Year Built: 2014
PUE: 1.5
Utility Provider: Kansas City Power & Light
Lot Size: 6 acres
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Facility:

  • Phase 1 = 22,000 sq ft
  • 6 acre equipment yard
  • 400,000 sq ft contiguous expansion
  • Excellent for pre-fab container DCs
  • Scalable power & cooling that can be dedicated, semi-dedicated or shared
  • The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.

Power:

  • Parallel 600 kW generators
  • 2.4MW of capacity on each side
  • 2 separate power feeds from dual substations
  • Power density up to 8.6kW per rack

HVAC:

  • Redundant Liebert CRAH & UPS
  • Hot aisle/cold aisle design
  • Chilled water system for cooling DC
  • 3 ft raised oors
  • All HVAC units are dual power fed & utilize Variable Speed Fans
  • Building Management System to ensure conformance with ASHRAE TC 9.9 standards for A1 environments

Compliance:

  • PCI-DSS v3.0 & HIPAA compliant
  • SSAE 16 SOC 1 & 2 Type II audited
  • ISO 20000 certied
  • 24x7x365 manned Operations Center
  • Remote technical hands available

Map and Nearby Locations:

9050 NE Underground Drive
LightEdge Solutions Sites
Nearby Facilities

Sites within 15 miles of LightEdge Kansas City

Distance Site About
0.92 miles Edged Energy: Kansas City, MO
The facility known as Edged Kansas City is located in Kansas City, Missouri.
1.09 miles Hyperscale Data Center Request Dataset
Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.
1.40 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Kansas City Campus in Missouri.
1.56 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Kansas City Campus in Missouri.
1.72 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Kansas City Campus in Missouri.
3.00 miles Metrobloks: Kansas City MCI-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q4 2027.
7.12 miles Nocix 2 (1530 Swift)
7.17 miles NOCIX
7.81 miles Joe's Datacenter Kansas City
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
8.13 miles Lumen Kansas City 3
8.17 miles IP Pathways: Kansas City
The facility was acquired from Netsolus in 2023.
8.29 miles Lumen Kansas City 4
8.29 miles Contegix 1102 Grand
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
8.36 miles Lumen Kansas City 1
8.44 miles Nebius: Kansas City
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
8.45 miles Patmos: Kansas City
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
8.50 miles Nebius: Independence Campus
European cloud firm Nebius is spearheading a massive AI data center campus in Independence, Missouri, positioned just outside Kansas City.
8.65 miles Contegix Mainmark
The site was acquired in late 2016 when Contegix acquired Admo.
10.75 miles 1102 Grand St (Netrality) Kansas City Carrier Hotel
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
10.99 miles Iron Mountain Kansas Underground
Iron Mountain’s Kansas City data center (KCM-1) is a resilient, compliant and highly secure underground colocation complex located south of downtown Kansas City, Missouri. The underground data center is part of a 22-acre campus located 110 feet below the earth’s surface.
12.30 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.45 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.59 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.86 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.88 miles Hyperscale Data Center Request Dataset
Google has submitted final plans for its Rocky Branch Creek Technology Park data center in Northland, Kansas City, Missouri.
13.52 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Kansas City Campus in Missouri.
13.57 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Kansas City Campus in Missouri.
13.62 miles Hyperscale Data Center Request Dataset
In 2025, Meta Platforms (formerly known as Facebook) launched a data center campus in Kansas City, Missouri, located at 801 NW 128th Street.
14.98 miles Rackspace Kansas City MC1
Raised Flooring: 15,256 sq ft 2.5 MW Total Utility Power Manned 24x7x365
15.13 miles Lincoln Rackhouse KC (Airworld)
The campus is a former Bank of America facility in Kansas City’s northland.
15.42 miles TierPoint Kansas City
Outside of 500-year flood plain 6kW per cabinet capacity Newly upgraded 2MVA utility power feed 1MW diesel generator for all critical loads 2N UPS with redundant battery strings
18.62 miles Real Estate Data Center Request Dataset
Port KC has officially announced the planning and development of a massive $100 billion data center campus in the Northland area, a project internally known as Project Kestrel.
18.67 miles Netrality: Kansas City 7801 Nieman
18.77 miles Real Estate Data Center Request Dataset
19.06 miles DataBank Pine Ridge KC2
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.

LightEdge Kansas City Data Center Photos (See all)

Operating Company

Operated by:

Founded in 1996, LightEdge is a enterprise-grade cloud service provider, colocation and consulting company.

LightEdge is ISO 20000-1, SSAE 16 SOC 1 and SSAE 16 SOC 2 certified with Data Center operations meeting the stringent PCI-DSS and HIPAA compliance requirements.

LightEdge is privately held with the Anschutz Corporation being the largest investor.

16
Facilities
6
Markets
37MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?