0.53 miles
|
OVH: Vint Hill Bldg 2
|
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
|
|
0.62 miles
|
OVH: Vint Hill Bldg 1
|
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
|
|
0.93 miles
|
CyrusOne: Vint Hill
|
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
|
|
4.63 miles
|
Data Center Edge District
|
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
|
|
5.08 miles
|
Gardner Property Project
|
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
|
5.19 miles
|
Cloud CenterInterested in this information?Contact us
|
|
|
5.20 miles
|
PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.25 miles
|
BetaInterested in this information?Contact us
|
|
|
5.26 miles
|
EdgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.28 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.28 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
|
5.28 miles
|
MaxInterested in this information?Contact us
|
|
|
5.29 miles
|
Plaza OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.32 miles
|
Station BetaInterested in this information?Contact us
|
|
|
5.33 miles
|
JK Land: Hunter Trust
|
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
|
|
5.51 miles
|
NTT: VA13
|
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
5.54 miles
|
NTT: VA12
|
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
5.56 miles
|
NTT: VA11
|
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
5.56 miles
|
John Marshall Commons Tech Park
|
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
|
5.57 miles
|
NTT: VA10
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
5.60 miles
|
Metro PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.75 miles
|
Yondr: Bristow Bldg2
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
|
|
5.95 miles
|
Yondr: Bristow Bldg1
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
|
6.01 miles
|
Core RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.09 miles
|
Central RidgeInterested in this information?Contact us
|
|
|
6.14 miles
|
Maple Tree Farm
|
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
|
|
6.30 miles
|
Valley OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.38 miles
|
HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.38 miles
|
Headwaters: Catlett, VA
|
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
|
|
6.42 miles
|
Central PointInterested in this information?Contact us
|
|
|
6.45 miles
|
Center TwoInterested in this information?Contact us
|
|
|
6.48 miles
|
Plaza PlusInterested in this information?Contact us
|
|
|
6.49 miles
|
Tower ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.53 miles
|
Station BetaInterested in this information?Contact us
|
|
|
6.53 miles
|
Tower AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.58 miles
|
Plaza OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.59 miles
|
Center OneInterested in this information?Contact us
|
|
|
6.67 miles
|
Tower GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.69 miles
|
Cloud ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.69 miles
|
EdgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.70 miles
|
CorScale: Gainesville 2
|
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
|
6.74 miles
|
South ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.79 miles
|
CorScale: Gainesville 3
|
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
|
6.85 miles
|
Corscale: Gainesville 1
|
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
|
6.86 miles
|
MetroInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.02 miles
|
CorScale: Gainesville 4
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
7.10 miles
|
CorScale: Gainesville 5
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
7.11 miles
|
Cloud StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.18 miles
|
WestInterested in this information?Contact us
|
|
|
7.24 miles
|
ParkInterested in this information?Contact us
|
|
|
7.26 miles
|
BlackChamber: Gainesville, VA
|
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
|
|
7.60 miles
|
Stack: Bristow 1 (NVA02K)
|
Bristow 1 (NVA02K) is the first of two three-story data centers STACK Infrastructure proposed on a 58-acre site in Bristow, Virginia. Prince William County supervisors rejected the project in September 2025.
|
|
7.60 miles
|
Stack: NVA02I
|
NVA02I is a 256,280 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10161 Linton Hall Road in Prince William County, Virginia.
|
|
7.60 miles
|
East ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.69 miles
|
Stack: NVA02J
|
NVA02J is a 201,000 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10155 Linton Hall Road in Prince William County, Virginia.
|
|
7.69 miles
|
West StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.69 miles
|
Stack: NVA02H
|
NVA02H is a 256,212 sq ft, two-story data center building under construction on STACK Infrastructure's NVA02 campus at 10167 Linton Hall Road in Prince William County, Virginia.
|
|
7.69 miles
|
Tower MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.73 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.78 miles
|
Stack: Bristow 2 (NVA02L)
|
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
|
|
7.79 miles
|
Iron Mountain VA-1
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
|
7.82 miles
|
Opus Interactive Manassas
|
|
|
7.82 miles
|
Iron Mountain VA-2
|
|
|
7.83 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
|
7.87 miles
|
Stack: NVA02E
|
NVA02E is a 259,200 sq ft data center building on STACK Infrastructure's NVA02 campus at 9570 Hornbaker Road in Manassas, Virginia.
|
|
7.89 miles
|
Stack: NVA02F
|
NVA02F is a data center building under construction on STACK Infrastructure's NVA02 campus at 9640 Hornbaker Road in Manassas, Virginia.
|
|
7.94 miles
|
Iron Mountain: VA-8
|
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
|
|
7.95 miles
|
Core CenterInterested in this information?Contact us
|
|
|
7.95 miles
|
Stack: NVA02G
|
NVA02G is a 185,803 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 9530 Hornbaker Road in Manassas, Virginia.
|
|
7.98 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
|
8.02 miles
|
Park PrimeInterested in this information?Contact us
|
|
|
8.03 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
|
8.03 miles
|
Stack: NVA02D
|
NVA02D is a 281,000 sq ft data center building on STACK Infrastructure's NVA02 campus at 9590 Hornbaker Road in Manassas, Virginia.
|
|
8.04 miles
|
Iron Mountain: VA-6
|
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
|
|
8.04 miles
|
Center BetaInterested in this information?Contact us
|
|
|
8.05 miles
|
Tower UltraInterested in this information?Contact us
|
|
|
8.06 miles
|
PrimeInterested in this information?Contact us
|
|
|
8.11 miles
|
TwoInterested in this information?Contact us
|
|
|
8.13 miles
|
Iron Mountain: VA-7
|
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
|
|
8.18 miles
|
West HubInterested in this information?Contact us
|
|
|
8.18 miles
|
Edge StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.19 miles
|
Stack: NVA02A
|
NVA02A is a 226,862 sq ft data center building on STACK Infrastructure's NVA02 campus at 9750 Hornbaker Road in Manassas, Virginia.
|
|
8.19 miles
|
Metro CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.19 miles
|
Stack: NVA02B
|
NVA02B is a 224,652 sq ft data center building on STACK Infrastructure's NVA02 campus at 9740 Hornbaker Road in Manassas, Virginia.
|
|
8.19 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
8.20 miles
|
Stack: NVA02C
|
NVA02C, or Building C, is a 14,387 sq ft building on STACK Infrastructure's NVA02 campus at 9730 Hornbaker Road in Manassas, Virginia.
|
|
8.24 miles
|
EastInterested in this information?Contact us
|
|
|
8.26 miles
|
Yondr: Manassas
|
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
|
|
8.28 miles
|
Hub MaxInterested in this information?Contact us
|
|
|
8.28 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
|
8.28 miles
|
Evoswitch USA WDC 1
|
|
|
8.28 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
|
8.35 miles
|
Ridge TwoInterested in this information?Contact us
|
|
|
8.42 miles
|
Hub UltraInterested in this information?Contact us
|
|
|
8.42 miles
|
East ValleyInterested in this information?Contact us
|
|
|
8.44 miles
|
Point TwoInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.45 miles
|
Global StationInterested in this information?Contact us
|
|
|
8.48 miles
|
Iron Mountain: Manassas Point
|
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
|
8.49 miles
|
Plaza PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.56 miles
|
MaxInterested in this information?Contact us
|
|
|
8.67 miles
|
JK Land: Comcast Center
|
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
|
|
8.70 miles
|
Cloud TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.89 miles
|
Prime CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.90 miles
|
EdgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.00 miles
|
Hub AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.02 miles
|
Park PrimeInterested in this information?Contact us
|
|
|
9.03 miles
|
North CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.03 miles
|
Cloud RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.08 miles
|
QTS Manassas 1 DC5
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
9.08 miles
|
UltraInterested in this information?Contact us
|
|
|
9.10 miles
|
Stack: NVA05A
|
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
|
9.10 miles
|
Plaza ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.15 miles
|
Stack: NVA05D
|
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
|
|
9.17 miles
|
QTS: Manassas 1 DC4
|
|
|
9.19 miles
|
Point ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.24 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
|
9.26 miles
|
North CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.29 miles
|
QTS: Manassas 1 DC1
|
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
|
9.31 miles
|
QTS Manassas 1 DC6
|
This facility is part of QTS Manassas 1 Campus in Virginia.
