Equinix Brampton TR6

Latest Podcast 30 Bramtree Court
Operational
Fully operational facility
Operated by:

Equinix Brampton TR6

░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Map and Nearby Locations

30 Bramtree Court
Equinix Sites
Nearby Facilities

Sites within 15 miles of Equinix Brampton TR6

Distance Site About
0.09 miles Equinix Brampton TR7
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
4.28 miles CentriLogic: Greater Toronto, ON
CentriLogic's 28,000 sq ft purpose-built data centre at 7445 Tranmere Drive in Mississauga, opened in August 2015 in a building that earlier housed a Dell data centre.
4.80 miles Urbacon: Toronto West DC7
DC7 is situated in a prime Toronto location accessible by transit and close to Canada's largest international transportation hub.
5.50 miles Plaza PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.51 miles Center GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.87 miles Excell IT
7.58 miles Central HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.26 miles Cogent Mississauga
8.32 miles CentriLogic Mississauga (North)
18″ raised floor with hot/cold aisle configuration 24/7/365 Security & Multi-level Biometric Access Control
8.80 miles Metro CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.93 miles 1 Century Place (TOR1) Digital Realty
Digital Realty's TOR1 wholesale data centre at 1 Century Place in Vaughan, just north of Toronto, built inside the former Toronto Star printing plant.
9.04 miles Hut 8: Mississauga DC
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
9.15 miles Compass: North York
Compass Datacenters' Toronto data centre at 15 Fenmar Drive in North York, a two-storey building completed in 2023 for a single hyperscale tenant.
9.27 miles CORE Brampton
55H, in partnership with Core Data Centers, has announced a phased expansion of its Brampton, Ontario data center. This expansion is designed to meet the growing demands of AI clients.
9.52 miles ServerFarm Toronto TOR1
Site is approximately 7.14 acres Three 10,000 SF data halls with ample office and conference space
9.75 miles 11:11 Systems: Mississauga, ON
11:11 Systems acquired the facility from Sungard Availability Services (Sungard AS) in November 2022.
10.04 miles Hut 8: Vaughan DC
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
10.22 miles 3z Canada: Etobicoke
10.45 miles Centersquare: Mississauga YYZ1
One story building Raised floor (inches) = 24 and 30
10.83 miles Prologis: Mississauga
Prologis has filed to develop a 220,000 sq ft data center in Mississauga, Ontario, through a zoning amendment application, with the project still in early planning and potentially competing with alternative industrial development options.
10.94 miles CentriLogic Mississauga (South)
11.09 miles Cogent: Mississauga 2
12.24 miles Canada Cloud Data Centre
13.33 miles eStruxture TOR-3 (Etobicoke)
eStruxture's TOR-3 data centre at 431 Horner Avenue in Etobicoke, west Toronto, with three data halls and natural gas and diesel backup generation.
13.51 miles Whipcord Edge: Toronto TDC01
13.51 miles Whipcord Edge: TDC01
13.61 miles Centersquare: Etobicoke YYZ3
Centersquare's Toronto YYZ3 facility at 75-77 Fima Crescent, Etobicoke, a ~214,000 sq ft retrofit data center that Centersquare owns. It joined the portfolio in Centersquare's October 2025 ten-facility North American acquisition.
14.98 miles 3z Canada: Mississauga
15.80 miles ILAP 210 Sheppard
15.84 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.14 miles Halton Data Center: Milton
16.44 miles Beanfield 23 Fraser
Beanfield's ground-level colocation facility at 23 Fraser Avenue in Toronto's Liberty Village, with its own generator, dual UPS and direct access to Beanfield's fibre network.
16.44 miles Moldenhauer: Mississauga
Moldenhauer's proposed data centre campus in southwest Mississauga, near Clarkson GO station.
16.76 miles Telehouse: 905 King Street West
Telehouse Canada data centre at 905 King Street West in Toronto's Liberty Village, linked by dark fibre to the 151 and 250 Front Street West carrier hotels.
16.77 miles Beanfield 905 King St
Beanfield colocation suite inside 905 King Street West in Toronto's Liberty Village, on Beanfield's own fibre network.
16.77 miles Contegix Toronto
16.77 miles Cologix Toronto TOR2
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
16.77 miles Cologix TOR3
Cologix's TOR3 data centre inside 905 King Street West in Toronto's Liberty Village, with diverse fibre to Cologix TOR1 at the 151 Front Street West carrier hotel.
17.78 miles Telehouse: 250 Front Street West
Telehouse Canada data centre in the Canadian Broadcasting Centre at 250 Front Street West, a block from the 151 Front Street West carrier hotel in downtown Toronto.
17.80 miles Qscale: Toronto
Qscale, a Canadian company, plans to build a multi-billion-dollar data center in Toronto.
17.81 miles Beanfield 250 Front St
Beanfield colocation at 250 Front Street West in the Canadian Broadcasting Centre block of downtown Toronto, with multi-cabinet halls cooled by Enwave deep-lake water.
17.90 miles eStruxture TOR-2
eStruxture's TOR-2 data centre on the eighth floor of 145 King Street West in Toronto's financial district, formerly Cogeco Peer 1 King Street.
17.95 miles Hive DC: Toronto
Hive Data Center's highly connected TOR-1 site has extensive connectivity to Canada’s largest city and direct paths to the US Mid-west.
17.96 miles Beanfield 151 Front St
Beanfield colocation inside the 151 Front Street West carrier hotel in downtown Toronto, with boutique multi-cabinet halls cooled by Enwave deep-lake water.
17.97 miles 3z Canada: 151 Front
17.97 miles Equinix Toronto TR1
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
17.97 miles Neutral Data Toronto
17.97 miles Cologix Toronto TOR1
Cologix operates seven discrete data centre suites at 151 Front Street West (TOR1), Canada's largest carrier hotel.
17.97 miles TNW Toronto
17.97 miles Amanah: TOR1
Located on the 3rd floor, TOR 1 is Amanah's primary data center suite.
17.97 miles eStruxture TOR-1
eStruxture's TOR-1 colocation suites inside the 151 Front Street West carrier hotel in downtown Toronto, spread across four data halls on three floors.
17.97 miles Digital Realty 151 Front
17.97 miles Priority Colo TOR1
17.97 miles Coloware: YTZ-1
Coloware's YTZ-1 data centre inside the 151 Front Street West carrier hotel in downtown Toronto, opened in 2020 and expanded in 2024.
17.98 miles Amanah: TOR2
Situated on the 6th floor of the same building, TOR 2 serves as a high-availability extension of TOR 1.
17.99 miles TELUS: Toronto Laird
TELUS's Toronto Intelligent Internet Data Centre at 73 Laird Drive in East York, a former PSINet facility. The City of Toronto has leased data centre space there since 2007.
17.99 miles Telehouse: 151 Front Street West
Telehouse Canada's flagship carrier hotel at 151 Front Street West, beside Union Station in downtown Toronto. It is home to the Toronto Internet Exchange and to suites run by many colocation and network operators.
17.99 miles Equinix Toronto TR4
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
18.01 miles CentriLogic Toronto
CentriLogic's downtown Toronto data centre in Suite 300 at 55 York Street, a 16,000 sq ft managed services and colocation facility.
18.16 miles Beeches Development: East York, ON
Toronto-based Beeches Development Inc. has proposed a new data center in the Leaside business park, marking the third iteration of plans for the site at 154-156 Wicksteed Avenue.
18.37 miles Cloud ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.46 miles West CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.83 miles Urbacon Toronto - 281 Front Street
At the intersection of Front Street East and Parliament Street, 281 Front is less than one and a half kilometres from Canada’s financial heart, and directly abutting 151 Front Street, which is Toronto's carrier hotel.
18.86 miles Equinix Toronto TR2
TR2 is also known as Parliament Street Data Centre TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems. TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
18.86 miles Rogers Markham TOR DC3
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
18.86 miles Priority Colo TOR2
Priority Colo's TOR2 data centre at 600 Cochrane Drive in Markham, near Highways 404 and 7, built in 2013 for higher-density deployments.
18.87 miles Qu DC: TOR3
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
19.05 miles Urbacon: Richmond DC4
DC4 is Urbacon Data Centre Solutions' fourth data centre on its Barker Business Park campus in Richmond Hill. The 203,000 sq ft building has its permit and completed civil works.
19.05 miles Yondr: Toronto TOR1
The three-story facility, being built on a 4.5-acre plot, will feature closed-loop cooling technology. The project is expected to be ready for service by mid-2026.
19.10 miles Lumen Toronto 1
19.14 miles Urbacon: Richmond DC3
DC3 is Urbacon Data Centre Solutions' third data centre on its Barker Business Park campus in Richmond Hill. The 111,000 sq ft facility was handed over in two stages in 2023 and 2024.
19.18 miles Urbacon: Richmond DC2
DC2 is Urbacon Data Centre Solutions' second data centre on its Barker Business Park campus in Richmond Hill. The 105,000 sq ft facility was completed in October 2020.
19.20 miles Edgeconnex Toronto
EdgeConneX's Toronto edge data centre at 565 Gordon Baker Road in North York, a 38,900 sq ft facility opened in 2018.
19.29 miles Urbacon: Richmond DC1
DC1 is the first data center on Urbacon Data Centre Solutions' Barker Business Park Digital Campus in Richmond Hill, Ontario. The 118,135 sq ft facility opened in 2017.
19.33 miles Cogent: Toronto
19.47 miles Urbacon: Richmond DC6
DC6 is the planned sixth data centre on Urbacon Data Centre Solutions' Barker Business Park campus in Richmond Hill.
19.50 miles TMX: Markham Colocation
TMX Group's colocation data centre at 3500 Steeles Avenue East in Markham, built for trading firms connecting to the Toronto Stock Exchange.
19.52 miles Urbacon: Richmond DC5
DC5 will be Urbacon Data Centre Solutions' fifth data centre on its Barker Business Park campus in Richmond Hill. The planned 305,000 sq ft building is zoned for data centre use.
19.60 miles Pathway Communications
19.72 miles Content Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.77 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.91 miles Nüday Networks

Equinix Brampton TR6 Data Center Photos See all

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers
Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed...

Schneider Electric and Equinix Trial Software-Defined Switchgear for Data Centers

September 30, 2026 Equinix

Equinix and Schneider Electric have partnered to pilot software-defined medium-voltage switchgear at an undisclosed Equinix data center. The technology, developed by Schneider Electric, is designed to reduce the need for specialized cabling and hardware in data centers. Schneider said the...

Read more
Read Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer
Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryo...

Diraq And Equinix To Deploy Australia’s First Commercial Quantum Computer

September 03, 2026 Equinix

Australian quantum startup Diraq has partnered with Equinix to deploy a quantum computer at an Equinix data center in Sydney. The eight-qubit system will use a silicon chip with self-contained cryogenic cooling and control electronics. The chip can be replaced to increase the qubit count without...

Read more
Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read Equinix is Building its Fourth Data Center in Malaysia
Equinix is Building its Fourth Data Center in Malaysia

Equinix is Building its Fourth Data Center in Malaysia

May 12, 2026 Equinix

Equinix will build its fourth data center in Malaysia, KL2, in Kuala Lumpur. The US$190 million facility will house over 2,200 cabinets at full build-out, though its size and IT capacity were not disclosed. Equinix said the new data center will be located less than 1 km from its KL1 facility in...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?