|
0.47 miles
|
Joe's Datacenter Kansas City
|
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
|
|
0.66 miles
|
Patmos: Kansas City
|
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
|
|
0.66 miles
|
Nebius: Kansas City
|
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
|
|
0.83 miles
|
Contegix Mainmark
|
The site was acquired in late 2016 when Contegix acquired Admo.
|
|
0.93 miles
|
IP Pathways: Kansas City
|
The facility was acquired from Netsolus in 2023.
|
|
0.99 miles
|
Lumen Kansas City 4
|
|
|
1.00 miles
|
1102 Grand St (Netrality) Kansas City Carrier Hotel
|
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
|
|
1.00 miles
|
Contegix 1102 Grand
|
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
|
|
1.03 miles
|
Lumen Kansas City 1
|
|
|
1.31 miles
|
Revitalization Unlimited
|
Kansas City officials unanimously rejected a proposal to build a data center spanning 20 stories at 304 W. 10th Street in August 2026.
|
|
3.24 miles
|
Nocix 2 (1530 Swift)
|
|
|
3.29 miles
|
NOCIX
|
|
|
6.53 miles
|
Iron Mountain Kansas Underground
|
Iron Mountain’s Kansas City data center (KCM-1) is a resilient, compliant and highly secure underground colocation complex located south of downtown Kansas City, Missouri. The underground data center is part of a 22-acre campus located 110 feet below the earth’s surface.
|
|
7.22 miles
|
Edged Energy: Kansas City, MO
|
The facility known as Edged Kansas City is located in Kansas City, Missouri.
|
|
8.13 miles
|
LightEdge Kansas City
|
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
|
|
8.17 miles
|
Plaza ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.36 miles
|
PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.44 miles
|
East PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.46 miles
|
Station PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.00 miles
|
Metrobloks: MCI-A1
|
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q3 2027.
|
|
10.17 miles
|
Metrobloks: MCI-A2
|
This facility is part of the Metrobloks Kansas City campus in Missouri.
|
|
10.23 miles
|
Metrobloks: MCI-A3
|
This facility is part of the Metrobloks Kansas City campus in Missouri.
|
|
10.56 miles
|
Netrality: Kansas City 7801 Nieman
|
|
|
10.97 miles
|
DataBank Pine Ridge KC2
|
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.
|
|
12.89 miles
|
Patmos: Independence, Missouri
|
Patmos plans to convert a recently completed industrial warehouse in Independence into a high-density data center. The project entered the city’s permitting process before Independence adopted a temporary moratorium, allowing its application to continue through review.
|
|
13.53 miles
|
Nebius: Independence 1
|
European cloud firm Nebius is spearheading a massive AI data center campus in Independence, Missouri, positioned just outside Kansas City.
|
|
13.54 miles
|
Nebius: Independence 2
|
This facility is part of Nebius' Independence Campus in Kansas City.
|
|
13.72 miles
|
Nebius: Independence 3
|
This facility is part of Nebius' Independence Campus in Kansas City.
|
|
13.72 miles
|
Nebius: Independence 4
|
This facility is part of Nebius' Independence Campus in Kansas City.
|
|
13.97 miles
|
Consolidated Lenexa
|
Consolidated (CCI) data center located in the Southwest Kansas City metro.
|
|
14.43 miles
|
TierPoint Kansas City-Lenexa
|
Power Density: upto 20kW per cabinet
2 Utility transformers protected inside mechanical area/yard
Dedicated utility transformer for each UPS
|
|
14.56 miles
|
QTS Overland Park
|
The building also serves as QTS Headquarters
|
|
14.96 miles
|
Rackspace Kansas City MC1
|
Raised Flooring: 15,256 sq ft
2.5 MW Total Utility Power
Manned 24x7x365
|
|
15.14 miles
|
TierPoint Kansas City
|
Outside of 500-year flood plain
6kW per cabinet capacity
Newly upgraded 2MVA utility power feed
1MW diesel generator for all critical loads
2N UPS with redundant battery strings
|
|
15.27 miles
|
Lincoln Rackhouse KC (Airworld)
|
The campus is a former Bank of America facility in Kansas City’s northland.
|
|
15.27 miles
|
Lightedge: Lenexa (Cavern)
|
Located 125 feet underground within a three-million-square-foot limestone formation, the Lenexa facility was added to the LightEdge portfolio following the acquisition of Cavern Technologies in September 2021.
|
|
15.38 miles
|
Metro CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.59 miles
|
DataBank South Lake KC1
|
DataBank’s South Lake facility is situated in the technology-rich, South Kansas City suburb of Lenexa, providing direct, on-site connectivity to several Tier 1 carriers.
Powered by two separate substations with on-site, diesel-powered generators for backup, the data center includes 6,000+ sqft of space for customer equipment and advanced cooling technology to ensure optimal operating temperatures.
|
|
15.59 miles
|
UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.64 miles
|
Campus ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.75 miles
|
DataBank Kansas City MCI3
|
The expansion of the MCI3 data center in Lenexa, Kansas is now complete and offers an additional 17,000 square feet of raised flooring.
|
|
15.91 miles
|
CoreInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.07 miles
|
Ridge UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.11 miles
|
SouthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.12 miles
|
Edge PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.13 miles
|
Plaza AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.18 miles
|
Red Wolf DCD: Piper South
|
Three planned single-story buildings of about 330,000 sq ft each on the south tract of Red Wolf DCD's Piper campus, between Parallel Parkway and State Avenue east of North 126th Street in Kansas City, Kansas, with their own on-site substation.
|
|
16.73 miles
|
Red Wolf DCD: Piper North Expansion
|
Two planned single-story buildings of about 330,000 sq ft each on the north tract of Red Wolf DCD's Piper campus, beside the tract's on-site substation at 12504 Parallel Parkway, Kansas City, Kansas.
|
|
17.01 miles
|
Red Wolf DCD: Piper 1
|
Planned first building of Red Wolf DCD's Piper campus: a single-story data center of about 330,000 sq ft at the west end of the north tract, 13000 Parallel Parkway, Kansas City, Kansas. Power comes from an on-site substation on the Kansas City BPU system.
|
|
18.86 miles
|
Connect Data Centers: Olathe, KS
|
US investment firm Oppidan's Olathe data center spans 89,842 sq ft. Oppidan lists Connect Data Centers as a subsidiary.
|
|
18.89 miles
|
Park AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.05 miles
|
Central TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.14 miles
|
DigiCo: Kansas City KCM1
|
In January 2025, DigiCo Infrastructure REIT completed the acquisition of a mission-critical enterprise data center in Olathe, Kansas, as part of a larger portfolio deal with JDM III AZ LLC.
|
|
19.18 miles
|
Central PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.32 miles
|
North ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.43 miles
|
NorthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.60 miles
|
North TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|