0.18 miles
|
Stack: NVA06B
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
0.48 miles
|
RidgeInterested in this information?Contact us
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
|
0.52 miles
|
Global PointInterested in this information?Contact us
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
|
0.89 miles
|
Valley ProInterested in this information?Contact us
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
|
0.92 miles
|
Station GammaInterested in this information?Contact us
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
|
1.17 miles
|
TowerInterested in this information?Contact us
|
|
|
1.24 miles
|
SouthInterested in this information?Contact us
|
|
|
1.47 miles
|
JK Land: Cross Mill Center
|
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
|
|
1.71 miles
|
Tuscarora Crossing Campus
|
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
|
|
1.81 miles
|
JK Land: Greenlin Expansion
|
|
|
1.95 miles
|
JK Land: Greenlin Park 1
|
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
|
|
1.96 miles
|
Tower ThreeInterested in this information?Contact us
|
The campus consists of five buildings, with a total of 1.9 million-square-feet.
|
|
2.05 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.15 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.17 miles
|
Valley UltraInterested in this information?Contact us
|
|
|
2.19 miles
|
Peterson: Leesburg Gateway Campus
|
Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
|
|
2.20 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.26 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.37 miles
|
SDC Capital: Twin Creeks
|
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
|
|
2.43 miles
|
RidgeInterested in this information?Contact us
|
|
|
2.48 miles
|
Springfield East: Leesburg, VA
|
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
|
|
2.55 miles
|
Luck Stone: Ashburn 1
|
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
|
|
2.58 miles
|
Luck Stone: Ashburn Expansion
|
|
|
2.93 miles
|
Farkas Family: Leesburg, VA
|
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
|
|
3.02 miles
|
Belmont Innovation Campus
|
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
|
|
3.05 miles
|
Compass Loudoun County
|
|
|
3.07 miles
|
Vantage: VA37
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.08 miles
|
Vantage: VA33
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.13 miles
|
Vantage: VA36
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.15 miles
|
Vantage: VA31
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
|
3.20 miles
|
Vantage: VA32
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.27 miles
|
Vantage: VA35
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.31 miles
|
Vantage: VA34
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.46 miles
|
JK Land: Freedom Trail Rd
|
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
|
|
4.05 miles
|
CyrusOne: Broadlands Expansion
|
|
|
4.08 miles
|
CyrusOne: Broadlands Boulevard 1
|
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
|
4.75 miles
|
JK Land: Ashburn
|
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
|
|
4.88 miles
|
Active Infra: Spring Valley Expansion
|
|
|
5.28 miles
|
Station TwoInterested in this information?Contact us
|
Amazon completed its $427.3 million acquisition of GWU’s 122-acre Ashburn campus to build the Bridgefield Tech Center, featuring four two-story data centers totaling 800,000 square feet alongside three parking structures.
|
|
5.57 miles
|
Active Infra: Spring Valley 1
|
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
|
|
6.30 miles
|
DataBank Ashburn IAD3
|
|
|
6.35 miles
|
DataBank Ashburn IAD4
|
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
|
6.40 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
|
6.41 miles
|
FastServ Ashburn
|
|
|
6.42 miles
|
DataBank Ashburn IAD1
|
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
|
|
6.43 miles
|
DataCanopy: Ashburn 1
|
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
|
6.44 miles
|
NTT: VA8
|
|
|
6.49 miles
|
CloudInterested in this information?Contact us
|
Amazon plans to build another data center in Loudoun County.