|
|
9.32 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
9.34 miles
|
QTS: Manassas 1 DC2
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
9.36 miles
|
TPC: Manassas, VA
|
|
|
9.37 miles
|
CloudHQ: MDC3
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
9.40 miles
|
Stack: NVA05C
|
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
|
|
9.42 miles
|
MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.43 miles
|
QTS: Manassas 1 DC3
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
9.48 miles
|
CloudHQ: MDC2
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
9.52 miles
|
North PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.53 miles
|
Digital Realty: IAD50
|
|
|
9.58 miles
|
Digital Realty: IAD51
|
|
|
9.60 miles
|
CloudHQ: MDC1
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
9.60 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
9.67 miles
|
Cloud PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.67 miles
|
Prime PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.77 miles
|
Cloud ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.77 miles
|
Digital Realty: IAD53
|
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
|
|
9.78 miles
|
South RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.83 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.00 miles
|
Black Chamber: Nokesville
|
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
|
|
10.03 miles
|
CloudHQ: MCC7
|
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
|
|
10.13 miles
|
PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.14 miles
|
CloudHQ MCC2
|
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
|
|
10.19 miles
|
CloudHQ: MCC1
|
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
|
|
10.22 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
10.22 miles
|
CloudHQ MCC3
|
CloudHQ MCC3 is a part of The MCC data center campus.
|
|
10.24 miles
|
Equinix Manassas DC14
|
|
|
10.28 miles
|
CentralInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.34 miles
|
CloudHQ: MCC4
|
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
|
|
10.36 miles
|
Metro PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.36 miles
|
CloudHQ: MCC6Z
|
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
|
|
10.45 miles
|
CloudHQ: MCC6A
|
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
|
|
10.55 miles
|
CloudHQ: MCC5
|
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
|
|
11.16 miles
|
Dulles South Innovation Center
|
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
|
|
14.79 miles
|
Cloud HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.82 miles
|
SAMX data center campus
|
SAMX Data LLC submitted an application in October 2023 to rezone approximately 55.26 acres of property at 11825 Remington Road.
|
|
14.88 miles
|
Convergent Technology Park
|
Convergent VA has submitted revised conceptual plans for the Convergent Technology Park in Remington, Fauquier County, Virginia.
|
|
14.89 miles
|
Parkstone Tech Park
|
|
|
15.20 miles
|
PointOne: Remington Expansion
|
|
|
15.31 miles
|
PointOne: Remington 1
|
First building of PointOne's Remington Technology Park on Lucky Hill Road in Remington, Virginia, one of five planned buildings on the 234-acre campus.
|
|
15.51 miles
|
Gigaland: Remington, VA
|
Gigaland has scrapped its initial plans for an 800MW data center campus in Fauquier County, Virginia, after facing local opposition. However, the company now plans to propose a smaller project for the site.
