Prime: DFW02-01

Latest Podcast 2000 Holford Rd
Planned
Future facility in planning stage
Operated by:

Prime: DFW02-01

Short Code: DFW02-01
Year Planned: 2028
Utility Provider: Garland Power & Light

DFW02-01 is building 1 of 3 on Prime Data Centers' planned Garland campus, at the northeast corner of Arapaho Road and Holford Road. Garland zoned the site for a data center and electric substations in 2023. A 2024 expansion of the zoning moved the buildings south, away from the Spring Creek Forest Preserve. A 138 kV switching station on Holford Road was bid in 2024 to serve the campus. Construction has not started.

Site History

  • December 2024: Garland's Plan Commission approves an expansion of the site's zoning, 9-0.
  • 2024: Prime announces three two-story buildings for the site.
  • 2023: Garland zones the site as a planned development for a data center.

Map and Nearby Locations

2000 Holford Rd
Prime Data Centers Sites
Nearby Facilities

Prime: DFW02-01 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Prime: DFW02-01

Distance Site
0.09 miles Prime: DFW02-03
0.20 miles Prime: DFW02-02
1.03 miles Digital Realty: DFW39
1.03 miles Wells Fargo: Garland (Digital Realty DFW39)
1.16 miles Digital Realty: DFW37
1.20 miles Digital Realty: DFW45
1.28 miles Digital Realty: DFW40
1.36 miles NTT: TX4
1.44 miles NTT TX2
1.45 miles NTT: TX3
1.45 miles NTT: TX1
1.62 miles Stream: DFWA1
2.04 miles EdgeCore Dallas
2.09 miles BoA: Richardson USTX01
2.78 miles Mapletree: 3300 Essex
2.91 miles CyrusOne: Dallas DFW6
2.92 miles CoreWeave: Richardson (CyrusOne DFW6)
2.97 miles State Farm: Richardson (DigiCo DAL1)
2.98 miles DigiCo: Dallas DAL1
3.03 miles Verizon Dallas (Richardson)
3.05 miles Cisco Richardson TXDC1
3.16 miles Aligned: DFW-04
3.17 miles Digital Realty: DFW20
3.17 miles Lambda: Plano (Aligned DFW-04)
3.19 miles Charles Schwab: Richardson DC5
3.19 miles Digital Realty: DFW35
3.20 miles 365 Richardson, TX
3.22 miles Digital Realty: DFW29
3.26 miles Digital Realty: DFW21
3.27 miles DataBank North Dallas DFW2
3.28 miles BoA: Richardson USTX02
3.28 miles Flexential Dallas (Plano)
3.29 miles AT&T Switching Station (Richardson)
3.30 miles CoreWeave: Plano (Flexential)
3.33 miles Digital Realty: DFW18
3.37 miles Digital Realty: DFW17
3.38 miles Digital Realty: DFW28
3.43 miles Digital Realty: 1201 N Bowser
3.50 miles Rackspace Richardson DFW3
3.51 miles Digital Realty: DFW25
3.51 miles Equinix Dallas DA10
3.52 miles Digital Realty: DFW42
3.53 miles Digital Realty: DFW16
3.58 miles Aligned: DFW-02
3.60 miles Evocative: DAL1
3.60 miles Aligned: DFW-01
3.82 miles Fortinet Plano
3.84 miles OneSource Cloud: Richardson
3.94 miles Global IP Networks - Plano
4.34 miles Cogent: Plano Edge
4.37 miles Provident: Garland
5.74 miles Skybox: Atlantic Station
5.82 miles NTT 2300 W Plano
6.11 miles Flexential Dallas (Synergy Park)
6.56 miles Lincoln: Plano DFW5
7.37 miles CoreWeave Plano
7.41 miles Lincoln Rackhouse: 1000 Coit
7.50 miles H5 Colo
7.58 miles Evocative: Dallas DAL6
7.60 miles Mapletree: 1221 Coit
8.29 miles DataBank DFW7 LBJ
9.44 miles Centersquare: Allen DFW2
9.45 miles Voltage Park: Allen (Centersquare DFW2)
9.51 miles AT&T: Allen Data Center
10.16 miles Aphorio Carter: Farmers Branch, TX
10.27 miles TRG Datacenters: Dallas DFW1
10.49 miles Atmos Energy: Dallas Data Center
10.54 miles M&A Technology: Alpha Data Center
10.56 miles Edge Node: Farmers Branch
11.02 miles M&A Technology: ServerPhase
11.34 miles SMU: Data Center
11.53 miles Stack: DFW01A
11.55 miles Equinix Dallas DA7
11.55 miles Digital Realty: DFW12
11.57 miles VAZATA Horizon Dallas (DAL II)
11.57 miles JPMorgan Chase: Carrollton Data Center
11.61 miles Stack: DFW01B
11.65 miles DXC: Plano Data Center
11.70 miles Stack: DFW01C
11.75 miles VAZATA Dallas (DAL I & III)
11.77 miles Digital Realty: DFW11
12.14 miles Cisco Allen
12.27 miles Tierpoint Dallas-Allen
12.27 miles Compass: Allen II
12.28 miles Compass Allen I
12.29 miles DataCanopy: Allen, TX
12.31 miles South StationInterested in this information?Contact us
12.33 miles CyrusOne Allen DFW3
12.46 miles CyrusOne Allen DFW4
12.47 miles West TowerInterested in this information?Contact us
12.65 miles CyrusOne: Allen DFW5
12.76 miles Resilience DFW
12.76 miles DataBank: DFW8
12.77 miles DataBank: DFW3
12.91 miles Centersquare: Dallas DFW3
13.23 miles Flō Networks: Dallas XCN (4316 Bryan)
13.30 miles AT&T: Dallas Tandem (4211 Bryan)
13.37 miles AT&T: Dallas Toll Building
14.05 miles Colovore: Mesquite DFW01
14.41 miles Equinix Dallas DA4
14.42 miles Digital Realty: DFW10
14.42 miles Earthlink Dallas
14.42 miles LOGIX Dallas (2323 Bryan)
14.52 miles Flexential Dallas Infomart I-V
14.53 miles Cologix: DAL2
14.55 miles Cologix: DAL3
14.55 miles Equinix Dallas DA11
14.56 miles Cologix: DAL1
14.56 miles Lumen Dallas 2
14.57 miles BoA: Dallas Infomart
14.58 miles Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
14.59 miles DataBank DFW5
14.61 miles Sprocket DAL1
14.62 miles Southwest Airlines: Dallas Data Center
14.63 miles Provision Data Services
14.63 miles Global IP Networks: Dallas
14.68 miles DataCanopy Dallas
14.79 miles DataBank DFW6 Love Field
14.88 miles CleanArc: Dallas Campus
14.93 miles Carrier-Neutral Data CenterInterested in this information?Contact us
15.06 miles Lumen Dallas 3
15.06 miles Opus Interactive Dallas
15.06 miles Cogent: 400 S Akard
15.07 miles DataBank Downtown Dallas DFW1
15.07 miles Sprocket DAL2
15.07 miles Lumen Dallas 4
15.17 miles Evocative: McKinney DA2
15.18 miles Experian: McKinney (Evocative DA2)
15.23 miles Equinix: Dallas DA12
15.42 miles Hivelocity: Dallas DAL1
15.43 miles Cogent: Dallas 2
15.43 miles Fiberhub DFW1
15.45 miles Prime: DFW01-01
15.47 miles Evocative DA4
15.49 miles Kyndryl: Dallas (1000 Belleview)
15.51 miles Prime: DFW01-02
15.56 miles Verizon: 1300 W Mockingbird
15.64 miles Digital Realty: DFW36
15.66 miles ExxonMobil: Dallas Data Center
15.72 miles QuadraNet Dallas
15.73 miles Contegix Dallas
15.74 miles HostPapa DFW1
15.76 miles TierPoint Dallas (Colo4)
15.86 miles DataBank DFW4 Empire Central
16.01 miles CoreSpace Dallas
16.08 miles CyrusOne Carrollton
16.12 miles Lumen Dallas 6
16.13 miles DataCanopy: Carrollton, TX
16.16 miles Wowrack: DAL01
16.28 miles Lumen Dallas 1
16.54 miles AIB Data Centers: Collin County, TX
16.87 miles KDC: Irving (University of Dallas)
16.92 miles CoreSite: Irving DA1
17.09 miles Cogent: Irving
17.17 miles PowerHouse: Irving Bldg-A
17.18 miles PowerHouse: Irving Bldg-B
17.27 miles PowerHouse: Irving Bldg-C
17.41 miles Equinix Dallas DA9
18.15 miles Edged Energy: DFW01-1
18.19 miles Teleperformance: McKinney Data Bunker
18.24 miles VAZATA: McKinney
18.27 miles Edged Energy: DFW01-2
19.32 miles StationInterested in this information?Contact us
19.32 miles South StationInterested in this information?Contact us
19.33 miles QTS: Irving DC5
19.33 miles QTS: Irving DC6
19.42 miles QTS Irving DC3
19.42 miles QTS: Irving DC4
19.43 miles RidgeInterested in this information?Contact us
19.44 miles South TowerInterested in this information?Contact us
19.48 miles QTS Irving DC1
19.71 miles Real Estate Data CenterInterested in this information?Contact us
19.84 miles Cloudnium: Irving
19.95 miles DTCC: Coppell
19.96 miles CyrusOne: Lewisville DFW2
19.97 miles Lightedge: Dallas (Lewisville)

