Latest Podcast 19275 Compass Creek Parkway SE
Operational
Fully operational facility
Operated by:

Stack: NVA06A

Short Code: NVA06A
Year Built: 2025
Utility Provider: NOVEC
Lot Size: 32 acres

Sites on this Campus:

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space. The first building is set to deliver Q2 2025, followed by a second building to follow soon after, both served by committed power from Northern Virginia Electric Cooperative (NOVEC).

Map and Nearby Locations

19275 Compass Creek Parkway SE
STACK INFRASTRUCTURE Sites
Nearby Facilities

Stack: NVA06A Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Stack: NVA06A

Distance Site About
0.18 miles Stack: NVA06B
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
0.48 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.52 miles Cloud HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.89 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.92 miles Center UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.17 miles Metro CampusInterested in this information?Contact us
1.24 miles Center PlusInterested in this information?Contact us
1.47 miles JK Land: Cross Mill Center
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
1.71 miles Tuscarora Crossing Campus
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
1.81 miles JK Land: Greenlin Expansion
1.95 miles JK Land: Greenlin Park 1
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
1.96 miles Center PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.05 miles Hyperscale Data CenterInterested in this information?Contact us
2.15 miles Hyperscale Data CenterInterested in this information?Contact us
2.17 miles South CenterInterested in this information?Contact us
2.19 miles Peterson: Leesburg Gateway Campus
Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
2.20 miles Hyperscale Data CenterInterested in this information?Contact us
2.26 miles Hyperscale Data CenterInterested in this information?Contact us
2.37 miles SDC Capital: Twin Creeks
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
2.43 miles Center BetaInterested in this information?Contact us
2.48 miles Springfield East: Leesburg, VA
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
2.55 miles Luck Stone: Ashburn 1
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
2.58 miles Luck Stone: Ashburn Expansion
2.93 miles Farkas Family: Leesburg, VA
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
3.02 miles Belmont Innovation Campus
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
3.05 miles Compass Loudoun County
3.07 miles Vantage: VA37
This facility is a part of Vantage's VA3 data center campus in Ashburn.
3.08 miles Vantage: VA33
This facility is a part of Vantage's VA3 data center campus in Ashburn.
3.13 miles Vantage: VA36
This facility is a part of Vantage's VA3 data center campus in Ashburn.
3.15 miles Vantage: VA31
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
3.20 miles Vantage: VA32
This facility is a part of Vantage's VA3 data center campus in Ashburn.
3.27 miles Vantage: VA35
This facility is a part of Vantage's VA3 data center campus in Ashburn.
3.31 miles Vantage: VA34
This facility is a part of Vantage's VA3 data center campus in Ashburn.
3.46 miles JK Land: Freedom Trail Rd
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
4.05 miles CyrusOne: Broadlands Expansion
4.08 miles CyrusOne: Broadlands Boulevard 1
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
4.75 miles JK Land: Ashburn
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
4.88 miles Active Infra: Spring Valley Expansion
5.28 miles Valley UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.57 miles Active Infra: Spring Valley 1
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
6.30 miles DataBank Ashburn IAD3
6.35 miles DataBank Ashburn IAD4
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
6.40 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
6.41 miles FastServ Ashburn
6.42 miles DataBank Ashburn IAD1
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
6.43 miles DataCanopy: Ashburn 1
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
6.44 miles NTT: VA8
6.49 miles South ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.50 miles Regency DC Campus Ashburn
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
6.54 miles Sabey Intergate: Ashburn Bldg-B
6.55 miles NTT VA4
6.55 miles Sabey Intergate: Ashburn Bldg-C
Intergate.Ashburn is a purpose-built data center campus on 38 acres
6.59 miles NTT: VA9
6.61 miles NTT VA5
6.67 miles Sabey Intergate: Ashburn Bldg-A
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
6.67 miles NTT: VA6
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
6.74 miles Global CampusInterested in this information?Contact us
6.78 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
6.79 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
6.79 miles NTT: VA7
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
6.81 miles Equinix DC13
Equinix DC13 is a colocation data center on the former UUNET campus at 21830 UUNET Way in Ashburn, Virginia, built in 2000 and acquired from Verizon in 2017.
6.83 miles Edge TowerInterested in this information?Contact us
6.84 miles 43790 Devin Shafron (Bldg E)
6.87 miles East ValleyInterested in this information?Contact us
6.88 miles 43791 Devin Shafron (Bldg D)
6.89 miles Ridge TwoInterested in this information?Contact us
6.89 miles CloudHQ: LC5
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
6.89 miles Rackspace Ashburn IAD3
6.89 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
6.91 miles 43830 Devin Shafron (Bldg F)
6.91 miles Deft: DRT-IAD1
6.92 miles Aligned: IAD-02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
6.92 miles Aligned: IAD-01
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
6.93 miles PointInterested in this information?Contact us
6.93 miles Point PrimeInterested in this information?Contact us
