Diode Ventures Planning a 220MW Facility in Kansas
April 26, 2022
Kansas City
| Distance | Site | About |
|---|---|---|
| 0.07 miles | NOCIX | |
| 2.47 miles | IP Pathways: Kansas City |
The facility was acquired from Netsolus in 2023.
|
| 2.50 miles | Lumen Kansas City 4 | |
| 2.50 miles | Contegix 1102 Grand |
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
|
| 2.52 miles | Lumen Kansas City 1 | |
| 2.80 miles | Joe's Datacenter Kansas City |
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
|
| 2.91 miles | Nebius: Kansas City |
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
|
| 2.93 miles | Patmos: Kansas City |
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
|
| 3.01 miles | Contegix Mainmark |
The site was acquired in late 2016 when Contegix acquired Admo.
|
| 3.24 miles | Lumen Kansas City 3 | |
| 3.69 miles | 1102 Grand St (Netrality) Kansas City Carrier Hotel |
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
|
| 6.23 miles | Edged Energy: Kansas City, MO |
The facility known as Edged Kansas City is located in Kansas City, Missouri.
|
| 6.68 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Google's Kansas City Campus in Missouri.
|
| 6.73 miles | Hyperscale Data Center Request Dataset |
Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.
|
| 6.82 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Google's Kansas City Campus in Missouri.
|
| 6.91 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Google's Kansas City Campus in Missouri.
|
| 7.12 miles | LightEdge Kansas City |
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
|
| 8.07 miles | Metrobloks: Kansas City MCI-A1 |
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q4 2027.
|
| 9.60 miles | Iron Mountain Kansas Underground |
Iron Mountain’s Kansas City data center (KCM-1) is a resilient, compliant and highly secure underground colocation complex located south of downtown Kansas City, Missouri. The underground data center is part of a 22-acre campus located 110 feet below the earth’s surface.
|
| 11.83 miles | Rackspace Kansas City MC1 |
Raised Flooring: 15,256 sq ft
2.5 MW Total Utility Power
Manned 24x7x365
|
| 12.05 miles | TierPoint Kansas City |
Outside of 500-year flood plain
6kW per cabinet capacity
Newly upgraded 2MVA utility power feed
1MW diesel generator for all critical loads
2N UPS with redundant battery strings
|
| 12.13 miles | Lincoln Rackhouse KC (Airworld) |
The campus is a former Bank of America facility in Kansas City’s northland.
|
| 12.18 miles | Hyperscale Data Center Request Dataset |
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
|
| 12.38 miles | Hyperscale Data Center Request Dataset |
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
|
| 12.44 miles | Hyperscale Data Center Request Dataset |
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
|
| 12.66 miles | Netrality: Kansas City 7801 Nieman |
|
| 12.70 miles | Hyperscale Data Center Request Dataset |
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
|
| 12.87 miles | Hyperscale Data Center Request Dataset |
Google has submitted final plans for its Rocky Branch Creek Technology Park data center in Northland, Kansas City, Missouri.
|
| 12.88 miles | Hyperscale Data Center Request Dataset |
This facility is part of Meta's Kansas City Campus in Missouri.
|
| 12.89 miles | Hyperscale Data Center Request Dataset |
In 2025, Meta Platforms (formerly known as Facebook) launched a data center campus in Kansas City, Missouri, located at 801 NW 128th Street.
|
| 12.89 miles | Hyperscale Data Center Request Dataset |
This facility is part of Meta's Kansas City Campus in Missouri.
|
| 13.21 miles | DataBank Pine Ridge KC2 |
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.
|
| 14.39 miles | Nebius: Independence Campus |
European cloud firm Nebius is spearheading a massive AI data center campus in Independence, Missouri, positioned just outside Kansas City.
|
| 16.00 miles | Consolidated Lenexa |
Consolidated (CCI) data center located in the Southwest Kansas City metro.
|
| 16.02 miles | Real Estate Data Center Request Dataset |
Port KC has officially announced the planning and development of a massive $100 billion data center campus in the Northland area, a project internally known as Project Kestrel.
|
| 16.16 miles | Red Wolf DCD: Kansas Expansion | |
| 16.22 miles | Real Estate Data Center Request Dataset | |
| 16.23 miles | Red Wolf DCD: Kansas City, KS |
Red Wolf DCD Properties LLC intends to construct a substantial 400-acre data center campus featuring six buildings totaling 1.8 million square feet and two on-site substations.
|
| 16.59 miles | TierPoint Kansas City-Lenexa |
Power Density: upto 20kW per cabinet
2 Utility transformers protected inside mechanical area/yard
Dedicated utility transformer for each UPS
|
| 17.12 miles | Lightedge: Lenexa (Cavern) |
Located 125 feet underground within a three-million-square-foot limestone formation, the Lenexa facility was added to the LightEdge portfolio following the acquisition of Cavern Technologies in September 2021.
|
| 17.40 miles | QTS Overland Park |
The building also serves as QTS Headquarters
|
| 17.75 miles | DataBank South Lake KC1 |
DataBank’s South Lake facility is situated in the technology-rich, South Kansas City suburb of Lenexa, providing direct, on-site connectivity to several Tier 1 carriers.
Powered by two separate substations with on-site, diesel-powered generators for backup, the data center includes 6,000+ sqft of space for customer equipment and advanced cooling technology to ensure optimal operating temperatures.
|
| 17.92 miles | DataBank Kansas City MCI3 |
The expansion of the MCI3 data center in Lenexa, Kansas is now complete and offers an additional 17,000 square feet of raised flooring.
|
April 26, 2022
Kansas City
October 07, 2019
Kansas City
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas