0.19 miles
|
Element Critical CH1
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
1.40 miles
|
Cyxtera Elk Grove CH3
|
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
1.45 miles
|
1450 E Devon Ave (CH3) DRT
|
|
1.46 miles
|
Skybox Chicago I
|
|
1.47 miles
|
2200 Busse Rd (CH1) DRT
|
|
1.47 miles
|
Rackspace Elk Grove ORD1
|
|
1.48 miles
|
Digital Elk Grove Village Campus
|
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
1.48 miles
|
ServerCentral CH1
|
|
1.48 miles
|
ColoCrossing CH1
|
|
1.51 miles
|
2299 Busse (CH2) Digital Realty
|
|
1.84 miles
|
Stream Chicago II
|
|
2.02 miles
|
Equinix Chicago CH3
|
|
2.06 miles
|
EdgeConneX CHI01
|
|
2.07 miles
|
Edgeconnex Chicago Campus
|
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
|
2.07 miles
|
EdgeConneX CHI02
|
|
2.13 miles
|
CoreWeave: US Central ORD1
|
|
2.17 miles
|
Stream Chicago I
|
|
2.21 miles
|
NTT: 1200 N Arlington Heights (Planned)
|
Expansion site acquired in November 2023.
|
2.25 miles
|
NTT: 1250 N Arlington Heights (Planned)
|
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building
|
2.31 miles
|
STACK Chicago CHI01
|
|
2.33 miles
|
STACK CHI01B
|
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
2.49 miles
|
NTT Chicago CH1
|
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
|
3.45 miles
|
Prime Elk Grove
|
|
3.51 miles
|
T5 Chicago II
|
|
3.75 miles
|
T5 Northlake IL
|
|
4.06 miles
|
CenturyLink: Arlington Heights
|
|
4.18 miles
|
CloudHQ Mount Prospect ORD3
|
|
4.28 miles
|
Aligned: ORD-03
|
Aligned is about to build a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International. The company’s plan for the 36-acre site calls for a pair of two-story, 520,000-square-foot data centers.
|
4.33 miles
|
Microsoft Chicago Northlake
|
|
4.66 miles
|
505 N Railroad Ave - Digital Realty
|
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
4.84 miles
|
Aligned Chicago ORD-01
|
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~72 MW of critical load.
|
4.87 miles
|
Aligned ORD-02
|
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
|
5.07 miles
|
Iron Mountain Chicago
|
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
6.34 miles
|
Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
|
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
6.34 miles
|
9377 Grand Ave
|
|
6.35 miles
|
9355 Grand Ave
|
|
6.38 miles
|
9333 Grand Ave (DRT)
|
|
6.38 miles
|
SingleHop Chicago
|
|
6.43 miles
|
Tierpoint Chicago West
|
|
7.51 miles
|
DataBank ORD3 Mount Prospect
|
|
7.51 miles
|
Colocation America CH3
|
|
7.79 miles
|
Complete Source Schaumburg
|
|
8.58 miles
|
LexusNexis Oak Brook
|
|
8.58 miles
|
DataBank (ORD4) Oak Brook
|
|
8.58 miles
|
XO (Swift Dr)
|
|
8.88 miles
|
Server Farm Oak Brook
|
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
8.88 miles
|
US Signal Oakbrook
|
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
8.88 miles
|
XO: (Oak Brook)
|
|
8.89 miles
|
360TCS-Lombard
|
|
8.89 miles
|
Digital Fortress: Chicago Lombard
|
|
8.95 miles
|
NYI Chicago (Oak Brook)
|
|
9.16 miles
|
CyrusOne Chicago Lombard
|
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
9.91 miles
|
Lumen Broadview
|
|
11.11 miles
|
Equinix Chicago CH7
|
|
11.11 miles
|
Verizon Chicago (Downers Grove)
|
|
11.17 miles
|
Microsoft Hoffman Estates 2
|
|
11.27 miles
|
Microsoft Hoffman Estates 1
|
|
13.52 miles
|
Evoque Lisle CH1
|
|
14.86 miles
|
Cogent Naperville
|
|
14.91 miles
|
Compass Hoffman Estates
|
|
16.00 miles
|
New Continuum: 603 Discovery
|
|
16.25 miles
|
NetSource Chicago
|
|
16.76 miles
|
Metro Edge: Illinois Medical District (IMD)
|
|
17.32 miles
|
Lumen Chicago 2
|
|
17.42 miles
|
Lumen Chicago 4
|
|
17.84 miles
|
QTS Chicago
|
The campus was a former Sun Times Press Facility and was acquired in 2014
|
17.92 miles
|
Lumen Chicago 1
|
|
17.92 miles
|
GTT - 111 North Canal
|
|
18.05 miles
|
TierPoint Chicago Polk
|
|
18.06 miles
|
First Communications Chicago
|
|
18.07 miles
|
Lumen Chicago 6
|
|
18.16 miles
|
Lumen Chicago 3
|
|
18.21 miles
|
Server Farm Realty 840 South Canal
|
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
18.21 miles
|
DataBank (ORD2) 840 S Canal
|
|
18.29 miles
|
Cogent: 216 W Jackson
|
|
18.40 miles
|
CoreSite Chicago CH2
|
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
18.48 miles
|
XO: 140 S Dearborn
|
|
18.48 miles
|
GTT - 717 South Wells
|
|
18.48 miles
|
Netrality Chicago: 717 S Wells
|
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
18.49 miles
|
QuadraNet Chicago
|
|
18.49 miles
|
Atlantic Metro ORD3
|
|
18.49 miles
|
Colo@ Chicago
|
|
18.49 miles
|
Steadfast Chicago 725 Wells
|
|
18.49 miles
|
Crown Castle 725 S Wells
|
|
18.49 miles
|
CoreSite Chicago CH1
|
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
18.49 miles
|
Cogent: 427 S LaSalle
|
|
18.49 miles
|
365 Chicago
|
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
18.49 miles
|
InfoRelay Chicago
|
|
18.49 miles
|
725 S Wells - 1547 Critical Systems
|
1547 Acquired the site in December of 2018.
|
18.60 miles
|
Lumen Chicago 5
|
|
18.60 miles
|
Colocation America CH2
|
|
18.60 miles
|
Cogent: 600 S Federal
|
|
18.61 miles
|
600 S Federal - Digital Realty
|
|
18.74 miles
|
CyrusOne Chicago Aurora CME
|
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
18.95 miles
|
4267 Meridian Pkwy: Lincoln Rackhouse
|
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
|
19.71 miles
|
Equinix Chicago CH1, CH2, & CH4
|
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
|
19.71 miles
|
Steadfast Chicago 350 E Cermak
|
|
19.71 miles
|
Atlantic Metro ORD0
|
|
19.71 miles
|
350 E Cermak - Digital Realty
|
|
19.71 miles
|
Colocation America CH1
|
|
19.71 miles
|
Cyxtera Chicago CH2
|
Within DRT's Cermak carrier hotel
|
19.71 miles
|
Cyxtera Chicago CH4
|
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
|
19.72 miles
|
ServerCentral Chicago DRT-CH1
|
|