6.95 miles 44521 Hastings (ACC5) Digital Realty
6.96 miles CloudHQ: LC11
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
6.96 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
6.97 miles 43831 Devin Shafron (Bldg C)
6.97 miles 44470 Chillum - Digital Realty
6.97 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
7.00 miles NTT VA2
7.02 miles CloudHQ: LC12
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
7.02 miles CloudHQ: LC14
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
7.03 miles Quantum Connect: Ashburn, VA
A data center is under construction at the Quantum business park in Ashburn, Virginia.
7.06 miles 44490 Chilum (ACC2): Digital Realty
7.07 miles 43881 Devin Shafron (Bldg B)
7.07 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
7.08 miles 43915 Devin Shafron (Bldg A)
7.08 miles CloudHQ: LC13
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
7.08 miles 21745 Sir Timothy (ACC9) Digital Realty
7.10 miles 44520 Hastings (ACC3) Digital Realty
7.11 miles Lumen Ashburn
7.11 miles Valley ProInterested in this information?Contact us
7.16 miles Equinix Ashburn DC4
Equinix DC4 is a single-story colocation data center at 21691 Filigree Court on Equinix's Ashburn, Virginia campus that opened in Q1 2007.
7.19 miles Equinix: DC17
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
7.19 miles Cologix: ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
7.19 miles 21744 Sir Timothy Drive (ACC10)
7.19 miles Equinix: DC18
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
7.20 miles DataCanopy: Ashburn 2
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
7.21 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
7.21 miles Equinix Ashburn DC5
Equinix DC5 is a single-story colocation data center at 21701 Filigree Court on Equinix's Ashburn, Virginia campus that opened in Q2 2008.
7.22 miles Cologix: ASH2
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
7.23 miles 43780 Digital Loudoun Plaza (Bldg H)
7.24 miles 43940 Digital Loudoun Plaza (Bldg G)
7.26 miles ProInterested in this information?Contact us
7.26 miles Equinix DC16
Equinix DC16 is a four-story colocation data center at 44740 Performance Circle in Ashburn, Virginia, that opened in Q4 2023 and added two more phases in 2025.
7.27 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
7.27 miles West CampusInterested in this information?Contact us
7.28 miles 44372 Round Table: Digital Realty
7.28 miles Equinix Ashburn DC1
Equinix DC1 at 21711 Filigree Court in Ashburn, Virginia, opened in July 1999 as Equinix's first data center and anchors its Ashburn campus.
7.31 miles Centersquare: Ashburn WDC1
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
7.31 miles Metro ValleyInterested in this information?Contact us
7.32 miles 44100 Digital Loudoun Plaza (Bldg J)
7.32 miles 44274 Round Table (Bldg L)
7.32 miles Lightedge: Ashburn
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
7.34 miles Digital Realty: 21561 Beaumeade Cir
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
7.34 miles CloudHQ LC2
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
7.36 miles CloudHQ: LC10
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
7.36 miles 44060 Digital Loudoun Plaza (Bldg K)
7.37 miles Equinix Ashburn DC11
Equinix DC11 is a two-story colocation data center at 21721 Filigree Court, the final building on Equinix's Ashburn, Virginia campus, opened in January 2013.
7.37 miles Equinix Ashburn DC6
Equinix DC6 is a two-story colocation data center at 21721 Filigree Court on Equinix's Ashburn, Virginia campus that opened in July 2010.
7.37 miles CloudHQ: LC1A
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
7.41 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
7.42 miles Equinix DC15
Equinix DC15 is a two-story colocation data center at 44780 Performance Circle in Ashburn, Virginia, that opened in Q2 2020 and doubled with a second phase in Q4 2021.
7.44 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
7.44 miles CloudHQ: LC4
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
7.45 miles Cologix: Ashburn Expansion (Beaumeade Circle)
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
7.46 miles CloudHQ: LC3
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
7.46 miles CloudHQ: LC1B
7.47 miles CloudHQ: LC9
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
7.50 miles Digital Realty: IAD-56
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
7.51 miles Washington Commanders: Ashburn, VA
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
7.53 miles Cyrusone: Beaumeade Circle
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
7.53 miles PowerHouse ABX1
7.56 miles Metro PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.56 miles QTS Ashburn-Shellhorn DC1
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
7.57 miles West CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.57 miles QTS Ashburn-Shellhorn DC2
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
7.61 miles Equinix: DC22
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
7.63 miles CloudHQ: LC8
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
7.63 miles 44751 Round Table (Bldg P)
7.68 miles Equinix DC21
Equinix DC21 is a two-story colocation data center at 22175 Beaumeade Circle in Ashburn, Virginia, that opened in Q4 2020 and grew in phases through Q3 2023.
7.69 miles Corscale: Kincora
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
7.70 miles SDC: Import Plaza A
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
7.70 miles Hub ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.71 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
7.81 miles SDC: Import Plaza B
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
7.81 miles Metro ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.86 miles Valley AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.86 miles SDC: Import Plaza C
