Edge Centres' Kuala Lumpur, Malaysia Edge Facility To Come online in July
June 30, 2022
Kuala Lumpur
Located in Morib, Selangor, Telekom Malaysia’s new 7,000 sq ft open cable landing station (CLS) serves as a strategic gateway along the Straits of Malacca. It is designed to host up to three submarine cable systems, including the high-capacity Sea-Me-We 6 (126 Tbps), and is part of a regional ecosystem where TM has scaled its supporting data center capacity to 40 MW.
| Distance | Site | About |
|---|---|---|
| 12.76 miles | Bridge DC: Banting Campus |
Bridge Data Centres (BDC), backed by Bain Capital, has acquired 136.1 acres in Banting’s IOI Industrial Park for RM740.68 million (~$158M).
|
| 17.31 miles | Hyperscale Data Center Request Dataset | |
| 17.42 miles | Hyperscale Data Center Request Dataset | |
| 17.52 miles | Equinix: KL2 |
The site is strategically located less than one kilometer from Equinix's KL1 data center, which began operations in May 2024.
|
| 17.62 miles | Pi Data Centre: Cyberjaya |
The development will span 7.3 acres, with Phase 1 construction scheduled to begin in the third quarter of 2024. The project is expected to be completed by the fourth quarter of 2025.
|
| 17.64 miles | Vantage Cyberjaya (KUL2) |
The KUL2 campus, spanning 35 acres, is distributed across 10 structures covering 2.76 million sq ft (256,000 sqm).
|
| 17.70 miles | Vantage: KUL12 |
In 2022, Vantage launched the second data center (KUL12) on its Cyberjaya CJ1 campus in Kuala Lumpur, Malaysia.
|
| 17.71 miles | Equinix Kuala Lumpur KL1 |
Equinix KL1 is located within Vantage KUL1 Data Center Campus.
|
| 17.71 miles | EdgeConneX: Cyberjaya |
The EdgeConneX data center campus in Cyberjaya (KUL2) will encompass nine buildings across 30 acres, offering the scalable capacity and power to accommodate a diverse range of customer needs in the future.
|
| 17.72 miles | Vantage: KUL14 |
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
|
| 17.74 miles | Vantage: KUL13 |
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
|
| 17.75 miles | Vantage Cyberjaya KUL11 |
Vantage's multi-story, four-data-center KUL1 campus is an 8-minute drive from the Central Business District via the Persiaran APEC and a 30-minute drive from Kuala Lumpur International Airport.
|
| 17.77 miles | Open DC CJ1 | |
| 17.77 miles | MyTelehaus Cyberjaya CJ1 Centre | |
| 17.79 miles | Basis Bay: Cyberjaya DC2 |
Basis Bay Cyberjaya DC.2 is a pioneering "Eco-Green Premium Data Centre" designed to meet the rigorous demands of the banking, financial services, and government sectors.
|
| 17.80 miles | STT Kuala Lumpur 1 |
STT Kuala Lumpur 1, is specifically designed for hyperscalers and is currently in the final stages of completion to meet the growing demand for global cloud and AI infrastructure.
|
| 17.81 miles | Bridge: MY02 Bldg4 | |
| 17.85 miles | Bridge: MY02 Bldg3 | |
| 17.88 miles | Basis Bay: Cyberjaya DC1 |
Operational since 2009, Basis Bay DC.1 is a purpose-built, carrier-neutral facility designed to Tier III/Rated-3 standards (with Tier IV-ready mechanical and electrical redundancies).
|
| 17.89 miles | Bridge: MY02 Bldg2 |
Bridge Data Centres (BDC) is expanding its footprint in Cyberjaya, Malaysia with the MY02 hyperscale data center project, adding substantial IT capacity across three phases.
|
| 17.95 miles | Hyperscale Data Center Request Dataset |
AWS is building its first Malaysian data center facility at Persiaran APEC, Cyberjaya, in Selangor. The first project will be built out in multiple phases and will be overseen by the Sepang Municipal council.
