Expedient Dublin

Latest Podcast
5700 Innovation Drive
Operational
Fully operational facility
Operated by:

Expedient Dublin

░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators, offers multiple cooling systems, advanced fire suppression, and a carrier-neutral telecommunications infrastructure.

Map and Nearby Locations:

5700 Innovation Drive
Expedient Data Centers Sites
Nearby Facilities

Sites within 15 miles of Expedient Dublin

Distance Site About
0.77 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
2.17 miles Hyperscale Data Center Request Dataset
2.21 miles Hyperscale Data Center Request Dataset
2.24 miles Hyperscale Data Center Request Dataset
2.31 miles Hyperscale Data Center Request Dataset
2.37 miles Hyperscale Data Center Request Dataset
2.84 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
2.98 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
2.99 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
3.02 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
3.03 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
3.07 miles Hyperscale Data Center Request Dataset
Amazon is building a five-building data center campus in New Albany, Ohio.
3.27 miles Hyperscale Data Center Request Dataset
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
3.34 miles Hyperscale Data Center Request Dataset
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
3.39 miles Hyperscale Data Center Request Dataset
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
3.45 miles Hyperscale Data Center Request Dataset
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
3.48 miles Hyperscale Data Center Request Dataset
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
3.52 miles Hyperscale Data Center Request Dataset
3.55 miles Hyperscale Data Center Request Dataset
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
3.61 miles Hyperscale Data Center Request Dataset
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
3.66 miles Hyperscale Data Center Request Dataset
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
4.13 miles Expedient Upper Arlington
4.66 miles Hyperscale Data Center Request Dataset
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
4.72 miles Hyperscale Data Center Request Dataset
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
4.75 miles Hyperscale Data Center Request Dataset
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
4.81 miles Hyperscale Data Center Request Dataset
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
4.93 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
5.00 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
5.00 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
5.14 miles Hyperscale Data Center Request Dataset
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
5.30 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
5.39 miles Hyperscale Data Center Request Dataset
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
7.68 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
7.71 miles Cologix COL3
7.81 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
8.10 miles Expedient: Lewis Center
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
8.49 miles Kyndryl Columbus
8.81 miles Centersquare: Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord.
9.75 miles Cologix: Columbus COL5
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
9.81 miles Cologix: COL6
This planned facility is part of Cologix COL5 campus in Columbus.
10.65 miles Racksquared 2560 Value Way
10.78 miles WeConnect Westerville
10.87 miles eNET Columbus
11.18 miles Lumen: 580 North 4th
11.57 miles Lumen: 266 North 5th
11.60 miles Cogent: 240 North 5th
11.62 miles CityNet Columbus
11.62 miles Carrier-Neutral Data Center Request Dataset
11.63 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
11.63 miles Lumen: 226 North Fifth
11.77 miles Racksquared 325 E Spring St
11.84 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
11.84 miles CENTRA: 180 East Broad (CMH01)
12.03 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
12.97 miles Hyperscale Data Center Request Dataset
Amazon is constructing a two building data center campus in Marysville, Ohio, potentially spanning 500,000 square feet.
13.08 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's Marysville Campus in Ohio.
15.41 miles Carrier-Neutral Data Center Request Dataset
16.68 miles CeraNet Columbus
17.40 miles Discover Financial Services New Albany
17.41 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
17.68 miles TJX Corporate Techno
17.74 miles Compass New Albany
17.87 miles Compugen New Albany
17.89 miles Hyperscale Data Center Request Dataset
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
17.99 miles Stack: NAL01B
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
18.15 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
18.22 miles Hyperscale Data Center Request Dataset
This data center is part of Google's Lockbourne Campus in Ohio.
18.34 miles Hyperscale Data Center Request Dataset
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
18.42 miles Hyperscale Data Center Request Dataset
This data center is part of Google's Lockbourne Campus in Ohio.
18.61 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Lockbourne Campus in Ohio.
18.69 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Lockbourne Campus in Ohio.
19.74 miles Hyperscale Data Center Request Dataset
This facility is part of Google's New Albany campus in Ohio.
19.75 miles Hyperscale Data Center Request Dataset
This facility is part of Google's New Albany campus in Ohio.
19.77 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.