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
7.87 miles Core StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.87 miles SDC: Import Plaza D
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
7.90 miles Stack: NVA04C
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
7.90 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.95 miles Hyperscale Data CenterInterested in this information?Contact us
7.96 miles Stack: NVA04B
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
7.96 miles Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.96 miles Hyperscale Data CenterInterested in this information?Contact us
8.02 miles Stack: NVA04A
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
8.02 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.02 miles CyrusOne: NVA7
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
8.03 miles Dulles 28 Centre Motorplex
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
8.04 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.05 miles DataCanopy: Sterling, VA
Data Canopy colocation space in Sterling, Virginia, with private and multi-tenant cages.
8.05 miles 21641 Charles View
8.08 miles Plaza PrimeInterested in this information?Contact us
8.08 miles Hyperscale Data CenterInterested in this information?Contact us
8.09 miles CyrusOne: NVA5
8.10 miles Hyperscale Data CenterInterested in this information?Contact us
8.14 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.14 miles Valley MaxInterested in this information?Contact us
8.14 miles 21710 Charles View
8.15 miles Plaza OneInterested in this information?Contact us
8.16 miles Digital Realty: Broderick Drive
8.18 miles SDC: Low Latency Lane 2
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
8.21 miles Digital Realty: IAD43
8.21 miles East CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.22 miles SDC: Low Latency Lane 1
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
8.23 miles Valley ThreeInterested in this information?Contact us
8.25 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.28 miles Dulles 28 Technology Park
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
8.29 miles SDC: Low Latency Lane Expansion
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
8.29 miles ValleyInterested in this information?Contact us
8.30 miles PowerHouse: Pacific Bldg C
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
8.31 miles PowerHouse: Pacific Bldg A
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
8.35 miles PowerHouse: Pacific Bldg B
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
8.36 miles Paragon Park Lot 3B
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
8.37 miles QTS: ASH2 DC2
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
8.40 miles QTS: ASH2 DC1
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
8.42 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
8.48 miles PointOne: Ashburn
The campus will have 2 buildings
8.50 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
8.51 miles PointOne: IAD2
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
8.53 miles TA Realty: Sterling, Virginia
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
8.61 miles Menlo: MD-DC2 (Sterling)
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
8.64 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
8.65 miles Vantage VA13
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
8.67 miles ValleyInterested in this information?Contact us
8.70 miles Vantage VA14
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
8.70 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
8.74 miles COPT: 45771 Maries Rd
8.74 miles TwoInterested in this information?Contact us
8.75 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
8.75 miles Vantage VA15
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
8.77 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
8.77 miles JK Land: Tech Park 1 Expansion
8.78 miles Sentinel: Cloud Plaza, Sterling, VA
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
8.78 miles Vantage VA12
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
8.79 miles Vantage VA11
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
8.81 miles Vantage VA16
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
8.82 miles Core TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.82 miles COPT: 45761 Maries Rd
8.82 miles East CampusInterested in this information?Contact us
8.85 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
8.85 miles Tower UltraInterested in this information?Contact us
8.90 miles West StationInterested in this information?Contact us
8.92 miles Hub UltraInterested in this information?Contact us
8.95 miles Hyperscale Data CenterInterested in this information?Contact us
8.95 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
8.97 miles CyrusOne Northern Virginia Sterling I, II, III
8.98 miles Cloud PlazaInterested in this information?Contact us
9.00 miles Centersquare: Sterling DC3
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
9.02 miles Hub UltraInterested in this information?Contact us
9.04 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
9.05 miles Tower TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.09 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
9.10 miles 21110 Ridgetop
The site is fully leased to triple net tenants.
9.12 miles Centersquare: Sterling DC2
9.12 miles EdgeCore Ashburn
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
9.12 miles North ValleyInterested in this information?Contact us
9.13 miles Park MaxInterested in this information?Contact us
9.13 miles Cloud StationInterested in this information?Contact us
9.14 miles Centersquare: Sterling DC4
9.14 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.15 miles Central ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.15 miles Campus MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.15 miles Prologis: Executive Drive