|
|
6.50 miles
|
Regency DC Campus Ashburn
|
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
|
|
6.54 miles
|
Sabey Intergate: Ashburn Bldg-B
|
|
|
6.55 miles
|
NTT VA4
|
|
|
6.55 miles
|
Sabey Intergate: Ashburn Bldg-C
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
|
6.59 miles
|
NTT: VA9
|
|
|
6.61 miles
|
NTT VA5
|
|
|
6.67 miles
|
Sabey Intergate: Ashburn Bldg-A
|
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
|
6.67 miles
|
NTT: VA6
|
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
|
6.74 miles
|
GlobalInterested in this information?Contact us
|
|
|
6.78 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
|
6.79 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
|
6.79 miles
|
NTT: VA7
|
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
|
6.81 miles
|
Equinix DC13
|
|
|
6.83 miles
|
AlphaInterested in this information?Contact us
|
|
|
6.84 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
6.87 miles
|
Ridge ProInterested in this information?Contact us
|
|
|
6.88 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
6.89 miles
|
RidgeInterested in this information?Contact us
|
|
|
6.89 miles
|
CloudHQ: LC5
|
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
|
6.89 miles
|
Rackspace Ashburn IAD3
|
|
|
6.89 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
6.91 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
6.91 miles
|
Deft: DRT-IAD1
|
|
|
6.92 miles
|
Aligned: IAD-02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
|
6.92 miles
|
Aligned: IAD-01
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
|
6.93 miles
|
West HubInterested in this information?Contact us
|
|
|
6.93 miles
|
Global StationInterested in this information?Contact us
|
|
|
6.95 miles
|
44521 Hastings (ACC5) Digital Realty
|
|
|
6.96 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
6.96 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
|
6.97 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
6.97 miles
|
44470 Chillum - Digital Realty
|
|
|
6.97 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
|
7.00 miles
|
NTT VA2
|
|
|
7.02 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
7.02 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
7.03 miles
|
Quantum Connect: Ashburn, VA
|
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
|
7.06 miles
|
44490 Chilum (ACC2): Digital Realty
|
|
|
7.07 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
7.07 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
7.08 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
7.08 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
7.08 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
|
7.10 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
|
7.11 miles
|
Lumen Ashburn
|
|
|
7.11 miles
|
South CenterInterested in this information?Contact us
|
|
|
7.16 miles
|
Equinix Ashburn DC4
|
|
|
7.19 miles
|
Equinix: DC17
|
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
|
7.19 miles
|
Cologix: ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
|
7.19 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
|
7.19 miles
|
Equinix: DC18
|
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
|
7.20 miles
|
DataCanopy: Ashburn 2
|
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
|
7.21 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
|
7.21 miles
|
Equinix Ashburn DC5
|
|
|
7.22 miles
|
Cologix: ASH2
|
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
|
|
7.23 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
7.24 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
7.26 miles
|
ProInterested in this information?Contact us
|
|
|
7.26 miles
|
Equinix DC16
|
|
|
7.27 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
|
7.27 miles
|
Global PointInterested in this information?Contact us
|
|
|
7.28 miles
|
44372 Round Table: Digital Realty
|
|
|
7.28 miles
|
Equinix Ashburn DC1
|
|
|
7.31 miles
|
Centersquare: Ashburn WDC1
|
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
|
7.31 miles
|
Point UltraInterested in this information?Contact us
|
|
|
7.32 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
7.32 miles
|
44274 Round Table (Bldg L)
|
|
|
7.32 miles
|
Lightedge: Ashburn
|
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
|
7.34 miles
|
Digital Realty: 21561 Beaumeade Cir
|
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
|
7.34 miles
|
CloudHQ LC2
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
7.36 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
7.36 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
7.37 miles
|
Equinix Ashburn DC6
|
|
|
7.37 miles
|
Equinix Ashburn DC11
|
|
|
7.37 miles
|
CloudHQ: LC1A
|
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
|
7.41 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
|
7.42 miles
|
Equinix DC15
|
|
|
7.44 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
|
7.44 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
7.45 miles
|
Cologix: Ashburn Expansion (Beaumeade Circle)
|
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
|
|
7.46 miles
|
CloudHQ: LC3
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
7.46 miles
|
CloudHQ: LC1B
|
|
|
7.47 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
7.50 miles
|
Digital Realty: IAD-56
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
|
7.51 miles
|
Washington Commanders: Ashburn, VA
|
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
|
7.53 miles
|
Cyrusone: Beaumeade Circle
|
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
|
7.53 miles
|
PowerHouse ABX1
|
|
|
7.56 miles
|
West StationInterested in this information?Contact us
|
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
|
|
7.56 miles
|
QTS Ashburn-Shellhorn DC1
|
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
|
|
7.57 miles
|
CloudInterested in this information?Contact us
|
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
|
|
7.57 miles
|
QTS Ashburn-Shellhorn DC2
|
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
|
|
7.61 miles
|
Equinix: DC22
|
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
|
7.63 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
7.63 miles
|
44751 Round Table (Bldg P)
|
|
|
7.68 miles
|
Equinix DC21
|
|
|
7.69 miles
|
Corscale: Kincora
|
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
|
|
7.70 miles
|
SDC: Import Plaza A
|
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
|
|
7.70 miles
|
OneInterested in this information?Contact us
|
IAD-161 is an Amazon Web Services data center in SDC Capital Partners' Import Plaza Building A at 44254 Import Plaza in Ashburn, Virginia.