Prime: DFW02-01 Data Center Photos See all

Rendering of Prime's LAX-01 facility
Source: Prime DC

Operating Company

Operated by:

Prime Data Centers develops, acquires, and operates data centers for large enterprises and hyper-scalers. Through our own properties, customer assets (sale-leaseback), or greenfield developments, Prime delivers build-to-suit, powered-shell and turn-key solutions.

0
Facilities
0
Markets

News See all

Read Giga Energy Signs $1B, 10-Year Lease for 60MW Hunt County Data Center
Giga Energy has signed a 10-year lease worth about $1 billion at its Project Clay data center in Hunt County, Texas. The agreement, [announced](https://www.gigaenergy.com/news/giga-news-hunt-county...

Giga Energy Signs $1B, 10-Year Lease for 60MW Hunt County Data Center

November 18, 2026 Giga Energy

Giga Energy has signed a 10-year lease worth about $1 billion at its Project Clay data center in Hunt County, Texas. The agreement, announced on November 17, covers 60MW of capacity for an undisclosed U.S.-based AI cloud provider. Giga Energy develops, owns, and operates the campus, Reuters...

Read more
Read Equinix Affiliate Files for $500M DA13 Data Center in Dallas
An affiliate of [Equinix](https://baxtel.com/data-centers/equinix) has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The applicati...

Equinix Affiliate Files for $500M DA13 Data Center in Dallas

November 16, 2026 Equinix

An affiliate of Equinix has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The application puts a four-story, 372,445-square-foot building at 1520 West Mockingbird Lane, in an industrial area near Love Field, as Data Center...

Read more
Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.