Vint Hill Corners

Latest Podcast 4295 Aiken Dr
Planned
Future facility in planning stage
Operated by: Unknown Company

Vint Hill Corners

Lot Size: 50 acres

The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.

  • The proposed development would include an equipment yard, office space, a stormwater management pond as well as an entrance and exit planned off Kennedy Road and Brookside Parkway.
  • The site, located within the Vint Hill Planned Commercial Industrial District, is partially developed with a large portion heavily wooded and containing wetlands. The developers have proposed a portion of the existing wetlands be removed, and existing utilities such as storm, sanitary and water will need to be relocated in order to make way for the proposed development.

Map and Nearby Locations

4295 Aiken Dr
Unknown Company Sites
Nearby Facilities

Sites within 15 miles of Vint Hill Corners

Distance Site About
0.53 miles OVH: Vint Hill Bldg 2
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
0.62 miles OVH: Vint Hill Bldg 1
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
0.93 miles CyrusOne: Vint Hill
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
4.63 miles Data Center Edge District
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
5.08 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
5.19 miles Cloud CenterInterested in this information?Contact us
5.20 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.25 miles BetaInterested in this information?Contact us
5.26 miles EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.28 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.28 miles 8217 Linton Hall (VA4) Digital Realty
5.28 miles MaxInterested in this information?Contact us
5.29 miles Plaza OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.32 miles Station BetaInterested in this information?Contact us
5.33 miles JK Land: Hunter Trust
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
5.51 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
5.54 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
5.56 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
5.56 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
5.57 miles NTT: VA10
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
5.60 miles Metro PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.75 miles Yondr: Bristow Bldg2
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
5.95 miles Yondr: Bristow Bldg1
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
6.01 miles Core RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.09 miles Central RidgeInterested in this information?Contact us
6.14 miles Maple Tree Farm
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
6.30 miles Valley OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.38 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.38 miles Headwaters: Catlett, VA
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
6.42 miles Central PointInterested in this information?Contact us
6.45 miles Center TwoInterested in this information?Contact us
6.48 miles Plaza PlusInterested in this information?Contact us
6.49 miles Tower ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.53 miles Station BetaInterested in this information?Contact us
6.53 miles Tower AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.58 miles Plaza OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.59 miles Center OneInterested in this information?Contact us
6.67 miles Tower GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.69 miles Cloud ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.69 miles EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.70 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
6.74 miles South ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.79 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
6.85 miles Corscale: Gainesville 1
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
6.86 miles MetroInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.02 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
7.10 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
7.11 miles Cloud StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.18 miles WestInterested in this information?Contact us
7.24 miles ParkInterested in this information?Contact us
7.26 miles BlackChamber: Gainesville, VA
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
7.60 miles Stack: Bristow 1 (NVA02K)
Bristow 1 (NVA02K) is the first of two three-story data centers STACK Infrastructure proposed on a 58-acre site in Bristow, Virginia. Prince William County supervisors rejected the project in September 2025.
7.60 miles Stack: NVA02I
NVA02I is a 256,280 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10161 Linton Hall Road in Prince William County, Virginia.
7.60 miles East ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.69 miles Stack: NVA02J
NVA02J is a 201,000 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10155 Linton Hall Road in Prince William County, Virginia.
7.69 miles West StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.69 miles Stack: NVA02H
NVA02H is a 256,212 sq ft, two-story data center building under construction on STACK Infrastructure's NVA02 campus at 10167 Linton Hall Road in Prince William County, Virginia.
7.69 miles Tower MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.73 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.78 miles Stack: Bristow 2 (NVA02L)
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
7.79 miles Iron Mountain VA-1
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
7.82 miles Opus Interactive Manassas
7.82 miles Iron Mountain VA-2
7.83 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
7.87 miles Stack: NVA02E
NVA02E is a 259,200 sq ft data center building on STACK Infrastructure's NVA02 campus at 9570 Hornbaker Road in Manassas, Virginia.
7.89 miles Stack: NVA02F
NVA02F is a data center building under construction on STACK Infrastructure's NVA02 campus at 9640 Hornbaker Road in Manassas, Virginia.
7.94 miles Iron Mountain: VA-8
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
7.95 miles Core CenterInterested in this information?Contact us
7.95 miles Stack: NVA02G
NVA02G is a 185,803 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 9530 Hornbaker Road in Manassas, Virginia.
7.98 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
8.02 miles Park PrimeInterested in this information?Contact us
8.03 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
8.03 miles Stack: NVA02D
NVA02D is a 281,000 sq ft data center building on STACK Infrastructure's NVA02 campus at 9590 Hornbaker Road in Manassas, Virginia.
8.04 miles Iron Mountain: VA-6
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
8.04 miles Center BetaInterested in this information?Contact us
8.05 miles Tower UltraInterested in this information?Contact us
8.06 miles PrimeInterested in this information?Contact us
8.11 miles TwoInterested in this information?Contact us
8.13 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
8.18 miles West HubInterested in this information?Contact us
8.18 miles Edge StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.19 miles Stack: NVA02A
NVA02A is a 226,862 sq ft data center building on STACK Infrastructure's NVA02 campus at 9750 Hornbaker Road in Manassas, Virginia.
8.19 miles Metro CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.19 miles Stack: NVA02B
NVA02B is a 224,652 sq ft data center building on STACK Infrastructure's NVA02 campus at 9740 Hornbaker Road in Manassas, Virginia.
8.19 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
8.20 miles Stack: NVA02C
NVA02C, or Building C, is a 14,387 sq ft building on STACK Infrastructure's NVA02 campus at 9730 Hornbaker Road in Manassas, Virginia.
8.24 miles EastInterested in this information?Contact us
8.26 miles Yondr: Manassas
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
8.28 miles Hub MaxInterested in this information?Contact us
8.28 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
8.28 miles Evoswitch USA WDC 1
8.28 miles VAZATA Northern Virginia (NoVa One)
8.35 miles Ridge TwoInterested in this information?Contact us
8.42 miles Hub UltraInterested in this information?Contact us
8.42 miles East ValleyInterested in this information?Contact us
8.44 miles Point TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.45 miles Global StationInterested in this information?Contact us
8.48 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
8.49 miles Plaza PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.56 miles MaxInterested in this information?Contact us
8.67 miles JK Land: Comcast Center
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
8.70 miles Cloud TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.89 miles Prime CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.90 miles EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.00 miles Hub AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.02 miles Park PrimeInterested in this information?Contact us
9.03 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.03 miles Cloud RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.08 miles QTS Manassas 1 DC5
This facility is part of QTS Data Center Campus in Manassas.