|
| 18.01 miles | Keppel Cyberjaya Basis Bay DC |
|
| 18.03 miles | Bridge Data Centres Cyberjaya MY02 |
|
| 18.09 miles | CSF Computer Exchange 5 (CX5) |
Developed in three phases over three years, CX5 was completed in 2015.
|
| 18.33 miles | TelcoHub X1 Cyberjaya | |
| 18.34 miles | CSF Computer Exchange 1 (CX1) |
The CX1 data center offers a network-dense environment and includes on-site deployment of the Malaysia Internet Exchange (MyIX).
|
| 18.46 miles | Infinaxis: Cyberjaya 1 |
Infinaxis Cyberjaya 1 is the company's first data center in Malaysia, located in Cyberjaya.
|
| 18.49 miles | Infinaxis: Cyberjaya 2 |
Infinaxis Cyberjaya 2 will be the company's second data center building of its Cyberjaya Campus.
|
| 18.66 miles | AIMS: Cyberjaya 2 |
DigitalBridge-owned AIMS has finalized a RM4 billion ($1.01 billion) investment to develop a new AI-ready data center in Cyberjaya, Malaysia.
|
| 18.71 miles | GDC SDN: Cyberjaya |
Global Data Centre Sdn. Bhd. (GDC), a subsidiary of Global Telecommunications Sdn. Bhd., is planning to build an AI-Driven Data Centre in Cyberjaya, Malaysia.
|
| 18.71 miles | Edgnex: Cyberjaya |
The company will invest RM250 million ($52.4 million) to develop the facility on a 1.21-hectare plot of land.
|
| 18.85 miles | Bridge Data Centres Cyberjaya MY01 |
|
| 18.88 miles | CSF Computer Exchange 2 (CX2) |
The 300,000+ square foot CX2 data center in Kuala Lumpur, Malaysia is the flagship facility for the CSF Group, which went public in 2010 with an IPO in London.
|
| 19.04 miles | NTT Cyberjaya CBJ5 |
Cyberjaya 5 Data Center is located in the Multimedia Super Corridor, just a 30-minute drive from central Kuala Lumpur, in Malaysia's premier IT hub.
|
| 19.06 miles | NTT Cyberjaya 4 |
In 2014, NTT added CBJ4 phase which has two buildings. The Global Solution Center and the CBJ4 DC.
|
| 19.08 miles | NTT Cyberjaya 3 |
In 2012 NTT added CBJ3 which consists of two buildings, a Technology Center and the CBJ3 Data Center.
|
| 19.10 miles | NTT Cyberjaya 6 |
|
| 19.11 miles | NTT Cyberjaya 2 |
NTT's Cyberjaya 2 (CBJ2) appears to have closed.
|
| 19.15 miles | NTT Cyberjaya 1 | |
| 19.17 miles | NTT Malaysia Cyberjaya (MSC) Campus | |
| 19.25 miles | Telekom Malaysia: KVDC 2 |
Telekom Malaysia has expanded its Cyberjaya Klang Valley Data Center (KVDC).
|
| 19.29 miles | Cyberjaya Klang Valley (KVDC) |
Telekom Malaysia is expanding two of its data centers. Cyberjaya Klang Valley Core Data Centre (KVDC) was opened in 2019.
|
| 19.48 miles | AIMS: CJ1 Block 2 |
In 2024, Malaysia’s AIMS completed a phase 2 expansion of its Cyberjaya campus and announced plans for a third phase expansion.
|
| 19.49 miles | AIMS: CJ1 Block 3 |
Malaysia’s AIM completed construction of Cyberjaya Block 3 in July 2025, ahead of schedule.
|
| 19.52 miles | AIMS Cyberjaya CJ1 |
AIMS Data Centre began constructing its Cyberjaya facility in the third quarter of 2020.
|
TM is the national connectivity and digital infrastructure provider and Malaysia’s leading integrated telco; offering a comprehensive suite of communication services and solutions in fixed (telephony and broadband), mobility, content, WiFi, ICT, Cloud and smart services. TM is driven by stakeholder value creation in a highly competitive environment and places, emphasis on delivering an enhanced customer experience via continuous customer service quality improvements and innovations, whilst focusing on increased operational efficiency and productivity.
June 30, 2022
Kuala Lumpur
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas