|
0.00 miles
|
Contegix Toronto
|
|
|
0.00 miles
|
Beanfield 905 King St
|
Beanfield colocation suite inside 905 King Street West in Toronto's Liberty Village, on Beanfield's own fibre network.
|
|
0.00 miles
|
Cologix TOR3
|
Cologix's TOR3 data centre inside 905 King Street West in Toronto's Liberty Village, with diverse fibre to Cologix TOR1 at the 151 Front Street West carrier hotel.
|
|
0.01 miles
|
Telehouse: 905 King Street West
|
Telehouse Canada data centre at 905 King Street West in Toronto's Liberty Village, linked by dark fibre to the 151 and 250 Front Street West carrier hotels.
|
|
0.68 miles
|
Beanfield 23 Fraser
|
Beanfield's ground-level colocation facility at 23 Fraser Avenue in Toronto's Liberty Village, with its own generator, dual UPS and direct access to Beanfield's fibre network.
|
|
1.22 miles
|
Telehouse: 250 Front Street West
|
Telehouse Canada data centre in the Canadian Broadcasting Centre at 250 Front Street West, a block from the 151 Front Street West carrier hotel in downtown Toronto.
|
|
1.23 miles
|
Beanfield 250 Front St
|
Beanfield colocation at 250 Front Street West in the Canadian Broadcasting Centre block of downtown Toronto, with multi-cabinet halls cooled by Enwave deep-lake water.
|
|
1.40 miles
|
Beanfield 151 Front St
|
Beanfield colocation inside the 151 Front Street West carrier hotel in downtown Toronto, with boutique multi-cabinet halls cooled by Enwave deep-lake water.
|
|
1.40 miles
|
Hive DC: Toronto
|
Hive Data Center's highly connected TOR-1 site has extensive connectivity to Canada’s largest city and direct paths to the US Mid-west.
|
|
1.41 miles
|
3z Canada: 151 Front
|
|
|
1.42 miles
|
Cologix Toronto TOR1
|
Cologix operates seven discrete data centre suites at 151 Front Street West (TOR1), Canada's largest carrier hotel.
|
|
1.42 miles
|
Neutral Data Toronto
|
|
|
1.42 miles
|
Equinix Toronto TR1
|
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
|
|
1.42 miles
|
Amanah: TOR1
|
Located on the 3rd floor, TOR 1 is Amanah's primary data center suite.
|
|
1.42 miles
|
eStruxture TOR-1
|
eStruxture's TOR-1 colocation suites inside the 151 Front Street West carrier hotel in downtown Toronto, spread across four data halls on three floors.
|
|
1.42 miles
|
Priority Colo TOR1
|
|
|
1.42 miles
|
Digital Realty 151 Front
|
|
|
1.42 miles
|
Coloware: YTZ-1
|
Coloware's YTZ-1 data centre inside the 151 Front Street West carrier hotel in downtown Toronto, opened in 2020 and expanded in 2024.
|
|
1.43 miles
|
Amanah: TOR2
|
Situated on the 6th floor of the same building, TOR 2 serves as a high-availability extension of TOR 1.
|
|
1.44 miles
|
Telehouse: 151 Front Street West
|
Telehouse Canada's flagship carrier hotel at 151 Front Street West, beside Union Station in downtown Toronto. It is home to the Toronto Internet Exchange and to suites run by many colocation and network operators.
|
|
1.46 miles
|
eStruxture TOR-2
|
eStruxture's TOR-2 data centre on the eighth floor of 145 King Street West in Toronto's financial district, formerly Cogeco Peer 1 King Street.
|
|
1.52 miles
|
CentriLogic Toronto
|
CentriLogic's downtown Toronto data centre in Suite 300 at 55 York Street, a 16,000 sq ft managed services and colocation facility.
|
|
1.53 miles
|
Equinix Toronto TR4
|
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
|
|
1.66 miles
|
TNW Toronto
|
|
|
1.66 miles
|
Qscale: Toronto
|
Qscale, a Canadian company, plans to build a multi-billion-dollar data center in Toronto.
|
|
2.59 miles
|
Urbacon Toronto - 281 Front Street
|
At the intersection of Front Street East and Parliament Street, 281 Front is less than one and a half kilometres from Canada’s financial heart, and directly abutting 151 Front Street, which is Toronto's carrier hotel.
|
|
2.60 miles
|
Equinix Toronto TR2
|
TR2 is also known as Parliament Street Data Centre
TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems.
TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
|
|
5.08 miles
|
TELUS: Toronto Laird
|
TELUS's Toronto Intelligent Internet Data Centre at 73 Laird Drive in East York, a former PSINet facility. The City of Toronto has leased data centre space there since 2007.
|
|
5.53 miles
|
Whipcord Edge: Toronto TDC01
|
|
|
5.53 miles
|
Whipcord Edge: TDC01
|
|
|
5.62 miles
|
Beeches Development: East York, ON
|
Toronto-based Beeches Development Inc. has proposed a new data center in the Leaside business park, marking the third iteration of plans for the site at 154-156 Wicksteed Avenue.
|
|
6.46 miles
|
Centersquare: Etobicoke YYZ3
|
Centersquare's Toronto YYZ3 facility at 75-77 Fima Crescent, Etobicoke, a ~214,000 sq ft retrofit data center that Centersquare owns. It joined the portfolio in Centersquare's October 2025 ten-facility North American acquisition.
|
|
6.83 miles
|
eStruxture TOR-3 (Etobicoke)
|
eStruxture's TOR-3 data centre at 431 Horner Avenue in Etobicoke, west Toronto, with three data halls and natural gas and diesel backup generation.
|
|
7.09 miles
|
Lumen Toronto 1
|
|
|
7.49 miles
|
3z Canada: Etobicoke
|
|
|
8.17 miles
|
Stack: TOR01C
|
TOR01C is a proposed 212,000 sq ft building, the third phase of Stack Infrastructure's TOR01 campus in Scarborough, Toronto.
|
|
8.19 miles
|
Prime PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.25 miles
|
Stack: TOR01A
|
TOR01A is the first building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto. Developer First Gulf partnered with STACK to renovate the existing 89,000 sq ft building, delivered in September 2023.
|
|
8.25 miles
|
Stack: TOR01B
|
TOR01B is a proposed 217,000 sq ft building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto, in site plan review.
|
|
8.34 miles
|
ServerFarm Toronto TOR1
|
Site is approximately 7.14 acres
Three 10,000 SF data halls with ample office and conference space
|
|
8.46 miles
|
ILAP 210 Sheppard
|
|
|
9.10 miles
|
Cogent Mississauga
|
|
|
9.21 miles
|
Metro ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.48 miles
|
Canada Cloud Data Centre
|
|
|
9.73 miles
|
Cogent: Toronto
|
|
|
9.83 miles
|
Hut 8: Mississauga DC
|
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
|
|
10.16 miles
|
Compass: North York
|
Compass Datacenters' Toronto data centre at 15 Fenmar Drive in North York, a two-storey building completed in 2023 for a single hyperscale tenant.
|
|
11.45 miles
|
1 Century Place (TOR1) Digital Realty
|
Digital Realty's TOR1 wholesale data centre at 1 Century Place in Vaughan, just north of Toronto, built inside the former Toronto Star printing plant.
|
|
11.67 miles
|
CentriLogic Mississauga (South)
|
|
|
11.77 miles
|
Cogent: Mississauga 2
|
|
|
12.11 miles
|
Edgeconnex Toronto
|
EdgeConneX's Toronto edge data centre at 565 Gordon Baker Road in North York, a 38,900 sq ft facility opened in 2018.
|
|
12.32 miles
|
Hut 8: Vaughan DC
|
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
|
|
12.34 miles
|
Yondr: Toronto TOR1
|
The three-story facility, being built on a 4.5-acre plot, will feature closed-loop cooling technology. The project is expected to be ready for service by mid-2026.
|
|
12.46 miles
|
Urbacon: Toronto West DC7
|
DC7 is situated in a prime Toronto location accessible by transit and close to Canada's largest international transportation hub.
|
|
12.70 miles
|
TMX: Markham Colocation
|
TMX Group's colocation data centre at 3500 Steeles Avenue East in Markham, built for trading firms connecting to the Toronto Stock Exchange.
|
|
12.74 miles
|
Excell IT
|
|
|
12.77 miles
|
Content Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.82 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.92 miles
|
CentriLogic Mississauga (North)
|
18″ raised floor with hot/cold aisle configuration
24/7/365 Security & Multi-level Biometric Access Control
|
|
13.38 miles
|
Nüday Networks
|
|
|
13.63 miles
|
CentriLogic: Greater Toronto, ON
|
CentriLogic's 28,000 sq ft purpose-built data centre at 7445 Tranmere Drive in Mississauga, opened in August 2015 in a building that earlier housed a Dell data centre.
|
|
14.08 miles
|
PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.14 miles
|
North ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.19 miles
|
Moldenhauer: Mississauga
|
Moldenhauer's proposed data centre campus in southwest Mississauga, near Clarkson GO station.
|
|
14.19 miles
|
Rogers Markham TOR DC3
|
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
|
14.20 miles
|
Qu DC: TOR3
|
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
|
14.27 miles
|
Priority Colo TOR2
|
Priority Colo's TOR2 data centre at 600 Cochrane Drive in Markham, near Highways 404 and 7, built in 2013 for higher-density deployments.
|
|
14.28 miles
|
Kyndryl: Markham
|
|
|
14.30 miles
|
371 Gough - Digital Realty
|
Digital Realty's YYZ10 data centre at 371 Gough Road in Markham, a 120,000 sq ft building fitted out in phases from 2014. Digital Core REIT owns a 90% interest.
|
|
14.46 miles
|
Centersquare: Markham YYZ2
|
Centersquare's YYZ2 data centre at 4175 14th Avenue in Markham, opened by CenturyLink in August 2014 as its second Toronto-area facility.
|
|
14.69 miles
|
Equinix Markham TR5
|
|
|
14.86 miles
|
CORE: Markham
|
Former Core Data Centres colocation operation at 105 Clegg Road in Markham. Cologix bought the building in September 2025 and runs it as Cologix TOR5.
|
|
14.86 miles
|
Cologix TOR5
|
Cologix's TOR5 data centre at 105 Clegg Road in Markham, a purpose-built 40,000 sq ft facility next to Cologix TOR4.
|
|
14.86 miles
|
Cologix TOR4
|
Cologix's TOR4 data centre in Markham, a purpose-built facility completed in October 2023, with diverse dark fibre to Cologix TOR1 at 151 Front Street West.
|
|
14.97 miles
|
Valley GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.02 miles
|
Tower BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.09 miles
|
eStruxture TOR-4 Scarborough
|
eStruxture's TOR-4 data centre at 20 Pullman Court in north Scarborough, a purpose-built facility formerly known as Cogeco Peer 1 Pullman.
|
|
15.15 miles
|
Pathway Communications
|
|
|
16.38 miles
|
11:11 Systems: Mississauga, ON
|
11:11 Systems acquired the facility from Sungard Availability Services (Sungard AS) in November 2022.
|
|
16.77 miles
|
Equinix Brampton TR6
|
|
|
16.85 miles
|
Equinix Brampton TR7
|
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
|
|
17.08 miles
|
Urbacon: Richmond DC4
|
DC4 is Urbacon Data Centre Solutions' fourth data centre on its Barker Business Park campus in Richmond Hill. The 203,000 sq ft building has its permit and completed civil works.
|
|
17.08 miles
|
3z Canada: Mississauga
|
|
|
17.12 miles
|
Urbacon: Richmond DC3
|
DC3 is Urbacon Data Centre Solutions' third data centre on its Barker Business Park campus in Richmond Hill. The 111,000 sq ft facility was handed over in two stages in 2023 and 2024.
|
|
17.14 miles
|
North ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.28 miles
|
Urbacon: Richmond DC6
|
DC6 is the planned sixth data centre on Urbacon Data Centre Solutions' Barker Business Park campus in Richmond Hill.
|
|
17.28 miles
|
Urbacon: Richmond DC2
|
DC2 is Urbacon Data Centre Solutions' second data centre on its Barker Business Park campus in Richmond Hill. The 105,000 sq ft facility was completed in October 2020.
|
|
17.31 miles
|
Urbacon: Richmond DC1
|
DC1 is the first data center on Urbacon Data Centre Solutions' Barker Business Park Digital Campus in Richmond Hill, Ontario. The 118,135 sq ft facility opened in 2017.
|
|
17.40 miles
|
Centersquare: Mississauga YYZ1
|
One story building
Raised floor (inches) = 24 and 30
|
|
17.42 miles
|
Urbacon: Richmond DC5
|
DC5 will be Urbacon Data Centre Solutions' fifth data centre on its Barker Business Park campus in Richmond Hill. The planned 305,000 sq ft building is zoned for data centre use.
|
|
17.98 miles
|
CORE Brampton
|
55H, in partnership with Core Data Centers, has announced a phased expansion of its Brampton, Ontario data center. This expansion is designed to meet the growing demands of AI clients.
|
|
19.43 miles
|
Prologis: Mississauga
|
Prologis has filed to develop a 220,000 sq ft data center in Mississauga, Ontario, through a zoning amendment application, with the project still in early planning and potentially competing with alternative industrial development options.
|