Edged Energy: Kansas City, MO

Latest Podcast 3420 N Arlington Ave
Under ConstructionOperational
Fully operational with expansion in progress
Operated by:

Edged Energy: Kansas City, MO

Short Code: MCI01-1
Site was first built in 2024 and has expansions through 2026
PUE: 1.15
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

The facility known as Edged Kansas City is located in Kansas City, Missouri. The facility operates using a ThermalWorks waterless cooling system to save nearly 95 million gallons of water each year compared to conventional data centers

  • Edged Energy is part of Endeavour, which was set up by Aligned founder Jakob Carnemark.
  • The company guarantees “net zero digital infrastructure,” and claims that its data centers will have a PUE of 1.15 even in the “hottest climates.

Map and Nearby Locations

3420 N Arlington Ave
Edged Energy Sites
Nearby Facilities

Edged Energy: Kansas City, MO Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Edged Energy: Kansas City, MO

Distance Site About
0.92 miles LightEdge Kansas City
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
1.28 miles Point OneInterested in this information?Contact us
Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.
1.67 miles Ridge OneInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
1.77 miles Campus AlphaInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
1.84 miles Core CenterInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
3.44 miles Metrobloks: Kansas City MCI-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q3 2027.
3.58 miles Metrobloks: MCI-A2
This facility is part of the Metrobloks Kansas City campus in Missouri.
3.59 miles Metrobloks: MCI-A3
This facility is part of the Metrobloks Kansas City campus in Missouri.
6.23 miles Nocix 2 (1530 Swift)
6.28 miles NOCIX
6.89 miles Joe's Datacenter Kansas City
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
7.22 miles Lumen Kansas City 3
7.25 miles IP Pathways: Kansas City
The facility was acquired from Netsolus in 2023.
7.37 miles 1102 Grand St (Netrality) Kansas City Carrier Hotel
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
7.37 miles Lumen Kansas City 4
7.38 miles Contegix 1102 Grand
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
7.44 miles Lumen Kansas City 1
7.52 miles Nebius: Kansas City
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
7.53 miles Patmos: Kansas City
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
7.74 miles Contegix Mainmark
The site was acquired in late 2016 when Contegix acquired Admo.
8.85 miles Nebius: Independence 2
This facility is part of Nebius' Independence Campus in Kansas City.
8.95 miles Nebius: Independence Campus
European cloud firm Nebius is spearheading a massive AI data center campus in Independence, Missouri, positioned just outside Kansas City.
8.96 miles Nebius: Independence 4
This facility is part of Nebius' Independence Campus in Kansas City.
9.07 miles Nebius: Independence 3
This facility is part of Nebius' Independence Campus in Kansas City.
9.34 miles Patmos: Independence, Missouri
Patmos plans to convert a recently completed industrial warehouse in Independence into a high-density data center. The project entered the city’s permitting process before Independence adopted a temporary moratorium, allowing its application to continue through review.
10.36 miles Iron Mountain Kansas Underground
Iron Mountain’s Kansas City data center (KCM-1) is a resilient, compliant and highly secure underground colocation complex located south of downtown Kansas City, Missouri. The underground data center is part of a 22-acre campus located 110 feet below the earth’s surface.
12.28 miles TowerInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.44 miles North ParkInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.56 miles Hub OneInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.84 miles Campus GammaInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.88 miles Central RidgeInterested in this information?Contact us
Google has submitted final plans for its Rocky Branch Creek Technology Park data center in Northland, Kansas City, Missouri.
13.45 miles GammaInterested in this information?Contact us
This facility is part of Meta's Kansas City Campus in Missouri.
13.49 miles Edge StationInterested in this information?Contact us
This facility is part of Meta's Kansas City Campus in Missouri.
13.54 miles Central PointInterested in this information?Contact us
In 2025, Meta Platforms (formerly known as Facebook) launched a data center campus in Kansas City, Missouri, located at 801 NW 128th Street.
14.61 miles Rackspace Kansas City MC1
Raised Flooring: 15,256 sq ft 2.5 MW Total Utility Power Manned 24x7x365
14.78 miles Lincoln Rackhouse KC (Airworld)
The campus is a former Bank of America facility in Kansas City’s northland.
15.03 miles TierPoint Kansas City
Outside of 500-year flood plain 6kW per cabinet capacity Newly upgraded 2MVA utility power feed 1MW diesel generator for all critical loads 2N UPS with redundant battery strings
17.77 miles Netrality: Kansas City 7801 Nieman
18.07 miles Hub AlphaInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
18.16 miles DataBank Pine Ridge KC2
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.
18.39 miles West PointInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
18.40 miles Center PlusInterested in this information?Contact us
Project Kestrel, a major new data center development, is officially taking flight in Kansas City, Missouri, following the acquisition of 430 acres of land near the Kansas City International Airport by Google affiliate Shenandoah Computing LLC.
18.65 miles CenterInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
18.68 miles Point UltraInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
18.97 miles Prime HubInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.

Edged Energy: Kansas City, MO Data Center Photos See all

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

44
Facilities
23
Markets

News See all

Read Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion
Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

May 29, 2026 Edged Energy

US data center developer Edged has secured nearly $2 billion in financing so far this year to support the expansion of its data center portfolio. The company said the capital will be used to advance projects in key markets, including Atlanta, Chicago, and Council Bluffs. The funding package...

Read more
Read Edged Opens 36MW Data Center in Phoenix, Arizona
Edged Opens 36MW Data Center in Phoenix, Arizona

Edged Opens 36MW Data Center in Phoenix, Arizona

April 08, 2026 Edged Energy

US operator Edged has launched a new data center in Phoenix, Arizona. The Endeavour-owned company this month announced the opening of its PHX01-1 facility. Situated on a 12-acre site at 8811 E. Warner Road in Mesa, Maricopa County, the two-story building delivers 36MW of capacity across 210,000...

Read more
Read Edged secures permission for second data center at Irving campus, Tex
Edged secures permission for second data center at Irving campus, Tex

Edged secures permission for second data center at Irving campus, Tex

January 17, 2026 Edged Energy

Data center operator Edged this week announced plans to add a second data center to its Edged Dallas campus in Irving, Dallas County. The news follows Irving City Council voting unanimously to approve the expansion, which will be located on North Wildwood Drive in the industrial area east of...

Read more
Read Edged Breaks Ground on Second Chicago Faciity
Edged Breaks Ground on Second Chicago Faciity

Edged Breaks Ground on Second Chicago Faciity

November 21, 2025 Edged Energy

Data center firm Edged has broken ground on a second data center in Chicago, Illinois. Located at 2835 Bilter Road, the new facility will be purpose-built for high-density AI workloads and feature advanced closed-loop, waterless cooling. The facility will go live in Q2 2027. “Safety and...

Read more
Read Edged Opens Data Center in New Albany, Ohio
Edged Opens Data Center in New Albany, Ohio

Edged Opens Data Center in New Albany, Ohio

September 24, 2025 Edged Energy

Data center operator Edged recently celebrated the opening of its newest data center in New Albany. Tthe two-story facility delivers 24MW of capacity across 206,000 sq ft (19,140 sqm).“This project would not have been possible without the support of the City of New Albany, who has been unwavering...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?