Expedient Dublin Data Center Photos (See all)

Operating Company

Operated by:

Expedient is a provider of cloud and data center infrastructure as a service (IaaS) with local operations in Baltimore, MD; Boston, MA; Cleveland, OH; Columbus, OH; Indianapolis, IN; Memphis, TN and Pittsburgh, PA.

Expedient History

  • Sep 2001 Founded as US VoiceData. (Cleveland, Ohio)
  • Dec 2001 Acquired RMRC. (Cleveland, Ohio)
  • Apr 2002 Acquired Expedient. (Cleveland, South Florida)
  • May 2002 Acquired Yipes Markets. (Boston, Miami, PIttsburgh)
  • Feb 2003. Acquired 6 Verio Markets.(Ohio, Tampa, Sacramento, Syracuse, Topeka)
  • Jun 2003. Acquired APK. (Northeast Ohio)
  • Oct 2003 Acquired Stargate. (Pittsburgh, Erie and Hagerstown, MD)
  • Oct 2005 Acquired by Continental Broadband, a Landmark Communications Company
  • Feb 2007 Acquired Data Center business of SafeCore (Boston, MA)
  • Jan 2007 Expanded into Indianapolis via our sister company, nFrame
  • Feb 2008 Over $1 million in expansion in Cleveland
  • May 2008 Expedient expands to 2nd data center in Pittsburgh (Allegheny Center Mall)
  • Aug 2008 Invests in a $4.8 Million build of 2nd data center (Cleveland)
  • Aug 2008 Became PCI-DSS compliant through self-attestation
  • Dec 2008 All offices become interconnected with a 10GB fiber backbone
  • Oct 2009 Opened 2nd Data center (Cleveland)
  • Dec 2009 Launch Operations Support Center (OSC)
  • Dec 2010 Opened first Columbus data center- 14,000 square feet
  • Jan 2011 Expand Boston Data Center by 3,600 square feet
  • Feb-Jul 2011 Multi million dollar power plant upgrade (Cleveland and Pittsburgh)
  • Dec 2011 Expansion of 2nd Baltimore Data center- 10,000 additional square feet
  • Apr 2012 Expansion of 152 Cleveland data center- 7,000 additional square feet
  • Nov 2013 Second Baltimore Data Center opened in Owings Mills area – 21,000 square feet
  • Dec 2013 Expansion of Pittsburgh ACM Data center- additional 8,000 square feet for a total of 30,000 square feet of space
  • Feb 2014 Expedient named to CRN top data center list for second year in a row
  • Sept 2014 Announcement of 2nd Columbus Data Center in Dublin, Ohio to be built from the ground up
  • Oct 2014 Announcement of 7th market, Memphis, TN with an open date of mid-year 2015
  • Jan 2015 151 NEO facility data center expansion completed – 6,000 sq ft added
  • July 2015 Opened First Memphis Data Center
  • Nov 2015 Opened Second Columbus Data Center in Dublin, OH
  • Nov 2015 Achievement of Payment Card Industry (PCI) Data Security Standard (DSS) Attestation of Compliance (AOC) for Report on Compliance (ROC) from Qualified Security Assessor (QSA)
  • March 2016 Expansion of Boston data center (8,000 sq. ft.)
  • July 2016 Offers SlimLine Cage for colocation
  • August 2016 Offers Push Button DR 2.0 with Software Defined Networking
  • September 2016 Offers On-Site Private Cloud with Disaster Recovery as a Service
  • June 2017 Receives recognition in Gartner Magic Quadrant for Disaster Recovery as a Service
  • Receives recognition as a Top 10 MSP Worldwide from MSP Mentor
  • December 2017 Expansion of Pittsburgh ACM (Nova Place) data center (10,000 sq. ft.)
  • Expansion of Indianapolis data center (3,500 sq. ft.)
  • February 2018 Recognized on CRN’s Data Center 100 list
  • May 2018 Named Zerto’s Growth Partner of the Year – Cloud Services Provider
  • June 2018 Named #7 managed services provider in the world on the MSP 501 Completed network backbone upgrade to 100 Gbp/s
  • July 2018 Positioned in Gartner Magic Quadrant for Disaster Recovery as a Service
15
Facilities
7
Markets
37MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?