9.08 miles UltraInterested in this information?Contact us
9.10 miles Stack: NVA05A
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
9.10 miles Plaza ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.15 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
9.17 miles QTS: Manassas 1 DC4
9.19 miles Point ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.24 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
9.26 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.29 miles QTS: Manassas 1 DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
9.31 miles QTS Manassas 1 DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
9.32 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
9.34 miles QTS: Manassas 1 DC2
This facility is part of QTS Data Center Campus in Manassas.
9.36 miles TPC: Manassas, VA
9.37 miles CloudHQ: MDC3
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
9.40 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
9.42 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.43 miles QTS: Manassas 1 DC3
This facility is part of QTS Data Center Campus in Manassas.
9.48 miles CloudHQ: MDC2
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
9.52 miles North PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.53 miles Digital Realty: IAD50
9.58 miles Digital Realty: IAD51
9.60 miles CloudHQ: MDC1
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
9.60 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
9.67 miles Cloud PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.67 miles Prime PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.77 miles Cloud ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.77 miles Digital Realty: IAD53
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
9.78 miles South RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.83 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.00 miles Black Chamber: Nokesville
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
10.03 miles CloudHQ: MCC7
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
10.13 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.14 miles CloudHQ MCC2
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
10.19 miles CloudHQ: MCC1
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
10.22 miles Verizon: 7777 Infantry Ridge
Former AOL data center
10.22 miles CloudHQ MCC3
CloudHQ MCC3 is a part of The MCC data center campus.
10.24 miles Equinix Manassas DC14
10.28 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.34 miles CloudHQ: MCC4
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
10.36 miles Metro PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.36 miles CloudHQ: MCC6Z
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
10.45 miles CloudHQ: MCC6A
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
10.55 miles CloudHQ: MCC5
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
11.16 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
14.79 miles Cloud HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.82 miles SAMX data center campus
SAMX Data LLC submitted an application in October 2023 to rezone approximately 55.26 acres of property at 11825 Remington Road.
14.88 miles Convergent Technology Park
Convergent VA has submitted revised conceptual plans for the Convergent Technology Park in Remington, Fauquier County, Virginia.
14.89 miles Parkstone Tech Park
15.20 miles PointOne: Remington Expansion
15.31 miles PointOne: Remington 1
First building of PointOne's Remington Technology Park on Lucky Hill Road in Remington, Virginia, one of five planned buildings on the 234-acre campus.
15.51 miles Gigaland: Remington, VA
Gigaland has scrapped its initial plans for an 800MW data center campus in Fauquier County, Virginia, after facing local opposition. However, the company now plans to propose a smaller project for the site.
15.52 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.58 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.59 miles Cloud PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.62 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.69 miles Park BetaInterested in this information?Contact us
15.71 miles Edge HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.72 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.74 miles North PointInterested in this information?Contact us
15.74 miles Central PointInterested in this information?Contact us
15.75 miles Edge CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.76 miles MetroInterested in this information?Contact us
15.76 miles MetroInterested in this information?Contact us
15.80 miles Tower ProInterested in this information?Contact us
15.82 miles MaxInterested in this information?Contact us
15.85 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
15.86 miles Park PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.87 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
15.90 miles Hub UltraInterested in this information?Contact us
15.91 miles PowerHouse: Arcola Bldg A
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
15.92 miles Campus BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.95 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
15.97 miles PowerHouse: Arcola Bldg B
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
16.00 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
16.05 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
16.06 miles Center GammaInterested in this information?Contact us
16.09 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
16.19 miles Campus OneInterested in this information?Contact us
16.20 miles CentralInterested in this information?Contact us
16.21 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
16.23 miles Valley AlphaInterested in this information?Contact us
16.26 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.27 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.29 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
16.31 miles Global PlazaInterested in this information?Contact us
16.31 miles South CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.32 miles Quantico Ridge Data Center
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
16.33 miles Cloud PlazaInterested in this information?Contact us
16.35 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
16.36 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.38 miles RidgeInterested in this information?Contact us
16.40 miles TowerInterested in this information?Contact us
16.44 miles EastInterested in this information?Contact us
16.45 miles JK Land: Tech Park 1 Expansion
16.46 miles Hub TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.55 miles TowerInterested in this information?Contact us
16.56 miles Center ThreeInterested in this information?Contact us
16.63 miles Station MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.64 miles Hub PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.65 miles South ValleyInterested in this information?Contact us
16.65 miles Edge ParkInterested in this information?Contact us
16.70 miles EastInterested in this information?Contact us
16.71 miles Central ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.76 miles Global StationInterested in this information?Contact us
16.88 miles Tower PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.93 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
17.07 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
17.20 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
17.65 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
17.68 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
17.78 miles Global StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.79 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
17.81 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.87 miles Core StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.09 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
18.25 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
18.28 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
18.37 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
18.52 miles Ridge MaxInterested in this information?Contact us
18.56 miles Campus GammaInterested in this information?Contact us
18.58 miles MetroInterested in this information?Contact us
18.70 miles Core CenterInterested in this information?Contact us
18.87 miles Active Infra: Spring Valley 1
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
18.89 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
19.13 miles Park PrimeInterested in this information?Contact us
19.13 miles Central PointInterested in this information?Contact us
19.16 miles Edge RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.18 miles Hyperscale Data CenterInterested in this information?Contact us
19.25 miles Hyperscale Data CenterInterested in this information?Contact us
19.26 miles Hyperscale Data CenterInterested in this information?Contact us
19.27 miles Ridge UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.30 miles Metro ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.31 miles Hyperscale Data CenterInterested in this information?Contact us
19.34 miles North PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.46 miles Active Infra: Spring Valley Expansion

