DataBank Kansas City MCI3

Latest Podcast
11200 Lakeview Ave
Operational
Fully operational facility
Operated by:

DataBank Kansas City MCI3

Year Built: 2019
░░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

The expansion of the MCI3 data center in Lenexa, Kansas is now complete and offers an additional 17,000 square feet of raised flooring. The total build-out is now 42,000 sq. ft.

Map and Nearby Locations:

11200 Lakeview Ave
DataBank Sites
Nearby Facilities

Sites within 15 miles of DataBank Kansas City MCI3

Distance Site About
0.16 miles DataBank South Lake KC1
DataBank’s South Lake facility is situated in the technology-rich, South Kansas City suburb of Lenexa, providing direct, on-site connectivity to several Tier 1 carriers. Powered by two separate substations with on-site, diesel-powered generators for backup, the data center includes 6,000+ sqft of space for customer equipment and advanced cooling technology to ensure optimal operating temperatures.
1.33 miles TierPoint Kansas City-Lenexa
Power Density: upto 20kW per cabinet 2 Utility transformers protected inside mechanical area/yard Dedicated utility transformer for each UPS
2.04 miles Consolidated Lenexa
Consolidated (CCI) data center located in the Southwest Kansas City metro.
2.12 miles Lightedge: Lenexa (Cavern)
Located 125 feet underground within a three-million-square-foot limestone formation, the Lenexa facility was added to the LightEdge portfolio following the acquisition of Cavern Technologies in September 2021.
4.78 miles DataBank Pine Ridge KC2
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.
4.96 miles Connect Data Centers: Olathe, KS
US investment firm Oppidan's Olathe data center spans 89,842 sq ft. Oppidan lists Connect Data Centers as a subsidiary.
5.26 miles Netrality: Kansas City 7801 Nieman
5.34 miles DigiCo: Kansas City KCM1
In January 2025, DigiCo Infrastructure REIT completed the acquisition of a mission-critical enterprise data center in Olathe, Kansas, as part of a larger portfolio deal with JDM III AZ LLC.
5.58 miles QTS Overland Park
The building also serves as QTS Headquarters
8.30 miles QTS: New Century Commerce Center
The company has leased a substantial 756,000 square foot (70,234 sqm) facility, identified as Building B1, within the New Century Commerce Center (NCCC) in New Century, Kansas.
13.62 miles Beale: De Soto 4
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
13.80 miles Beale: De Soto 2
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
13.84 miles Beale: De Soto 3
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
14.04 miles Beale: De Soto, KS
Dubbed ‘Project Pilot’, the data center will be built in four phases on a 290-acre site.
14.71 miles 1102 Grand St (Netrality) Kansas City Carrier Hotel
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
15.37 miles Contegix Mainmark
The site was acquired in late 2016 when Contegix acquired Admo.
15.46 miles Iron Mountain Kansas Underground
Iron Mountain’s Kansas City data center (KCM-1) is a resilient, compliant and highly secure underground colocation complex located south of downtown Kansas City, Missouri. The underground data center is part of a 22-acre campus located 110 feet below the earth’s surface.
15.48 miles Red Wolf DCD: Kansas City, KS
Red Wolf DCD Properties LLC intends to construct a substantial 400-acre data center campus featuring six buildings totaling 1.8 million square feet and two on-site substations.
15.53 miles Red Wolf DCD: Kansas Expansion
15.55 miles Patmos: Kansas City
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
15.57 miles Nebius: Kansas City
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
15.75 miles Lumen Kansas City 3
15.77 miles Lumen Kansas City 1
15.82 miles Lumen Kansas City 4
15.82 miles Contegix 1102 Grand
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
15.92 miles IP Pathways: Kansas City
The facility was acquired from Netsolus in 2023.
16.13 miles Joe's Datacenter Kansas City
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
17.91 miles NOCIX
17.92 miles Nocix 2 (1530 Swift)
19.68 miles Diode Ventures: Peculiar, MO
The proposed Harper Road Technology Park by Diode Ventures, a $1.5 billion data center project planned for 508 acres in Peculiar, Missouri, was ultimately blocked by local authorities in October 2024.

DataBank Kansas City MCI3 Data Center Photos (See all)

Aerial View of KC3 Facility
Source: DataBank
The transport ring connects DataBank's three KC data centers as well as 1102 Grand, Kansas City's telecom hotel
DataBank has a Metro Optical Transport Ring in KC
Source: DataBank

The transport ring connects DataBank's three KC data centers as well as 1102 Grand, Kansas City's telecom hotel

Conduits!
Source: DataBank

Operating Company

Operated by:

DataBank is a data center developer and operator that provides colocation, interconnection, cloud and managed services. Founded in 2005 and headquartered in Dallas, the company expanded its footprint through acquisitions and new builds.

Following the December 2020 close of its purchase of zColo assets from Zayo, DataBank reported operating 60 data centers across 28 markets in the U.S. and the U.K. In October 2024, DataBank announced an approximately $2.0 billion equity raise led by AustralianSuper to support new campuses in Dallas, Culpeper and Atlanta.

DataBank History:

  • In October 2024, announced an approximately $2.0 billion equity raise led by AustralianSuper to fund development of new campuses in Dallas, Culpeper, and Atlanta.
  • In December 2020, Databank closed the acquisition of zColo data center assets in the U.S. and U.K. from Zayo.
  • In January 2017, Boca Raton-based Digital Bridge Holdings acquired DataBank. DataBank will continue to operate independently
  • Also in January 2017 DataBank separately acquired C7 Data Centers and C7's four Utah data centers.
  • In January 2017, acquired facilities in Cleveland and Pittsburgh from 365 Data Centers.
  • In July 2016, acquired by Digital Bridge Holdings from Avista Capital Partners.
  • Founded in 2005 in Dallas, Texas.
86
Facilities
23
Markets
423MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?