|
|
7.71 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
|
7.81 miles
|
Tower PrimeInterested in this information?Contact us
|
IAD-162 is an Amazon Web Services data center in SDC Capital Partners' Import Plaza Building B at 44305 Import Plaza in Ashburn, Virginia.
|
|
7.81 miles
|
SDC: Import Plaza B
|
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
|
|
7.86 miles
|
ValleyInterested in this information?Contact us
|
IAD-606 is an Amazon Web Services support building in SDC Capital Partners' Import Plaza Building C at 44351 Import Plaza in Ashburn, Virginia.
|
|
7.86 miles
|
SDC: Import Plaza C
|
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
|
|
7.87 miles
|
GammaInterested in this information?Contact us
|
IAD-611 is a planned Amazon Web Services server storage building in SDC Capital Partners' Import Plaza Building D at 44360 Import Plaza in Ashburn, Virginia.
|
|
7.87 miles
|
SDC: Import Plaza D
|
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
|
|
7.90 miles
|
Stack: NVA04C
|
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
|
|
7.90 miles
|
Hub ProInterested in this information?Contact us
|
IAD-299 is a planned Amazon Web Services data center in STACK Infrastructure's NVA04C building at 22295 Lockridge Road in Sterling, Virginia.
|
|
7.95 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.96 miles
|
GammaInterested in this information?Contact us
|
IAD-286 is an Amazon Web Services data center in STACK Infrastructure's NVA04B building at 22285 Lockridge Road in Sterling, Virginia.
|
|
7.96 miles
|
Stack: NVA04B
|
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
|
|
7.96 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
8.02 miles
|
Stack: NVA04A
|
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
|
|
8.02 miles
|
Metro RidgeInterested in this information?Contact us
|
IAD-285 is an Amazon Web Services data center in STACK Infrastructure's NVA04A building at 22275 Lockridge Road in Sterling, Virginia.
|
|
8.02 miles
|
CyrusOne: NVA7
|
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
|
8.03 miles
|
Dulles 28 Centre Motorplex
|
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
|
|
8.04 miles
|
ProInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
8.05 miles
|
DataCanopy: Sterling, VA
|
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
|
|
8.05 miles
|
21641 Charles View
|
|
|
8.08 miles
|
East ValleyInterested in this information?Contact us
|
|
|
8.08 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
8.09 miles
|
CyrusOne: NVA5
|
|
|
8.10 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
8.14 miles
|
Core ParkInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
8.14 miles
|
21710 Charles View
|
|
|
8.14 miles
|
ParkInterested in this information?Contact us
|
|
|
8.15 miles
|
MaxInterested in this information?Contact us
|
|
|
8.16 miles
|
Digital Realty: Broderick Drive
|
|
|
8.18 miles
|
SDC: Low Latency Lane 2
|
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
8.21 miles
|
Digital Realty: IAD43
|
|
|
8.21 miles
|
Center GammaInterested in this information?Contact us
|
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
|
|
8.22 miles
|
SDC: Low Latency Lane 1
|
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
8.23 miles
|
West ValleyInterested in this information?Contact us
|
|
|
8.25 miles
|
Station GammaInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
8.28 miles
|
Dulles 28 Technology Park
|
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
|
|
8.29 miles
|
SDC: Low Latency Lane Expansion
|
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
|
|
8.29 miles
|
Prime StationInterested in this information?Contact us
|
|
|
8.30 miles
|
PowerHouse: Pacific Bldg C
|
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
8.31 miles
|
PowerHouse: Pacific Bldg A
|
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
|
|
8.35 miles
|
PowerHouse: Pacific Bldg B
|
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
8.36 miles
|
Paragon Park Lot 3B
|
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
|
|
8.37 miles
|
QTS: ASH2 DC2
|
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
|
|
8.40 miles
|
QTS: ASH2 DC1
|
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
|
|
8.42 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
8.48 miles
|
PointOne: Ashburn
|
The campus will have 2 buildings
|
|
8.50 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
|
8.51 miles
|
PointOne: IAD2
|
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
|
8.53 miles
|
TA Realty: Sterling, Virginia
|
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
|
|
8.61 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
8.64 miles
|
Stack: Loudoun 1
|
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
8.65 miles
|
Vantage VA13
|
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
|
|
8.67 miles
|
East StationInterested in this information?Contact us
|
|
|
8.70 miles
|
Vantage VA14
|
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
|
|
8.70 miles
|
Stack: Loudoun 2
|
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
8.74 miles
|
COPT: 45771 Maries Rd
|
|
|
8.74 miles
|
Metro ParkInterested in this information?Contact us
|
|
|
8.75 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
8.75 miles
|
Vantage VA15
|
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
|
|
8.77 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
8.77 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
