Nebius: Kansas City

Site was first built in 2025 and has expansions through 2026
This site is leased from Patmos in the Patmos: Kansas City building
░░░░ Request Dataset MW
Operational Power

Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.

In early 2025, Nebius deployed an H200 cluster at the Patmos data center located in Kansas City, Missouri. Patmos has named Nebius as First Tenant in New Kansas City Data Center.

Map and Nearby Locations

1601 McGee St
Nebius Sites
Nearby Facilities

Nebius: Kansas City Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Nebius: Kansas City

Distance Site About
0.02 miles Patmos: Kansas City
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
0.22 miles Contegix Mainmark
The site was acquired in late 2016 when Contegix acquired Admo.
0.43 miles Lumen Kansas City 4
0.43 miles Contegix 1102 Grand
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
0.43 miles Lumen Kansas City 1
0.43 miles 1102 Grand St (Netrality) Kansas City Carrier Hotel
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
0.45 miles IP Pathways: Kansas City
The facility was acquired from Netsolus in 2023.
0.66 miles Lumen Kansas City 3
0.67 miles Joe's Datacenter Kansas City
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
0.69 miles Revitalization Unlimited
Kansas City officials unanimously rejected a proposal to build a data center spanning 20 stories at 304 W. 10th Street in August 2026.
2.91 miles Nocix 2 (1530 Swift)
2.95 miles NOCIX
7.11 miles Iron Mountain Kansas Underground
Iron Mountain’s Kansas City data center (KCM-1) is a resilient, compliant and highly secure underground colocation complex located south of downtown Kansas City, Missouri. The underground data center is part of a 22-acre campus located 110 feet below the earth’s surface.
7.52 miles Edged Energy: Kansas City, MO
The facility known as Edged Kansas City is located in Kansas City, Missouri.
8.40 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.44 miles LightEdge Kansas City
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
8.54 miles Ridge ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.64 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.67 miles Central StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.14 miles Metrobloks: MCI-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q3 2027.
10.31 miles Metrobloks: MCI-A2
This facility is part of the Metrobloks Kansas City campus in Missouri.
10.34 miles Netrality: Kansas City 7801 Nieman
10.38 miles Metrobloks: MCI-A3
This facility is part of the Metrobloks Kansas City campus in Missouri.
10.80 miles DataBank Pine Ridge KC2
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.
13.51 miles Patmos: Independence, Missouri
Patmos plans to convert a recently completed industrial warehouse in Independence into a high-density data center. The project entered the city’s permitting process before Independence adopted a temporary moratorium, allowing its application to continue through review.
13.75 miles Consolidated Lenexa
Consolidated (CCI) data center located in the Southwest Kansas City metro.
14.11 miles Nebius: Independence 1
European cloud firm Nebius is spearheading a massive AI data center campus in Independence, Missouri, positioned just outside Kansas City.
14.12 miles Nebius: Independence 2
This facility is part of Nebius' Independence Campus in Kansas City.
14.24 miles TierPoint Kansas City-Lenexa
Power Density: upto 20kW per cabinet 2 Utility transformers protected inside mechanical area/yard Dedicated utility transformer for each UPS
14.30 miles Nebius: Independence 4
This facility is part of Nebius' Independence Campus in Kansas City.
14.31 miles Nebius: Independence 3
This facility is part of Nebius' Independence Campus in Kansas City.
14.47 miles Rackspace Kansas City MC1
Raised Flooring: 15,256 sq ft 2.5 MW Total Utility Power Manned 24x7x365
14.61 miles QTS Overland Park
The building also serves as QTS Headquarters
14.63 miles TierPoint Kansas City
Outside of 500-year flood plain 6kW per cabinet capacity Newly upgraded 2MVA utility power feed 1MW diesel generator for all critical loads 2N UPS with redundant battery strings
14.78 miles Lincoln Rackhouse KC (Airworld)
The campus is a former Bank of America facility in Kansas City’s northland.
15.00 miles Lightedge: Lenexa (Cavern)
Located 125 feet underground within a three-million-square-foot limestone formation, the Lenexa facility was added to the LightEdge portfolio following the acquisition of Cavern Technologies in September 2021.
15.09 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.29 miles Edge CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.35 miles South ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.40 miles DataBank South Lake KC1
DataBank’s South Lake facility is situated in the technology-rich, South Kansas City suburb of Lenexa, providing direct, on-site connectivity to several Tier 1 carriers. Powered by two separate substations with on-site, diesel-powered generators for backup, the data center includes 6,000+ sqft of space for customer equipment and advanced cooling technology to ensure optimal operating temperatures.
15.55 miles Red Wolf DCD: Piper South
Three planned single-story buildings of about 330,000 sq ft each on the south tract of Red Wolf DCD's Piper campus, between Parallel Parkway and State Avenue east of North 126th Street in Kansas City, Kansas, with their own on-site substation.
15.57 miles DataBank Kansas City MCI3
The expansion of the MCI3 data center in Lenexa, Kansas is now complete and offers an additional 17,000 square feet of raised flooring.
15.61 miles Global TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.78 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.78 miles Tower BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.78 miles Global ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.79 miles Global RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.09 miles Red Wolf DCD: Piper North Expansion
Two planned single-story buildings of about 330,000 sq ft each on the north tract of Red Wolf DCD's Piper campus, beside the tract's on-site substation at 12504 Parallel Parkway, Kansas City, Kansas.
16.37 miles Red Wolf DCD: Piper 1
Planned first building of Red Wolf DCD's Piper campus: a single-story data center of about 330,000 sq ft at the west end of the north tract, 13000 Parallel Parkway, Kansas City, Kansas. Power comes from an on-site substation on the Kansas City BPU system.
18.40 miles Park BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.53 miles Connect Data Centers: Olathe, KS
US investment firm Oppidan's Olathe data center spans 89,842 sq ft. Oppidan lists Connect Data Centers as a subsidiary.
18.55 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.67 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.81 miles DigiCo: Kansas City KCM1
In January 2025, DigiCo Infrastructure REIT completed the acquisition of a mission-critical enterprise data center in Olathe, Kansas, as part of a larger portfolio deal with JDM III AZ LLC.
18.83 miles Ridge PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.94 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.09 miles Edge PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Nebius: Kansas City Data Center Photos See all