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
9.17 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
9.17 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
9.17 miles CyrusOne Sterling VIII
9.19 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
9.20 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
9.22 miles Point PrimeInterested in this information?Contact us
9.22 miles Cloud CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.23 miles Tower AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.24 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
9.26 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
9.26 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.26 miles Vantage: VA22
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
9.26 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
9.27 miles Park GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.28 miles Prime RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.29 miles Edge CenterInterested in this information?Contact us
9.30 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
9.30 miles Vantage: VA21
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
9.30 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
9.32 miles Core PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.33 miles Prime RidgeInterested in this information?Contact us
9.33 miles CampusInterested in this information?Contact us
9.36 miles West ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.36 miles ParkInterested in this information?Contact us
9.36 miles Prime ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.36 miles Vantage: VA23
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
9.37 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
9.38 miles Digital Realty: IAD55
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
9.39 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
9.39 miles PointInterested in this information?Contact us
9.39 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.46 miles Tower TwoInterested in this information?Contact us
9.46 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.46 miles Metro PointInterested in this information?Contact us
9.46 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
9.48 miles Central ParkInterested in this information?Contact us
9.52 miles Prologis: Global Plaza Rd
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
9.54 miles Csquare: Dulles IAD3
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
9.55 miles Park TwoInterested in this information?Contact us
9.56 miles UltraInterested in this information?Contact us
9.60 miles East ValleyInterested in this information?Contact us
9.61 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.64 miles Ridge ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.69 miles PowerHouse: Arcola Bldg B
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
9.71 miles PowerHouse: Arcola Bldg A
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
9.79 miles Kyndryl: Sterling
9.86 miles Prime PointInterested in this information?Contact us
9.89 miles Prime ParkInterested in this information?Contact us
9.93 miles Prime CenterInterested in this information?Contact us
10.07 miles CyrusOne Northern Virginia Sterling IV
10.09 miles Connect Data Centers: Sterling, VA
10.15 miles Centersquare: IAD2-B
10.16 miles South CampusInterested in this information?Contact us
10.17 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
10.22 miles Ridge BetaInterested in this information?Contact us
10.30 miles ThreeInterested in this information?Contact us
10.43 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
10.46 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
10.47 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.53 miles West StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.54 miles Core StationInterested in this information?Contact us
10.55 miles CoreInterested in this information?Contact us
10.55 miles Core PlazaInterested in this information?Contact us
10.60 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.64 miles Central ValleyInterested in this information?Contact us
10.88 miles Atmosphere: Dickerson, Maryland
11.84 miles South CampusInterested in this information?Contact us
11.91 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.91 miles East RidgeInterested in this information?Contact us
11.95 miles Tower PlusInterested in this information?Contact us
11.99 miles Edge StationInterested in this information?Contact us
12.01 miles Cloud ValleyInterested in this information?Contact us
12.03 miles Edge TowerInterested in this information?Contact us
12.04 miles East HubInterested in this information?Contact us
12.17 miles PlusInterested in this information?Contact us
12.17 miles Tower UltraInterested in this information?Contact us
12.21 miles North StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.22 miles Station TwoInterested in this information?Contact us
12.34 miles GlobalInterested in this information?Contact us
12.36 miles West CampusInterested in this information?Contact us
12.48 miles Core CampusInterested in this information?Contact us
12.48 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.60 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.60 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.63 miles TowerInterested in this information?Contact us
12.68 miles South StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.71 miles Lumen Herndon 1
12.72 miles Tower AlphaInterested in this information?Contact us
12.73 miles Lumen Herndon 3
12.79 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
12.91 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
12.91 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
13.05 miles H5: Herndon
13.07 miles Equinix Herndon DC97
Equinix DC97 is a leased colocation data center at 460 Springpark Place in Herndon, Virginia. Terremark opened it in 2005 as a regional exchange; Verizon acquired Terremark in 2011 and sold the site to Equinix in 2017.
13.12 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
13.12 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
13.21 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
13.24 miles EdgeInterested in this information?Contact us
13.31 miles Hub GammaInterested in this information?Contact us
13.31 miles Point GammaInterested in this information?Contact us
13.38 miles West StationInterested in this information?Contact us
13.40 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
13.42 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.46 miles Core CampusInterested in this information?Contact us
13.62 miles East PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.69 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.80 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
13.89 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
13.97 miles Tower UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.04 miles South PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.07 miles CoreSite: VA2
14.07 miles Global CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.09 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
14.09 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
15.40 miles Parkstone Tech Park
15.49 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
15.66 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
15.77 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
16.22 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
17.13 miles Rowan: Frederick 1A
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland.
17.14 miles Center PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.24 miles Center MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.26 miles Rowan: Frederick 1C
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
17.32 miles East PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.33 miles Rowan: Frederick 2C
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
17.34 miles Rowan: Frederick 1B
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
17.34 miles Rowan: Frederick 2D
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
17.44 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
17.47 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.48 miles Rowan: Frederick 2B
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
17.49 miles Rowan: Frederick 1D
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
17.56 miles Rowan: Frederick 2A
Bauxite II will span 822,620 sq ft (76,400 sqm) on a 111.5-acre site, comprising four data center buildings.
17.84 miles Rowan: Frederick 3C
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
17.92 miles Rowan: Frederick 3A
Bauxite III will span 591,913 sq ft (54,990 sqm) across a 55-acre site, comprising three data center buildings.
18.00 miles Rowan: Frederick 3B
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
18.08 miles Aligned: IAD04 Bldg1
The company withdrew in 2023 when Maryland restricted diesel generator usage. However, following regulatory changes, Aligned recommitted to the project in 2024.
18.16 miles Aligned: IAD04 Bldg2
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
18.17 miles Aligned: IAD06
Aligned is developing IAD-06 as part of its Frederick campus within Quantum Frederick Park, expanding hyperscale data center infrastructure on a former industrial redevelopment site in Maryland.
18.22 miles Aligned: IAD04 Bldg3
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
18.31 miles Aligned: IAD04 Bldg4
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
18.33 miles TPG Real Estate: Frederick Campus
The Quantum Frederick Project, a 2,100-acre data center campus and fiber optic loop (QLoop) in Frederick County, Maryland, was first announced by TPG Real Estate and Quantum Loophole in 2021.
18.92 miles CampusInterested in this information?Contact us
18.98 miles North CenterInterested in this information?Contact us
18.99 miles AlphaInterested in this information?Contact us
19.05 miles UltraInterested in this information?Contact us
19.35 miles Corscale: Gainesville 1
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
19.37 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
19.37 miles Verizon: 7777 Infantry Ridge
Former AOL data center
19.43 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
19.44 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
19.49 miles Equinix Manassas DC14
Equinix DC14 is a two-story colocation data center at 7400 Infantry Ridge Road in Manassas, Virginia, built in 2004 and acquired from Verizon, where it was IAD4, in 2017.
19.52 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
19.52 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
19.53 miles Point GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.57 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
19.58 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
19.60 miles Core RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.62 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
19.63 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.65 miles Edge RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.65 miles Park AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.66 miles NTT: VA10
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
19.68 miles West PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.71 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
19.73 miles Station BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.84 miles Center ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.89 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
19.93 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.93 miles Park ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.97 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Stack: NVA06A Data Center Photos See all

Stack Infrastructure's NVA06 Campus Sitemap
Source: STACK Infrastructure
Stack Infrastructure's NVA06 Campus Sitemap
Source: STACK Infrastructure
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

STACK Infrastructure is a privately held platform sponsored by IPI Partners that focuses on large scale wholesale capacity and campus development for hyperscale and enterprise customers.

The company was launched in 2019 when IPI combined the remaining Infomart Data Centers assets with selected T5 Data Centers facilities, and industry coverage at launch cited eight data centers across six U.S. markets totaling about 100 MW. In March 2022, IPI unified DigiPlex in the Nordics and SUPERNAP Italia in Milan under the STACK brand to form STACK EMEA, expanding the platform across Europe. STACK has since added international sites, including the first phase of a 56 MW campus in Toronto and its first Australian data center in Melbourne. Core services referenced by the company and trade press include wholesale colocation, build to suit, and powered shell solutions.

STACK Infrastructure History:

  • 2025: Sold its European enterprise colocation business (seven data centers in Stockholm, Oslo, Copenhagen, Milan and Geneva) to Apollo-managed funds; it now operates as Vaultica. STACK EMEA kept its hyperscale campuses.
  • 2023: Opened the first Australian data center in Melbourne on a multi-building campus.
  • 2023: Delivered the first 8 MW phase of a planned 56 MW campus in Toronto.
  • 2022: Rebranded DigiPlex (Nordics) and SUPERNAP Italia (Milan) as STACK EMEA.
  • 2019: IPI Partners launched STACK Infrastructure by combining the three Infomart Data Centers sites with selected T5 Data Centers assets. The company was rebranded as STACK INFRASTRUCTURE
  • 2018: ASB Real Estate Investments sold the three remaining Infomart Data Centers facilities in San Jose, Hillsboro, and Ashburn to IPI Partners; the Dallas Infomart carrier hotel was sold separately to Equinix earlier that year.
  • 2014: Acquired a facility in Ashburn that had been owned by AOL.
  • 2014: ASB Real Estate Fund, a subsidiary of DCI Technology Holdings, merged Infomart with Fortune Data Centers. The combined company was renamed to Infomart Data Centers.
  • 2012: Expanded to Oregon with a building in Hillsboro
  • 2007: John Sheputis purchased first Fortune Data Center in San Jose, CA, backed by ASB Real Estate
  • 2006: ASB Real Estate purchased Infomart Dallas building
  • 2006: Fortune Founded as Fortune Data Centers
0
Facilities
0
Markets

News See all

Read Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium
State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's grow...

Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium

October 15, 2026 Virginia

State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's growth in the world's largest data center market. Senate Bill 843 would take effect July 1, 2027 and...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations
Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

August 23, 2024 Northern Virginia

A report from Synergy Research Group found that just twenty state or metro markets account for 62 percent of the world’s current hyperscale data center capacity. Northern Virginia tops this list while the Greater Beijing Area takes the second place, with both making up 22 percent of global...

Read more
Read Stack Infrastructure breaks ground on 60MW data center expansion in California
 Stack Infrastructure breaks ground on 60MW data center expansion in California

Stack Infrastructure breaks ground on 60MW data center expansion in California

March 29, 2024 STACK INFRASTRUCTURE

IPI-owned company Stack Infrastructure announced this week that it has broken ground on a 60MW data center expansion in Silicon Valley, California. The company plans to build two data centers to add 60MW of capacity, an advanced manufacturing facility, and a parking structure, spanning 19 acres....

Read more
Read Stack Infrastructure to expand footprint in Virginia
Stack Infrastructure to expand footprint in Virginia

Stack Infrastructure to expand footprint in Virginia

January 11, 2024 STACK INFRASTRUCTURE

Data center firm Stack Infrastructure this week announced plans to expand its footprint in Virginia with a new 72MW campus in Leesburg. in Loudoun County. This planned facility, known as the NVA-06 will initially host a 48MW building set to deliver Q2 2025, followed by a second 24MW building to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?