|
0.10 miles
|
Digital Realty: Astra North F
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
0.12 miles
|
Digital Realty: Astra North D
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
0.20 miles
|
Digital Realty: Astra North G
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
0.28 miles
|
Digital Realty: Astra North C
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
0.34 miles
|
Digital Realty: Astra North H
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
0.37 miles
|
Digital Realty: Astra North B
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
0.40 miles
|
Digital Realty: Astra North A
|
Digital Realty (DRT) has acquired approximately 1,440 acres of powered land at the Astra Enterprise Park in De Soto, Kansas from Sunflower Redevelopment Group for $475 million.
|
|
0.44 miles
|
Digital Realty: Astra North I
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
1.25 miles
|
Digital Realty: Astra South Campus
|
Serving as the De Soto campus's future expansion area, Astra South offers additional land and buildable square footage to accommodate long-term hyperscale growth.
|
|
1.88 miles
|
Beale: De Soto 4
|
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
|
|
2.09 miles
|
Beale: De Soto 3
|
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
|
|
2.13 miles
|
Beale: De Soto 2
|
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
|
|
2.37 miles
|
Beale: De Soto 1
|
Dubbed ‘Project Pilot’, the data center will be built in four phases on a 290-acre site.
|
|
6.42 miles
|
DigiCo: Kansas City KCM1
|
In January 2025, DigiCo Infrastructure REIT completed the acquisition of a mission-critical enterprise data center in Olathe, Kansas, as part of a larger portfolio deal with JDM III AZ LLC.
|
|
6.80 miles
|
Connect Data Centers: Olathe, KS
|
US investment firm Oppidan's Olathe data center spans 89,842 sq ft. Oppidan lists Connect Data Centers as a subsidiary.
|
|
9.88 miles
|
QTS: New Century Commerce Center
|
The company has leased a substantial 756,000 square foot (70,234 sqm) facility, identified as Building B1, within the New Century Commerce Center (NCCC) in New Century, Kansas.
|
|
10.58 miles
|
Lightedge: Lenexa (Cavern)
|
Located 125 feet underground within a three-million-square-foot limestone formation, the Lenexa facility was added to the LightEdge portfolio following the acquisition of Cavern Technologies in September 2021.
|
|
11.75 miles
|
DataBank Kansas City MCI3
|
The expansion of the MCI3 data center in Lenexa, Kansas is now complete and offers an additional 17,000 square feet of raised flooring.
|
|
11.84 miles
|
DataBank South Lake KC1
|
DataBank’s South Lake facility is situated in the technology-rich, South Kansas City suburb of Lenexa, providing direct, on-site connectivity to several Tier 1 carriers.
Powered by two separate substations with on-site, diesel-powered generators for backup, the data center includes 6,000+ sqft of space for customer equipment and advanced cooling technology to ensure optimal operating temperatures.
|
|
12.19 miles
|
Consolidated Lenexa
|
Consolidated (CCI) data center located in the Southwest Kansas City metro.
|
|
12.34 miles
|
DAMAC: Project Heartland
|
DAMAC Digital plans to convert an existing Logistics Park Kansas City warehouse in Edgerton into its Project Heartland data center.
|
|
12.46 miles
|
TierPoint Kansas City-Lenexa
|
Power Density: upto 20kW per cabinet
2 Utility transformers protected inside mechanical area/yard
Dedicated utility transformer for each UPS
|
|
12.64 miles
|
Beale: Gardner Campus
|
Proposed by Blue Owl-backed Beale Infrastructure, Project Brewer was a massive hyperscale data center campus slated for an approximately 300-acre site in Gardner, Kansas.
|
|
13.75 miles
|
Red Wolf DCD: Piper South
|
Three planned single-story buildings of about 330,000 sq ft each on the south tract of Red Wolf DCD's Piper campus, between Parallel Parkway and State Avenue east of North 126th Street in Kansas City, Kansas, with their own on-site substation.
|
|
13.93 miles
|
Red Wolf DCD: Piper 1
|
Planned first building of Red Wolf DCD's Piper campus: a single-story data center of about 330,000 sq ft at the west end of the north tract, 13000 Parallel Parkway, Kansas City, Kansas. Power comes from an on-site substation on the Kansas City BPU system.
|
|
14.13 miles
|
Red Wolf DCD: Piper North Expansion
|
Two planned single-story buildings of about 330,000 sq ft each on the north tract of Red Wolf DCD's Piper campus, beside the tract's on-site substation at 12504 Parallel Parkway, Kansas City, Kansas.
|
|
14.95 miles
|
Netrality: Kansas City 7801 Nieman
|
|
|
15.03 miles
|
DataBank Pine Ridge KC2
|
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.
|
|
16.40 miles
|
Colossus: Spring Hill, Kansas
|
In a sudden reversal, data center consultancy firm Colossus Data Center Advisors has abruptly withdrawn its proposal to build a massive 316-acre data center campus in Spring Hill, Kansas.
|
|
17.24 miles
|
QTS Overland Park
|
The building also serves as QTS Headquarters
|