Nocix 2 (1530 Swift)

Latest Podcast
1530 Swift St
Operational
Fully operational facility
Operated by:

Nocix 2 (1530 Swift)

░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

Map and Nearby Locations:

1530 Swift St
NOCIX Sites
Nearby Facilities

Sites within 15 miles of Nocix 2 (1530 Swift)

Distance Site About
0.07 miles NOCIX
2.47 miles IP Pathways: Kansas City
The facility was acquired from Netsolus in 2023.
2.50 miles Lumen Kansas City 4
2.50 miles Contegix 1102 Grand
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
2.52 miles Lumen Kansas City 1
2.80 miles Joe's Datacenter Kansas City
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
2.91 miles Nebius: Kansas City
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
2.93 miles Patmos: Kansas City
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
3.01 miles Contegix Mainmark
The site was acquired in late 2016 when Contegix acquired Admo.
3.24 miles Lumen Kansas City 3
3.69 miles 1102 Grand St (Netrality) Kansas City Carrier Hotel
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
6.23 miles Edged Energy: Kansas City, MO
The facility known as Edged Kansas City is located in Kansas City, Missouri.
6.68 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Kansas City Campus in Missouri.
6.73 miles Hyperscale Data Center Request Dataset
Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.
6.82 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Kansas City Campus in Missouri.
6.91 miles Hyperscale Data Center Request Dataset
This data center is a part of Google's Kansas City Campus in Missouri.
7.12 miles LightEdge Kansas City
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
8.07 miles Metrobloks: Kansas City MCI-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q4 2027.
9.60 miles Iron Mountain Kansas Underground
Iron Mountain’s Kansas City data center (KCM-1) is a resilient, compliant and highly secure underground colocation complex located south of downtown Kansas City, Missouri. The underground data center is part of a 22-acre campus located 110 feet below the earth’s surface.
11.83 miles Rackspace Kansas City MC1
Raised Flooring: 15,256 sq ft 2.5 MW Total Utility Power Manned 24x7x365
12.05 miles TierPoint Kansas City
Outside of 500-year flood plain 6kW per cabinet capacity Newly upgraded 2MVA utility power feed 1MW diesel generator for all critical loads 2N UPS with redundant battery strings
12.13 miles Lincoln Rackhouse KC (Airworld)
The campus is a former Bank of America facility in Kansas City’s northland.
12.18 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.38 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.44 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.66 miles Netrality: Kansas City 7801 Nieman
12.70 miles Hyperscale Data Center Request Dataset
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
12.87 miles Hyperscale Data Center Request Dataset
Google has submitted final plans for its Rocky Branch Creek Technology Park data center in Northland, Kansas City, Missouri.
12.88 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Kansas City Campus in Missouri.
12.89 miles Hyperscale Data Center Request Dataset
In 2025, Meta Platforms (formerly known as Facebook) launched a data center campus in Kansas City, Missouri, located at 801 NW 128th Street.
12.89 miles Hyperscale Data Center Request Dataset
This facility is part of Meta's Kansas City Campus in Missouri.
13.21 miles DataBank Pine Ridge KC2
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.
14.39 miles Nebius: Independence Campus
European cloud firm Nebius is spearheading a massive AI data center campus in Independence, Missouri, positioned just outside Kansas City.
16.00 miles Consolidated Lenexa
Consolidated (CCI) data center located in the Southwest Kansas City metro.
16.02 miles Real Estate Data Center Request Dataset
Port KC has officially announced the planning and development of a massive $100 billion data center campus in the Northland area, a project internally known as Project Kestrel.
16.16 miles Red Wolf DCD: Kansas Expansion
16.22 miles Real Estate Data Center Request Dataset
16.23 miles Red Wolf DCD: Kansas City, KS
Red Wolf DCD Properties LLC intends to construct a substantial 400-acre data center campus featuring six buildings totaling 1.8 million square feet and two on-site substations.
16.59 miles TierPoint Kansas City-Lenexa
Power Density: upto 20kW per cabinet 2 Utility transformers protected inside mechanical area/yard Dedicated utility transformer for each UPS
17.12 miles Lightedge: Lenexa (Cavern)
Located 125 feet underground within a three-million-square-foot limestone formation, the Lenexa facility was added to the LightEdge portfolio following the acquisition of Cavern Technologies in September 2021.
17.40 miles QTS Overland Park
The building also serves as QTS Headquarters
17.75 miles DataBank South Lake KC1
DataBank’s South Lake facility is situated in the technology-rich, South Kansas City suburb of Lenexa, providing direct, on-site connectivity to several Tier 1 carriers. Powered by two separate substations with on-site, diesel-powered generators for backup, the data center includes 6,000+ sqft of space for customer equipment and advanced cooling technology to ensure optimal operating temperatures.
17.92 miles DataBank Kansas City MCI3
The expansion of the MCI3 data center in Lenexa, Kansas is now complete and offers an additional 17,000 square feet of raised flooring.

Nocix 2 (1530 Swift) Data Center Photos (See all)

Operating Company

Operated by:

Formally known as "DataShack", Nocix is an affordable VPS and dedicated server provider based in Kansas City, MO

2
Facilities
1
Markets
20MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?