Cogent: Fort Worth

Latest Podcast 1400 E Presidio St
Operational
Fully operational facility
Operated by:

Cogent: Fort Worth

Year Built: 1990
Utility Provider: Oncor
Ownership: Cogent Communications owns the building.
Lot Size: 3 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Sprint built this switching center on East Presidio Street, on the eastern edge of downtown Fort Worth, in 1990. Cogent Communications took it over when it bought Sprint's wireline business from T-Mobile in 2023. Cogent markets it as a carrier-neutral data center of about 110,000 sq ft with UPS and backup generators, and offers it for sale or wholesale colocation.

Site History

  • 2025: Cogent offers the building for sale or wholesale lease.
  • May 2023: Cogent buys Sprint's wireline business, including this building.
  • 1990: Sprint builds the switching center.

Map and Nearby Locations

1400 E Presidio St
Cogent Communications Sites
Nearby Facilities

Cogent: Fort Worth Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cogent: Fort Worth

Distance Site About
0.62 miles Lumen Fort Worth 1
Lumen Fort Worth 1 is a Lumen network colocation site at 1601 Jones Street in downtown Fort Worth.
0.86 miles Lumen Fort Worth 2
Lumen Fort Worth 2 is a Lumen network building at 1101 East 9th Street in Fort Worth, built in 1998 for IXC Communications.
0.96 miles AT&T: Fort Worth Edison
AT&T's Edison building on Houston Street is the main telephone exchange in downtown Fort Worth, a multi-story Southwestern Bell building from 1971 that also hosts AT&T cloud equipment.
1.11 miles LOGIX Fort Worth
LOGIX Fiber Networks ran a small colocation suite in the Oil & Gas Building on West 7th Street in downtown Fort Worth, which it stopped marketing in 2024.
1.17 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.20 miles Lumen For Worth 3
Lumen Fort Worth 3 is a Lumen network site in a 1925 office tower at 515 Houston Street in downtown Fort Worth.
1.21 miles Plaza ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.27 miles UT System: Arlington Regional Data Center
The University of Texas System runs its Arlington Regional Data Center on East Loop 820 in east Fort Worth as a shared colocation facility for its campuses.
6.41 miles HCA: Fort Worth Data Center
HCA Healthcare runs a regional data center for its Texas hospitals in a single-story building in the Overton Centre office park in southwest Fort Worth.
6.46 miles Alcon: Fort Worth Data Center
Alcon runs its own data center on its US headquarters campus on South Freeway in Fort Worth, Texas.
7.49 miles 5CDC: Dallas DFW01
5C Data Centers proposed converting a distribution warehouse on John Burgess Drive in southeast Fort Worth into a high-density data center; no conversion work has started.
7.58 miles Black Mountain: Fort Worth, TX
Black Mountain Power plans a four-building data center campus with an on-site substation on about 430 acres in southeast Fort Worth, next to Forest Hill; the city approved its site plan in August 2026.
8.09 miles Provident: North Richland Hills
Provident Data Centers has proposed a two-story data center on the former Santander operations center site on Rufe Snow Drive in North Richland Hills.
8.26 miles BNSF: Fort Worth Data Center
BNSF Railway runs a company data center on its headquarters campus in north Fort Worth.
8.35 miles D.R. Horton: Fort Worth Data Center
D.R. Horton runs a company data center in its division office campus on North Freeway in north Fort Worth.
10.74 miles Edge ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.75 miles Edged Energy: Ft. Worth DFW02
Edged's DFW02-1 is the first building of its two-building DFW02 campus at I-20 and Chapin School Road in Fort Worth's Veale Ranch area, under construction since 2026.
10.77 miles Mapletree: 5000 South Bowen
Mapletree Industrial Trust owns a former Atos data center on South Bowen Road in Arlington, Texas, which has stood empty since Atos's lease ended in 2023.
11.13 miles Edged Energy: DFW02 Expansion
Edged's DFW02-2 is the second building of its DFW02 campus at I-20 and Chapin School Road in Fort Worth's Veale Ranch area.
11.35 miles Prime: DFW04-03
Prime Data Centers planned DFW04-03 as building 3 of three two-story data centers near Aledo Road and Chapin School Road, west of Fort Worth.
11.40 miles Prime: DFW04-02
Prime Data Centers planned DFW04-02 as building 2 of three two-story data centers near Aledo Road and Chapin School Road, west of Fort Worth.
11.43 miles Prime: DFW04-01
Prime Data Centers planned DFW04-01 as building 1 of three two-story data centers near Aledo Road and Chapin School Road, west of Fort Worth.
11.55 miles CyrusOne: DFW7
DFW7 is the first building on CyrusOne's Fort Worth campus on Asphalt Drive, on land bought from energy developer Eolian beside its Chisholm Grid battery plant.
11.66 miles CyrusOne: DFW8