Vint Hill Corners Data Center Photos See all

The concept plan for the Vint Hill Corners data center campus.
Source: Fauquier County Department of Community Development
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by: Unknown Company
0
Facilities
0
Markets

News See all

Read Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium
State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's grow...

Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium

October 15, 2026 Virginia

State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's growth in the world's largest data center market. Senate Bill 843 would take effect July 1, 2027 and...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations
Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

August 23, 2024 Northern Virginia

A report from Synergy Research Group found that just twenty state or metro markets account for 62 percent of the world’s current hyperscale data center capacity. Northern Virginia tops this list while the Greater Beijing Area takes the second place, with both making up 22 percent of global...

Read more
Read Data center design standards approved by Leesburg Town Council in Loudoun
Data center design standards approved by Leesburg Town Council in Loudoun

Data center design standards approved by Leesburg Town Council in Loudoun

August 16, 2023 Northern Virginia

Leesburg's Loudoun County Council unanimously approved data center design criteria. Unlike Ashburn, Virginia's Leesburg has no data centers; however, this may change. Three rezoning petitions may allow data center development in town. One is in the Oaklawn neighborhood, one close to the former...

Read more
Read Prince William County locals want a data center developer to buy property outside Gainesville
Prince William County locals want a data center developer to buy property outside Gainesville

Prince William County locals want a data center developer to buy property outside Gainesville

June 28, 2023 Northern Virginia

Residents of Prince William County, Virginia, are attempting to sell their land to an unidentified data center developer. According to InsideNoVa, residents of Sanders Lane near Gainesville are attempting to sell their land to a data center developer. The residents appear to be attempting to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?