Mapletree: 5000 South Bowen

Latest Podcast
5000 S Bowen Rd
Operational
Fully operational facility
Operated by:

Mapletree: 5000 South Bowen

Year Built: 2013
Ownership: Mapletree Redwood Data Centre Trust owns the building.
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Map and Nearby Locations:

5000 S Bowen Rd
Mapletree Redwood Data Centre Trust Sites
Nearby Facilities

Sites within 15 miles of Mapletree: 5000 South Bowen

Distance Site About
6.67 miles Black Mountain: Fort Worth, TX
Black Mountain has filed to rezone 141 acres at the intersection of Lon Stephenson Road and Forest Hill Drive to develop a data center.
9.25 miles 5CDC: Dallas DFW01
The facility encompasses eight data halls (PODs) optimized to accommodate average densities of over 400W per square foot.
9.30 miles Aligned: DFW-03
Aligned Data Centers is constructing a large data center building on 44 acres on the west side of North Star Road. The two-story building with external generators will total more than 429,603 square feet. A new electrical substation is also planned on the site.
9.78 miles Novartis
11.39 miles Lumen Fort Worth 1
11.51 miles Lumen Fort Worth 2
11.87 miles LOGIX Fort Worth
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
11.94 miles Lumen For Worth 3
13.16 miles Centersquare: Fort Worth DFW1
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
14.07 miles PowerHouse: Grand Prairie Campus
The campus will ultimately comprise 14 buildings across four development stages.
15.66 miles Hyperscale Data Center Request Dataset
Microsoft plans to build four data centers, with Irving City Council approving separate tax incentives for each facility.
16.30 miles Hyperscale Data Center Request Dataset
Google's Midlothian data center campus is situated in Midlothian, Texas, along Railport Parkway. The first building is a 2 story facility with 282,000 ft sq ft of space..
16.38 miles Hyperscale Data Center Request Dataset
Google’s $880M, 288,000 sq ft Sharka Building 5 at its Midlothian campus (3441 Railport Pkwy), a fifth facility under construction in 2026–2027 as part of its North Texas expansion.
16.41 miles Hyperscale Data Center Request Dataset
Google's Midlothian data center campus is situated in Midlothian, Texas, along Railport Parkway. The second building is a two story facility with 282,000 sqft of space.
16.58 miles Hyperscale Data Center Request Dataset
Phase 3 of Google's Midlothian data center campus features a 288,600-square-foot Data Center, two 14,000-square-foot Modular Electric Buildings, Generators, and a Substation.
16.70 miles Logistic Land Investments: Venus, TX
Logistics Land Investments LLC. has filed plans to construct a data center on an approximately 216.97-acre property in Venus, Texas.
16.73 miles Hyperscale Data Center Request Dataset
Google has commenced Phase 4 construction at its Midlothian data center campus along Railport Parkway.
16.84 miles Rock Creek Expansion
16.84 miles Rock Creek Data Center Project
The proposed data center, known as the Rock Creek Data Center Project, is a large-scale commercial development planned for a 121-acre tract at 10375 Old Granbury Road in Fort Worth.
17.08 miles Edged Energy: DFW01-2
This facility will be a part of Edged Energy's Dallas Campus in Texas.
17.25 miles Edged Energy: Dallas, Tx
In January 2025, Edged Energy launched its data center in Irving, Texas..
17.35 miles Hyperscale Data Center Request Dataset
Amazon Web Services (AWS) operates a 30,000 square foot (2,790 sq m) data center located in DeSoto, outside Dallas, Texas.
17.87 miles Carrier-Neutral Data Center Request Dataset
Stream Data Centers is planning a data center in Midlothian, Texas.
18.00 miles Equinix Dallas DA9
Equinix acquired DA9 in Irving as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DFW1.
18.36 miles Rackspace Grapevine DFW1
18.61 miles QTS: Irving DC4
QTS Data Centers is building the Irving DC4 facility at 3 Longhorn Drive, Irving, TX.
18.69 miles QTS Irving DC3
The QTS Irving 1 DC3 facility will provide our customers with an on-site substation and diverse campus fiber entrances with a redundant campus conduit system.
18.74 miles QTS Irving
In 2013 QTS acquired the former Maxim semiconductor plant. It was QTS's first data center in the Dallas market
18.79 miles QTS: Irving DC5
QTS Irving DC5 is located in the Irving area of Dallas, Texas.
18.84 miles QTS: Irving DC6
QTS Irving DC6 is located in the Irving area of Dallas, Texas.
19.21 miles Lumen Dallas 6
19.24 miles Lumen Dallas 1
19.36 miles CoreSpace Dallas
19.41 miles Edged Energy: DFW02 Expansion
19.48 miles DataBank DFW4 Empire Central
The site was acquired by Zayo in January 2016 from Stream Datacenters.
19.64 miles Edged Energy: Ft. Worth DFW02
Edged Energy intends to construct another data center campus in Fort Worth, with operations expected to begin in Q2 2027.
19.69 miles PowerHouse: Irving, TX
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
19.69 miles 8435 Stemmons - Digital Realty
19.72 miles PowerHouse: Irving DC2
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
19.76 miles PowerHouse: Irving DC3
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
19.77 miles TierPoint Dallas (Colo4)
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
19.80 miles HostPapa DFW1
19.82 miles Contegix Dallas
19.82 miles QuadraNet Dallas
19.82 miles Verizon: 1300 W Mockingbird
Former XO facility
19.83 miles Prime: DFW01-02
Prime Data Centers is planning to develop a three-story, 96,800 sq ft (8,995 sqm) data center at 1455 Round Table Drive in Dallas County.
19.86 miles Prime: Dallas DFW04-01
Prime Data Centers is building a $1.6 billion campus near Benbrook. The project includes three, two-story structures being built near Aledo and Chapin School roads. The site is slated for completion by 2026.
19.87 miles Evocative DA4
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
19.89 miles Fiberhub DFW1
19.89 miles Prime: Dallas DFW01
In April 2023, Prime Data Centers discreetly added Dallas to its list of data center locations. The company now has a presence at 1515 Round Table Drive in Dallas, offering 6MW of capacity across a 106,865 square foot (9,930 square meter) facility.
20.00 miles Prime: DFW04-02
Prime Data Centers is building a $1.6 billion campus near Benbrook. The project includes three, two-story structures being built near Aledo and Chapin School roads. The site is slated for completion by January 2026.
20.00 miles Prime: DFW04-03
Prime Data Centers is building a $1.6 billion campus near Benbrook. The project includes three, two-story structures being built near Aledo and Chapin School roads. The site is slated for completion by January 2026.

Mapletree: 5000 South Bowen Data Center Photos (See all)

Operating Company

Operated by:
23
Facilities
4
Markets
131MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?