0.22 miles
|
Beale: De Soto 4
|
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
|
|
0.49 miles
|
Beale: De Soto 2
|
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
|
|
0.55 miles
|
Beale: De Soto, KS
|
Dubbed ‘Project Pilot’, the data center will be built in four phases on a 290-acre site.
|
|
8.51 miles
|
DigiCo: Kansas City KCM1
|
In January 2025, DigiCo Infrastructure REIT completed the acquisition of a mission-critical enterprise data center in Olathe, Kansas, as part of a larger portfolio deal with JDM III AZ LLC.
|
|
8.90 miles
|
Connect Data Centers: Olathe, KS
|
US investment firm Oppidan's Olathe data center spans 89,842 sq ft. Oppidan lists Connect Data Centers as a subsidiary.
|
|
11.39 miles
|
QTS: New Century Commerce Center
|
The company has leased a substantial 756,000 square foot (70,234 sqm) facility, identified as Building B1, within the New Century Commerce Center (NCCC) in New Century, Kansas.
|
|
12.67 miles
|
Lightedge: Lenexa (Cavern)
|
Located 125 feet underground within a three-million-square-foot limestone formation, the Lenexa facility was added to the LightEdge portfolio following the acquisition of Cavern Technologies in September 2021.
|
|
13.84 miles
|
DataBank Kansas City MCI3
|
The expansion of the MCI3 data center in Lenexa, Kansas is now complete and offers an additional 17,000 square feet of raised flooring.
|
|
13.93 miles
|
DataBank South Lake KC1
|
DataBank’s South Lake facility is situated in the technology-rich, South Kansas City suburb of Lenexa, providing direct, on-site connectivity to several Tier 1 carriers.
Powered by two separate substations with on-site, diesel-powered generators for backup, the data center includes 6,000+ sqft of space for customer equipment and advanced cooling technology to ensure optimal operating temperatures.
|
|
13.96 miles
|
Beale: Gardner Campus
|
Proposed by Blue Owl-backed Beale Infrastructure, Project Brewer was a massive hyperscale data center campus slated for an approximately 300-acre site in Gardner, Kansas.
|
|
14.27 miles
|
Consolidated Lenexa
|
Consolidated (CCI) data center located in the Southwest Kansas City metro.
|
|
14.55 miles
|
TierPoint Kansas City-Lenexa
|
Power Density: upto 20kW per cabinet
2 Utility transformers protected inside mechanical area/yard
Dedicated utility transformer for each UPS
|
|
14.73 miles
|
Red Wolf DCD: Kansas City, KS
|
Red Wolf DCD Properties LLC intends to construct a substantial 400-acre data center campus featuring six buildings totaling 1.8 million square feet and two on-site substations.
|
|
14.83 miles
|
Red Wolf DCD: Kansas Expansion
|
|
|
16.99 miles
|
Netrality: Kansas City 7801 Nieman
|
|
|
17.09 miles
|
DataBank Pine Ridge KC2
|
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.
|
|
18.01 miles
|
Colossus: Spring Hill, Kansas
|
In a sudden reversal, data center consultancy firm Colossus Data Center Advisors has abruptly withdrawn its proposal to build a massive 316-acre data center campus in Spring Hill, Kansas.
|
|
19.31 miles
|
QTS Overland Park
|
The building also serves as QTS Headquarters
|