|
|
15.52 miles
|
ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.58 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.59 miles
|
Cloud PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.62 miles
|
CoreInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.69 miles
|
Park BetaInterested in this information?Contact us
|
|
|
15.71 miles
|
Edge HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.72 miles
|
CloudInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.74 miles
|
North PointInterested in this information?Contact us
|
|
|
15.74 miles
|
Central PointInterested in this information?Contact us
|
|
|
15.75 miles
|
Edge CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.76 miles
|
MetroInterested in this information?Contact us
|
|
|
15.76 miles
|
MetroInterested in this information?Contact us
|
|
|
15.80 miles
|
Tower ProInterested in this information?Contact us
|
|
|
15.82 miles
|
MaxInterested in this information?Contact us
|
|
|
15.85 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
15.86 miles
|
Park PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.87 miles
|
Yondr: Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
15.90 miles
|
Hub UltraInterested in this information?Contact us
|
|
|
15.91 miles
|
PowerHouse: Arcola Bldg A
|
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
15.92 miles
|
Campus BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.95 miles
|
Yondr: Arcola Bldg 1
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
15.97 miles
|
PowerHouse: Arcola Bldg B
|
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
16.00 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
16.05 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
16.06 miles
|
Center GammaInterested in this information?Contact us
|
|
|
16.09 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
16.19 miles
|
Campus OneInterested in this information?Contact us
|
|
|
16.20 miles
|
CentralInterested in this information?Contact us
|
|
|
16.21 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
16.23 miles
|
Valley AlphaInterested in this information?Contact us
|
|
|
16.26 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.27 miles
|
OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.29 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
16.31 miles
|
Global PlazaInterested in this information?Contact us
|
|
|
16.31 miles
|
South CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.32 miles
|
Quantico Ridge Data Center
|
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
|
|
16.33 miles
|
Cloud PlazaInterested in this information?Contact us
|
|
|
16.35 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
16.36 miles
|
CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.38 miles
|
RidgeInterested in this information?Contact us
|
|
|
16.40 miles
|
TowerInterested in this information?Contact us
|
|
|
16.44 miles
|
EastInterested in this information?Contact us
|
|
|
16.45 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
16.46 miles
|
Hub TwoInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.55 miles
|
TowerInterested in this information?Contact us
|
|
|
16.56 miles
|
Center ThreeInterested in this information?Contact us
|
|
|
16.63 miles
|
Station MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.64 miles
|
Hub PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.65 miles
|
South ValleyInterested in this information?Contact us
|
|
|
16.65 miles
|
Edge ParkInterested in this information?Contact us
|
|
|
16.70 miles
|
EastInterested in this information?Contact us
|
|
|
16.71 miles
|
Central ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.76 miles
|
Global StationInterested in this information?Contact us
|
|
|
16.88 miles
|
Tower PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.93 miles
|
Starwood: Stonecroft Blvd, Chantilly
|
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
|
|
17.07 miles
|
Stack: Loudoun 1
|
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
17.20 miles
|
Stack: Loudoun 2
|
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
17.65 miles
|
CyrusOne: NVA9 Bldg-1A
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
17.68 miles
|
CyrusOne: NVA9 Bldg-1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
17.78 miles
|
Global StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.79 miles
|
CyrusOne: NVA9 Bldg-2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
17.81 miles
|
SouthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.87 miles
|
Core StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.09 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
18.25 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
18.28 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
18.37 miles
|
Digital Realty: IAD45
|
This facility is part of the Digital Dulles Campus in Sterling, VA.
|
|
18.52 miles
|
Ridge MaxInterested in this information?Contact us
|
|
|
18.56 miles
|
Campus GammaInterested in this information?Contact us
|
|
|
18.58 miles
|
MetroInterested in this information?Contact us
|
|
|
18.70 miles
|
Core CenterInterested in this information?Contact us
|
|
|
18.87 miles
|
Active Infra: Spring Valley 1
|
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
|
|
18.89 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
19.13 miles
|
Park PrimeInterested in this information?Contact us
|
|
|
19.13 miles
|
Central PointInterested in this information?Contact us
|
|
|
19.16 miles
|
Edge RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.18 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.25 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.26 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.27 miles
|
Ridge UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.30 miles
|
Metro ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.31 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.34 miles
|
North PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.46 miles
|
Active Infra: Spring Valley Expansion
|
|