Road in Prince William County, Virginia.
19.96 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Cyrusone: Beaumeade Circle Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

CyrusOne is a data center owner, operator, and developer that manages more than 50 facilities, with its footprint concentrated in the U.S. and Europe. The company is based in Dallas and was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.

Its portfolio centers on hyperscale and enterprise colocation across multi-building campuses. CyrusOne has also pursued international growth initiatives alongside its core North American and European markets.

CyrusOne History:

  • March 2022: Taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.
  • July 2015: Acquired Cervalis, adding four data centers and two disaster recovery sites in the New York metro.
  • July 2014: Acquired Cervalis
  • January 2013: Completed initial public offering on NASDAQ as a carve-out of Cincinnati Bell’s data center business.
  • June 2010: Cincinnati Bell acquired CyrusOne for approximately 525 million dollars.
  • 2000: Founded by David Ferdman.
0
Facilities
0
Markets

News See all

Read CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas
CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone Co...

CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas

August 01, 2026 CyrusOne

CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone County, about 90 miles (144.8km) south of Dallas, is part of a 760MW data center development being...

Read more
Read CyrusOne Begins Construction on 380MW Data Center in Texas
CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development...

CyrusOne Begins Construction on 380MW Data Center in Texas

June 08, 2026 CyrusOne

CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development have not yet been disclosed. CyrusOne has partnered with Constellation on a 380MW agreement to...

Read more
Read CyrusOne to Internalize US Data Center Operations
CyrusOne to Internalize US Data Center Operations

CyrusOne to Internalize US Data Center Operations

May 07, 2026 CyrusOne

US data center operator CyrusOne is bringing a significant portion of its on-site operations in-house, ending large sections of its existing outsourcing partnership with JLL. The KKR-owned company confirmed to DCD this week that it is restructuring its US operating model by internalizing on-site...

Read more
Read CyrusOne Wins Approval for Sangamon, Illinois Data Center
CyrusOne Wins Approval for Sangamon, Illinois Data Center

CyrusOne Wins Approval for Sangamon, Illinois Data Center

April 09, 2026 CyrusOne

CyrusOne has received approval to build a data center in Sangamon, Illinois. Members of the Sangamon County Board voted on Tuesday to allow construction of the $500 million project, which will span 280 acres and include four buildings at the 13000 block of Thayer Road in Waverly.CyrusOne has said...

Read more
Read CyrusOne Starts Construction on First Italy Data CenterI Outside Milan
CyrusOne Starts Construction on First Italy Data CenterI Outside Milan

CyrusOne Starts Construction on First Italy Data CenterI Outside Milan

March 28, 2026 CyrusOne

CyrusOne has broken ground on its first data center in Italy. The company this week announced it has officially broken ground on MIL1 in Milan. The three-story facility will deliver 27MW of IT capacity across 7,000 sqm (75,345 sq ft) of technical space, with the first phase expected to go live by...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?