DFW8 is the second building under way on CyrusOne's Fort Worth campus on Asphalt Drive, beside DFW7.
11.79 miles CyrusOne: Fort Worth Expansion
Later phases of CyrusOne's Fort Worth campus on Asphalt Drive, planned with energy developer Eolian beyond the DFW7 and DFW8 buildings.
12.06 miles Coravel: Hicks Field DFW12
Coravel's Hicks Field DFW12 is a planned two-story data center on its hyperscale campus on Hicks Field Road in far north Fort Worth.
12.07 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.14 miles Coravel: Hicks Field Expansion
Coravel's Hicks Field Expansion covers the last two of five planned buildings on its hyperscale campus on Hicks Field Road in far north Fort Worth.
12.19 miles Coravel: Hicks Field DFW13
Coravel's Hicks Field DFW13 is a planned two-story data center on its hyperscale campus on Hicks Field Road in far north Fort Worth.
12.20 miles Central TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.33 miles Rock Creek Expansion
Rock Creek Expansion covers buildings 2 through 5 of the planned Rock Creek data center campus in southwest Fort Worth.
12.39 miles Coravel: Hicks Field DFW11
Coravel's Hicks Field DFW11 is the first building of its hyperscale data center campus on Hicks Field Road in far north Fort Worth, under construction for a hyperscale tenant.
12.39 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.55 miles Rock Creek 1
Rock Creek 1 is the first of five data center buildings planned on land Walton Global holds east of Chisholm Trail Parkway in southwest Fort Worth.
13.14 miles D.R. Horton: Arlington Data Center
D.R. Horton built its own data center next to its headquarters area in Arlington, Texas, completed in 2022.
15.69 miles Verizon: Arlington Data Center
Verizon Business runs a network data center in the former MCI WorldCom building on 113th Street in Arlington's Great Southwest Industrial District.
15.96 miles Verizon: Euless Switching Center
Verizon Wireless's Euless switching center is a windowless network building on Bear Creek Parkway near DFW Airport, opened in 2021, that also hosts Amazon Web Services equipment.
16.41 miles PowerHouse: Circle T Campus
PowerHouse Data Centers plans a four-building data center campus on about 88 acres of Hillwood's Circle T Ranch in Westlake, north of Fort Worth.
16.64 miles Tierpoint Fort Worth
TierPoint's Dallas-Fort Worth data center occupies the former Alliance Gateway / AIG facility on Independence Parkway in north Fort Worth. The site is built for high-density AI and HPC workloads, with direct-to-chip liquid cooling in production alongside air and chilled-water cooling. TierPoint is expanding the utility supply to the site and has room for further phases along the existing building line.
16.71 miles STACK Fort Worth Alliance
STACK Infrastructure, Hillwood and IPI Partners announced a hyperscale data center campus at AllianceTexas in north Fort Worth in 2019, but STACK dropped it without building.
16.80 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.99 miles Centersquare: Fort Worth DFW1
Csquare's Fort Worth DFW1 is a colocation campus in the CentrePort business park near DFW Airport, built by Exodus around 2000 and owned by Csquare since 2025.
17.01 miles Voltage Park: Fort Worth (Csquare DFW1)
Voltage Park runs a GPU cloud deployment inside Csquare's DFW1 colocation campus at CentrePort in Fort Worth.
17.04 miles QTS: FTW1 Expansion
QTS is expanding its Fort Worth data center campus for the third time with a $300 million, 147,946-square-foot addition at 14100 Park Vista Boulevard.
17.10 miles QTS: FTW1-DC2
FTW1-DC2 is the second building on QTS's Fort Worth campus near AllianceTexas, a two-story, $220 million data center completed in 2026.
17.19 miles QTS: FTW1-DC1
FTW1-DC1 is the original building on QTS's Fort Worth campus near AllianceTexas, a former Health Care Service Corporation data center that QTS bought in 2017.
17.60 miles Colovore: Fort Worth DFW02
Colovore's second Dallas-market facility, a purpose-built liquid-cooled colocation building on Heritage Parkway in north Fort Worth. Four-hall design following Colovore's standard high-density spec-build template, with service dates running late 2027 through 2028.
17.66 miles Rackspace Grapevine DFW1
Rackspace ran its DFW1 data center in a Grapevine industrial building until late 2018, when it moved customers to its Richardson DFW3 facility.
18.25 miles Verizon: Southlake NEC Data Center
Verizon runs a network and data center campus on West Dove Road in Southlake, north of DFW Airport, where a 2022-approved data hall expansion has not been built.
18.55 miles Citigroup Fort Worth
Citigroup's South West Data Center is one of the bank's main US enterprise data centers, on Litsey Road in the AllianceTexas corridor north of Fort Worth.
19.36 miles Aligned: DFW-03
Aligned's DFW-03 is a two-story data center under construction on Britton Road in east Mansfield, south of Fort Worth.

Operating Company

Operated by:

Quick Facts:


  • Founded in 1999; publicly traded company (NASDAQ: CCOI).
  • Headquartered in Washington, DC.
  • Serves 190 markets in North America, Europe and Asia
  • Provides Internet access, Ethernet transport and colocation services.

Cogent Network


  • 2,125 On-Net buildings
    • 69% multi-tenant office buildings
    • 31% carrier neutral and Cogent data centers
  • 50 Cogent data centers with 550,000+ square feet
  • 610+ metro networks; 27,200+ metro fiber miles
  • 59,000+ intercity fiber route miles
  • Long-haul capacity up to 580 Gbps
  • Transatlantic capacity over 800 Gbps across multiple cables/routes Interconnected with 5,270+ different networks

Acquisition History

Although debuting at the height of the telecom industry, Cogent soon found vast market wealth eradicated and many other ISPs thrown into a state of turmoil. In a survival of the fittest competition, Cogent became the consolidator in a consolidating market. Over three brief years, Cogent completed 13 acquisitions of other flailing providers. Whether it was an entire company or just select assets, Cogent was able to acquire valuable network assets, customers, peering relationships and building access agreements for pennies on the dollar.

Among Cogent's 13 acquisitions to date include three of the original generation Internet Service Providers who were pioneers in the late 1980s and early 1990s. These companies—PSINet (originally Performance Systems International), NetRail and Aleron (originally AGIS/Net99)—were the earliest providers of commercial Internet service.

Other strategic acquisitions include assets from: Allied Riser, OnSite Access, Fiber City, Fiber Network Solutions, Applied Theory, LambdaNet France and Spain, Carrier1, Unlimited Fiber Optics, Global Access, Aleron, NTT/Verio.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read DataBank Raises $2bn for Dallas Data Center Buildout
DataBank Raises $2bn for Dallas Data Center Buildout

DataBank Raises $2bn for Dallas Data Center Buildout

April 22, 2026 Dallas

US data center firm DataBank has secured new financing to support the build-out of three data centers in Dallas, Texas. The company this week announced it has obtained a $2 billion loan to fund construction of the first three facilities at its new Red Oak campus. DataBank said the deal represents...

Read more
Read Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park
Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

June 18, 2025 Dallas

Cawley Partners has acquired 5,200 acres south of Dallas to potentially develop a large data center park outside Dallas. The acquired South Creek Ranch in the City of Ferris is set to see a mix of uses, including data centers, logistics, manufacturing, and residential. “This particular piece of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.