8.78 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
8.78 miles
|
Vantage VA12
|
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
|
|
8.79 miles
|
Vantage VA11
|
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
|
|
8.81 miles
|
Vantage VA16
|
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
|
|
8.82 miles
|
Plaza TwoInterested in this information?Contact us
|
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
|
|
8.82 miles
|
COPT: 45761 Maries Rd
|
|
|
8.82 miles
|
ValleyInterested in this information?Contact us
|
|
|
8.85 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
8.85 miles
|
MetroInterested in this information?Contact us
|
|
|
8.90 miles
|
Edge PointInterested in this information?Contact us
|
|
|
8.92 miles
|
Edge ValleyInterested in this information?Contact us
|
|
|
8.95 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
8.95 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
8.97 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
|
8.98 miles
|
EastInterested in this information?Contact us
|
|
|
9.00 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
9.02 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
9.04 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
9.05 miles
|
Core RidgeInterested in this information?Contact us
|
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
|
|
9.09 miles
|
CyrusOne: NVA9 Bldg-1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
9.10 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
|
9.12 miles
|
Centersquare: Sterling DC2
|
|
|
9.12 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
9.12 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
9.13 miles
|
MaxInterested in this information?Contact us
|
|
|
9.13 miles
|
North CampusInterested in this information?Contact us
|
|
|
9.14 miles
|
Centersquare: Sterling DC4
|
|
|
9.14 miles
|
Campus UltraInterested in this information?Contact us
|
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
9.15 miles
|
Station PrimeInterested in this information?Contact us
|
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
|
|
9.15 miles
|
Tower MaxInterested in this information?Contact us
|
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
|
|
9.15 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
9.17 miles
|
CyrusOne: NVA9 Bldg-1A
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
9.17 miles
|
CyrusOne: NVA9 Bldg-2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
9.17 miles
|
CyrusOne Sterling VIII
|
|
|
9.19 miles
|
Yondr: Arcola Bldg 1
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
9.20 miles
|
Digital Realty: IAD45
|
This facility is part of the Digital Dulles Campus in Sterling, VA.
|
|
9.22 miles
|
Valley AlphaInterested in this information?Contact us
|
|
|
9.22 miles
|
Point AlphaInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
9.23 miles
|
Center TwoInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
9.24 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
9.26 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
9.26 miles
|
Center OneInterested in this information?Contact us
|
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
|
9.26 miles
|
Vantage: VA22
|
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
9.26 miles
|
Yondr: Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
9.27 miles
|
Cloud PlazaInterested in this information?Contact us
|
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
|
|
9.28 miles
|
Central RidgeInterested in this information?Contact us
|
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
9.29 miles
|
TowerInterested in this information?Contact us
|
|
|
9.30 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
9.30 miles
|
Vantage: VA21
|
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
|
|
9.30 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
9.32 miles
|
ProInterested in this information?Contact us
|
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
9.33 miles
|
CenterInterested in this information?Contact us
|
|
|
9.33 miles
|
PrimeInterested in this information?Contact us
|
|
|
9.36 miles
|
UltraInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
9.36 miles
|
Cloud PointInterested in this information?Contact us
|
|
|
9.36 miles
|
Point GammaInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
9.36 miles
|
Vantage: VA23
|
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
9.37 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
9.38 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
9.39 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
9.39 miles
|
Center MaxInterested in this information?Contact us
|
|
|
9.39 miles
|
CampusInterested in this information?Contact us
|
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
9.46 miles
|
ProInterested in this information?Contact us
|
|
|
9.46 miles
|
Campus TwoInterested in this information?Contact us
|
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
9.46 miles
|
Tower GammaInterested in this information?Contact us
|
|
|
9.46 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
9.48 miles
|
Center TwoInterested in this information?Contact us
|
|
|
9.52 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
9.54 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
9.55 miles
|
ThreeInterested in this information?Contact us
|
|
|
9.56 miles
|
Point PlusInterested in this information?Contact us
|
|
|
9.60 miles
|
Global CenterInterested in this information?Contact us
|
|
|
9.61 miles
|
