|
0.07 miles
|
AIMS Kuala Lumpur Menara
|
|
|
0.78 miles
|
HPC Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
0.78 miles
|
HPC Data CenterInterested in this information?Contact us
|
|
|
0.78 miles
|
HPC Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.17 miles
|
TM Brickfields Data Centre (BFDC)
|
|
|
2.68 miles
|
YTL: Sentul 1
|
YTL’s Sentul Data Center 1 is located in the heart of Kuala Lumpur.
|
|
3.79 miles
|
Safehouse: Wisma Mont’ Kiara
|
Launched in 2011, the 5,000 sq ft facility utilizes IBM's Scalable Modular Data Centre Solutions (SMDC) and incorporates technology from Schneider Electric and Juniper Networks.
|
|
3.96 miles
|
EdgeConneX: CBD Kuala Lumpur
|
EdgeConnex is building a 19,200 sqm data center with in the Central Business District in Malaysia.
|
|
5.04 miles
|
Strateq: Petaling Jaya
|
|
|
5.10 miles
|
MyTelehaus Kuala Lumpur P33 Centre
|
|
|
5.29 miles
|
Exitra: Kuala Lumpur
|
|
|
6.51 miles
|
NEXTDC: KL1 Petaling Jaya
|
Located in Petaling Jaya, KL1 Kuala Lumpur is NEXTDC's first international data centre, marking the company's expansion into Southeast Asia and strengthening Malaysia's position as a regional hub for AI, cloud and digital innovation.
|
|
6.57 miles
|
Exsim: Bukit Jalil
|
The EXSIM Hyperscale Data Center Project in Bukit Jalil, Malaysia, complies with Uptime Institute's Tier III/Tier IV standards.
|
|
7.14 miles
|
Bridge: MY03 DC4
|
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
|
|
7.18 miles
|
Bridge: MY03 DC3
|
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
|
|
7.19 miles
|
Bridge: MY03 DC1
|
Bridge DC announced plans for the first building at the MY03 Campus in 2021.
|
|
7.21 miles
|
Bridge: MY03 DC2
|
Phase One of the expansion was planned to be ready for service by Q3 2025.
|
|
7.31 miles
|
EdgeConneX: Bukit Jalil
|
EdgeConnex is building a 60,000 sqm data center in Bukit Jalil, Malaysia. The site will feature a 132 kV substation.
|
|
7.83 miles
|
TM KELANA JAYA DATA CENTRE (KJDC)
|
|
|
9.26 miles
|
EC31 Kuala Lumpur
|
|
|
9.60 miles
|
Basis Bay: Glenmarie DC2
|
|
|
9.96 miles
|
Basis Bay: Glenmarie DC1
|
Basis Bay's Glenmarie DC.1 (also referred to as Subang Hi-Tech DC.1) is one of the company's established, purpose-built facilities located in Shah Alam, Malaysia.
|
|
13.32 miles
|
ModernOne Kajang
|
|
|
13.74 miles
|
MetroInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.86 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.98 miles
|
AIMS: CJ1 Block 1
|
AIMS Data Centre began constructing its Cyberjaya facility in the third quarter of 2020.
|
|
15.01 miles
|
AIMS: CJ1 Block 2
|
In 2024, Malaysia’s AIMS completed a phase 2 expansion of its Cyberjaya campus and announced plans for a third phase expansion.
|
|
15.03 miles
|
AIMS: CJ1 Block 3
|
Malaysia’s AIM completed construction of Cyberjaya Block 3 in July 2025, ahead of schedule.
|
|
15.34 miles
|
Telekom Malaysia: KVDC 2
|
Telekom Malaysia has expanded its Cyberjaya Klang Valley Data Center (KVDC).
|
|
15.36 miles
|
Telekom Malaysia: KVDC 1
|
Telekom Malaysia is expanding two of its data centers. Cyberjaya Klang Valley Core Data Centre (KVDC) was opened in 2019.
|
|
15.63 miles
|
NTT Cyberjaya 1
|
|
|
15.66 miles
|
NTT Cyberjaya 2
|
NTT's Cyberjaya 2 (CBJ2) appears to have closed.
|
|
15.66 miles
|
AIMS: Cyberjaya 2
|
DigitalBridge-owned AIMS has finalized a RM4 billion ($1.01 billion) investment to develop a new AI-ready data center in Cyberjaya, Malaysia.
|
|
15.70 miles
|
NTT Cyberjaya 3
|
In 2012 NTT added CBJ3 which consists of two buildings, a Technology Center and the CBJ3 Data Center.
|
|
15.72 miles
|
NTT Cyberjaya 6
|
|
|
15.73 miles
|
NTT Cyberjaya 4
|
In 2014, NTT added CBJ4 phase which has two buildings. The Global Solution Center and the CBJ4 DC.
|
|
15.78 miles
|
NTT Cyberjaya 5
|
Cyberjaya 5 Data Center is located in the Multimedia Super Corridor, just a 30-minute drive from central Kuala Lumpur, in Malaysia's premier IT hub.
|
|
16.13 miles
|
GDC SDN: Cyberjaya
|
Global Data Centre Sdn. Bhd. (GDC), a subsidiary of Global Telecommunications Sdn. Bhd., is planning to build an AI-Driven Data Centre in Cyberjaya, Malaysia.
|
|
16.13 miles
|
Edgnex: Cyberjaya
|
The company will invest RM250 million ($52.4 million) to develop the facility on a 1.21-hectare plot of land.
|
|
16.21 miles
|
Strateq: Shah Alam I-City
|
|
|
16.22 miles
|
i-Berhad: i-City Bldg-1
|
Located in the heart of Shah Alam, i-Berhad’s Building 1 (also known as Block M) serves as the foundation for the i-City Data Centre Park.
|
|
16.27 miles
|
CSF Computer Exchange 2 (CX2)
|
The 300,000+ square foot CX2 data center in Kuala Lumpur, Malaysia is the flagship facility for the CSF Group, which went public in 2010 with an IPO in London.
|
|
16.34 miles
|
Bridge Data Centres Cyberjaya MY01
|
|
|
16.43 miles
|
Infinaxis: Cyberjaya 2
|
Infinaxis planned Cyberjaya 2 as a second building beside Cyberjaya 1 on Jalan Teknokrat 8. Infinaxis sold the first building to Digital Realty in 2026 (now KUL11) and no second-phase plan has surfaced since, so the project is in doubt.
|
|
16.47 miles
|
Digital Realty: KUL11
|
Digital Realty's KUL11 is a purpose-built data center on Jalan Teknokrat 8 in Cyber 5, Cyberjaya, about 500 m from KUL10. Infinaxis developed it with CSCEC as contractor and Digital Realty acquired it in 2026 as the AI and HPC building of its Cyberjaya campus.
|
|
16.48 miles
|
i-Berhad: i-City Bldg-3
|
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
|
|
16.53 miles
|
i-Berhad: i-City Bldg-2
|
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
|
|
16.68 miles
|
CSF Computer Exchange 5 (CX5)
|
Developed in three phases over three years, CX5 was completed in 2015.
|
|
16.69 miles
|
Digital Realty: Cyberjaya Expansion
|
The planned third building of Digital Realty's Cyberjaya campus, on a 1.6-acre parcel about 200 m from KUL10, targeted for completion in mid-2028 for hybrid colocation and AI-ready deployments.
|
|
16.70 miles
|
Digital Realty: KUL10
|
KUL10, formerly CSF's Computer Exchange 1 and TelcoHub 1 at 3552 Jalan Teknokrat 6, Cyberjaya, is the carrier hotel of Digital Realty's Cyberjaya campus and hosts the Malaysia Internet Exchange.
|
|
16.72 miles
|
TelcoHub X1 Cyberjaya
|
|
|
16.74 miles
|
Bridge DC: Southville City 1
|
The initial phase will focus on developing a data center site on 17.55 acres.
|
|
16.75 miles
|
Bridge: MY02 Bldg1
|
|
|
16.79 miles
|
Bridge: MY02 Bldg2
|
Bridge Data Centres (BDC) is expanding its footprint in Cyberjaya, Malaysia with the MY02 hyperscale data center project, adding substantial IT capacity across three phases.
|
|
16.85 miles
|
Bridge: MY02 Bldg3
|
|
|
16.92 miles
|
Bridge: MY02 Bldg4
|
|
|
17.00 miles
|
Bridge DC: Southville City 2
|
Bridge Data Centres and Malaysian developer Mah Sing Group Berhad are expanding their data center joint venture outside Kuala Lumpur.
|
|
17.16 miles
|
Keppel Cyberjaya Basis Bay DC
|
|
|
17.17 miles
|
Pi Data Centre: Cyberjaya
|
The development will span 7.3 acres, with Phase 1 construction scheduled to begin in the third quarter of 2024. The project is expected to be completed by the fourth quarter of 2025.
|
|
17.22 miles
|
Basis Bay: Cyberjaya DC1
|
Operational since 2009, Basis Bay DC.1 is a purpose-built, carrier-neutral facility designed to Tier III/Rated-3 standards (with Tier IV-ready mechanical and electrical redundancies).
|
|
17.24 miles
|
STT Kuala Lumpur 1
|
STT Kuala Lumpur 1, is specifically designed for hyperscalers and is currently in the final stages of completion to meet the growing demand for global cloud and AI infrastructure.
|
|
17.25 miles
|
SIC Quantum Data Center
|
Selangor Industrial Corporation (SIC) has partnered with domestic operator Data Centre Union (DC Union) in a joint venture named SIC Quantum Data Centre Sdn Bhd (SQDC) to build a RM 2.5 billion ($604M) data center campus.
|
|
17.26 miles
|
Basis Bay: Cyberjaya DC2
|
Basis Bay Cyberjaya DC.2 is a pioneering "Eco-Green Premium Data Centre" designed to meet the rigorous demands of the banking, financial services, and government sectors.
|
|
17.27 miles
|
Vantage: KUL2 Expansion
|
The remaining data centers planned on Vantage's KUL2 campus in Cyberjaya after KUL21.
|
|
17.27 miles
|
Equinix: KL2
|
The site is strategically located less than one kilometer from Equinix's KL1 data center, which began operations in May 2024.
|
|
17.30 miles
|
Vantage: KUL13
|
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
|
|
17.31 miles
|
Vantage: KUL14
|
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
|
|
17.33 miles
|
Open DC CJ1
|
|
|
17.33 miles
|
MyTelehaus Cyberjaya CJ1 Centre
|
|
|
17.34 miles
|
Ridge UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.35 miles
|
Vantage Cyberjaya KUL11
|
Vantage's multi-story, four-data-center KUL1 campus is an 8-minute drive from the Central Business District via the Persiaran APEC and a 30-minute drive from Kuala Lumpur International Airport.
|
|
17.36 miles
|
Equinix Kuala Lumpur KL1
|
Equinix KL1 is located within Vantage KUL1 Data Center Campus.
|
|
17.38 miles
|
Vantage: KUL12
|
In 2022, Vantage launched the second data center (KUL12) on its Cyberjaya CJ1 campus in Kuala Lumpur, Malaysia.
|
|
17.39 miles
|
Vantage: KUL21
|
KUL21 is the first data center on Vantage's KUL2 campus in Cyberjaya.
|
|
17.70 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.79 miles
|
EdgeConneX: Cyberjaya
|
The EdgeConneX data center campus in Cyberjaya (KUL3) will encompass nine buildings across 30 acres.
|
|
17.79 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.77 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|