Patmos data center in Kansas City welcomes Nebius as its first tenant
Source: Business Wire

Operating Company

Operated by:

The Nebius AI Cloud brings powerful full-stack infrastructure for AI developers and practitioners across startups, enterprises and science institutes to build and deploy generative AI applications and rapidly deliver scientific breakthroughs by training and running ML models within a secure, high-performance, and cost-optimized cloud environment.

0
Facilities
0
Markets

News See all

Read Nebius Signs Preliminary Framework for 50MW at NEOM's Oxagon Campus
[HUMAIN](https://baxtel.com/data-centers/humain) and [DataVolt](https://baxtel.com/data-centers/datavolt) signed a preliminary framework agreement with [Nebius](https://baxtel.com/data-centers/nebi...

Nebius Signs Preliminary Framework for 50MW at NEOM's Oxagon Campus

October 22, 2026 Nebius

HUMAIN and DataVolt signed a preliminary framework agreement with Nebius for up to 50MW at Oxagon, the industrial city in Saudi Arabia's NEOM development. NEOM announced the framework on October 21, naming the AI cloud company an anchor customer at a giga campus already under construction....

Read more
Read Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory
[VOLT](https://baxtel.com/data-centers/volt-data-centers) has lined up [Nebius](https://baxtel.com/data-centers/nebius) as the first off-taker at its [Rotterdam AI Gigafactory](https://fromvolt.com...

Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory

October 13, 2026 Nebius

VOLT has lined up Nebius as the first off-taker at its Rotterdam AI Gigafactory, the anchor customer the Dutch developer needs before it can take a 600 MW campus at the Port of Rotterdam to lenders. The letter of intent, announced Monday, covers a long-term lease, with a first phase of two...

Read more
Read Nebius Signs LOI With Volt for Rotterdam Data Center Capacity
AI cloud provider Nebius has signed an LOI with Volt to become the first offtaker at its planned AI Gigafactory in Rotterdam, the Netherlands. The campus is planned to deliver 600MW across six buil...

Nebius Signs LOI With Volt for Rotterdam Data Center Capacity

October 13, 2026 Nebius

AI cloud provider Nebius has signed an LOI with Volt to become the first offtaker at its planned AI Gigafactory in Rotterdam, the Netherlands. The campus is planned to deliver 600MW across six buildings, with the first phase comprising two 100MW data centers. The initial phase is expected to cost...

Read more
Read Nebius Signs 50MW Data Center Lease With AIB Data Centers
Neocloud provider Nebius has signed a 12-year capacity agreement with AIB Data Centers to lease 50MW at a data center in the southeastern US. The deal includes two five-year renewal options. Nebius...

Nebius Signs 50MW Data Center Lease With AIB Data Centers

October 02, 2026 Nebius

Neocloud provider Nebius has signed a 12-year capacity agreement with AIB Data Centers to lease 50MW at a data center in the southeastern US. The deal includes two five-year renewal options. Nebius will make prepayments to AIB, alongside project-level debt and equity, to help fund the data...

Read more
Read Nebius Reports 32x Emissions Increase Amid Rapid Data Center Expansion
European neocloud provider Nebius reported a 32x increase in carbon emissions over the past year, driven by rapid data center expansion. In its 2025 sustainability report, the company recorded 65,0...

Nebius Reports 32x Emissions Increase Amid Rapid Data Center Expansion

July 31, 2026 Nebius

European neocloud provider Nebius reported a 32x increase in carbon emissions over the past year, driven by rapid data center expansion. In its 2025 sustainability report, the company recorded 65,001 tons of CO2e in combined Scope 1 and Scope 2 market-based emissions, up from 2,036 tons in 2024....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?