Prime StationInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
|
|
9.64 miles
|
Valley GammaInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
|
|
9.69 miles
|
PowerHouse: Arcola Bldg B
|
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
9.71 miles
|
PowerHouse: Arcola Bldg A
|
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
9.79 miles
|
Kyndryl: Sterling
|
|
|
9.86 miles
|
Prime CampusInterested in this information?Contact us
|
|
|
9.89 miles
|
Ridge BetaInterested in this information?Contact us
|
|
|
9.93 miles
|
Metro ValleyInterested in this information?Contact us
|
|
|
10.07 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
10.09 miles
|
Connect Data Centers: Sterling, VA
|
|
|
10.15 miles
|
Centersquare: IAD2-B
|
|
|
10.16 miles
|
PlazaInterested in this information?Contact us
|
|
|
10.17 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
10.22 miles
|
Prime PlazaInterested in this information?Contact us
|
|
|
10.30 miles
|
Prime PointInterested in this information?Contact us
|
|
|
10.43 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
10.46 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
10.47 miles
|
PlazaInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
10.53 miles
|
West ValleyInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
10.54 miles
|
ParkInterested in this information?Contact us
|
|
|
10.55 miles
|
Station PlusInterested in this information?Contact us
|
|
|
10.55 miles
|
Center ProInterested in this information?Contact us
|
|
|
10.60 miles
|
Global TowerInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
10.64 miles
|
Center MaxInterested in this information?Contact us
|
|
|
10.88 miles
|
Atmosphere: Dickerson, Maryland
|
|
|
11.84 miles
|
Campus TwoInterested in this information?Contact us
|
|
|
11.91 miles
|
Center PrimeInterested in this information?Contact us
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
|
11.91 miles
|
MaxInterested in this information?Contact us
|
|
|
11.95 miles
|
Central ParkInterested in this information?Contact us
|
|
|
11.99 miles
|
ThreeInterested in this information?Contact us
|
|
|
12.01 miles
|
North PointInterested in this information?Contact us
|
|
|
12.03 miles
|
Station TwoInterested in this information?Contact us
|
|
|
12.04 miles
|
Valley PlusInterested in this information?Contact us
|
|
|
12.17 miles
|
Plaza PrimeInterested in this information?Contact us
|
|
|
12.17 miles
|
GlobalInterested in this information?Contact us
|
|
|
12.21 miles
|
Core ParkInterested in this information?Contact us
|
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
|
|
12.22 miles
|
Campus AlphaInterested in this information?Contact us
|
|
|
12.34 miles
|
AlphaInterested in this information?Contact us
|
|
|
12.36 miles
|
East ParkInterested in this information?Contact us
|
|
|
12.48 miles
|
Campus UltraInterested in this information?Contact us
|
|
|
12.48 miles
|
MetroInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
12.60 miles
|
Tower OneInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
12.60 miles
|
SouthInterested in this information?Contact us
|
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
|
|
12.63 miles
|
North ValleyInterested in this information?Contact us
|
|
|
12.68 miles
|
NorthInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
12.71 miles
|
Lumen Herndon 1
|
|
|
12.72 miles
|
Center ProInterested in this information?Contact us
|
|
|
12.73 miles
|
Lumen Herndon 3
|
|
|
12.79 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
12.91 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
12.91 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
13.05 miles
|
H5: Herndon
|
|
|
13.07 miles
|
Equinix Herndon DC97
|
|
|
13.12 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
13.12 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
13.21 miles
|
Starwood: Stonecroft Blvd, Chantilly
|
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
|
|
13.24 miles
|
Center ProInterested in this information?Contact us
|
|
|
13.31 miles
|
Edge StationInterested in this information?Contact us
|
|
|
13.31 miles
|
BetaInterested in this information?Contact us
|
|
|
13.38 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
13.40 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
13.42 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
|
|
13.46 miles
|
Park BetaInterested in this information?Contact us
|
|
|
13.62 miles
|
CenterInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
13.69 miles
|
Global CenterInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
13.80 miles
|
Dulles South Innovation Center
|
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
|
|
13.89 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
13.97 miles
|
Ridge UltraInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
14.04 miles
|
Prime RidgeInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
14.07 miles
|
CoreSite: VA2
|
|
|
14.07 miles
|
Hub ProInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
14.09 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
14.09 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
15.40 miles
|
Parkstone Tech Park
|
|
|
15.49 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
15.66 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
15.77 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
16.22 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
17.13 miles
|
Rowan: Frederick 1A
|
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland.
|
|
17.14 miles
|
PlusInterested in this information?Contact us
|
Amazon Web Services (AWS) is set to significantly expand its data center operations by establishing a new presence in Frederick, Maryland.
|
|
17.24 miles
|
ValleyInterested in this information?Contact us
|
This facility will be part of Amazon's BWI-150 campus in Maryland.
|
|
17.26 miles
|
Rowan: Frederick 1C
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
|
17.32 miles
|
Prime CampusInterested in this information?Contact us
|
This facility will be part of Amazon's BWI- 150 campus in Maryland.
|
|
17.33 miles
|
Rowan: Frederick 2C
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
|
17.34 miles
|
Rowan: Frederick 1B
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
|
17.34 miles
|
Rowan: Frederick 2D
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
|
17.44 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
17.47 miles
|
Point OneInterested in this information?Contact us
|
This facility will be part of Amazon's BWI-150 campus in Maryland.
|
|
17.48 miles
|
Rowan: Frederick 2B
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
|
17.49 miles
|
Rowan: Frederick 1D
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
|
17.56 miles
|
Rowan: Frederick 2A
|
Bauxite II will span 822,620 sq ft (76,400 sqm) on a 111.5-acre site, comprising four data center buildings.
|
|
17.84 miles
|
Rowan: Frederick 3C
|
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
|
|
17.92 miles
|
Rowan: Frederick 3A
|
Bauxite III will span 591,913 sq ft (54,990 sqm) across a 55-acre site, comprising three data center buildings.
|
|
18.00 miles
|
Rowan: Frederick 3B
|
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
|
|
18.08 miles
|
Aligned: IAD04 Bldg1
|
The company withdrew in 2023 when Maryland restricted diesel generator usage. However, following regulatory changes, Aligned recommitted to the project in 2024.
|
|
18.16 miles
|
Aligned: IAD04 Bldg2
|
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
|
18.17 miles
|
Aligned: IAD06
|
Aligned is developing IAD-06 as part of its Frederick campus within Quantum Frederick Park, expanding hyperscale data center infrastructure on a former industrial redevelopment site in Maryland.
|
|
18.22 miles
|
Aligned: IAD04 Bldg3
|
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
|
18.31 miles
|
Aligned: IAD04 Bldg4
|
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
|
18.33 miles
|
TPG Real Estate: Frederick Campus
|
The Quantum Frederick Project, a 2,100-acre data center campus and fiber optic loop (QLoop) in Frederick County, Maryland, was first announced by TPG Real Estate and Quantum Loophole in 2021.
|
|
18.92 miles
|
East StationInterested in this information?Contact us
|
|
|
18.98 miles
|
WestInterested in this information?Contact us
|
|
|
18.99 miles
|
East StationInterested in this information?Contact us
|
|
|
19.05 miles
|
Global CenterInterested in this information?Contact us
|
|
|
19.35 miles
|
Corscale: Gainesville 1
|
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
|
19.37 miles
|
CorScale: Gainesville 5
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
19.37 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
19.43 miles
|
John Marshall Commons Tech Park
|
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
|
19.44 miles
|
CorScale: Gainesville 4
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
19.49 miles
|
Equinix Manassas DC14
|
|
|
19.52 miles
|
CorScale: Gainesville 2
|
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
|
19.52 miles
|
NTT: VA13
|
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
19.53 miles
|
CenterInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
19.57 miles
|
CorScale: Gainesville 3
|
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
|
19.58 miles
|
NTT: VA12
|
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
19.60 miles
|
GlobalInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
19.62 miles
|
NTT: VA11
|
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
19.63 miles
|
Prime CampusInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
19.65 miles
|
South CenterInterested in this information?Contact us
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
|
19.65 miles
|
Tower BetaInterested in this information?Contact us
|
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
|
|
19.66 miles
|
NTT: VA10
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
19.68 miles
|
Central PointInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
19.71 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
19.73 miles
|
Park BetaInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
19.84 miles
|
HubInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
19.89 miles
|
Gardner Property Project
|
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
|
19.93 miles
|
PrimeInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
19.93 miles
|
GlobalInterested in this information?Contact us
|
Second of two planned one-story Microsoft data center buildings on the Wellington MNZ07 campus near Gainesville, Virginia.
|
|
19.97 miles
|
PrimeInterested in this information?Contact us
|
First of two planned one-story Microsoft data center buildings on the Wellington MNZ07 campus near Gainesville, Virginia, on the former Atlantic Research plant site.
|