Telehouse Breaks Ground on New London Facility
October 22, 2025
Telehouse
Telehouse Canada operates three data centres in downtown Toronto, connected by a dark fibre network, enabling interconnections to a diverse network of 200+ carriers, ISPs and ASPs and fast, efficient access to key North American markets.
151 Front Street West is Canada’s largest colocation facility and the most important carrier hotel. It is conveniently located next to Union Station with easy access to Toronto’s subway streetcar systems, as well as the GO Transit Union Station Bus Terminal. This Tier 3 data centre provides access to the Toronto Internet Exchange (TorIX) and offers fast, efficient connections to the city’s financial district. 151 Front Street West provides access to a large ecosystem of carriers, ideal for cloud, hosting and large carrier networks.
Telehouse entered the Canadian market with the acquisition of three Toronto data centers from Allied Properties REIT. The purchase was announced by Telehouse's parent company, KDDI.
| Distance | Site | About |
|---|---|---|
| 0.01 miles | Amanah: TOR2 |
Situated on the 6th floor of the same building, TOR 2 serves as a high-availability extension of TOR 1.
|
| 0.02 miles | eStruxture TOR-1 | |
| 0.02 miles | Digital Realty 151 Front | |
| 0.02 miles | Priority Colo TOR1 | |
| 0.02 miles | Amanah: TOR1 |
Located on the 3rd floor, TOR 1 is Amanah's primary data center suite.
|
| 0.02 miles | Neutral Data Toronto | |
| 0.02 miles | Cologix Toronto TOR1 |
Cologix operates seven discrete Toronto data centres at 151 Front Street West (TOR 1), Canada’s largest and most important carrier hotel.
|
| 0.02 miles | Equinix Toronto TR1 |
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
|
| 0.04 miles | Hive DC: Toronto |
Hive Data Center's highly connected TOR-1 site has extensive connectivity to Canada’s largest city and direct paths to the US Mid-west.
|
| 0.12 miles | CenriLogic Toronto |
|
| 0.16 miles | Equinix Toronto TR4 |
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
|
| 0.19 miles | eStruxture TOR-2 |
|
| 0.22 miles | Telehouse: 250 Front Street West |
Telehouse has acquired three data centers in Canada, marking its entry into the country.
|
| 0.39 miles | TNW Toronto |
|
| 0.59 miles | Qscale: Toronto |
Qscale, a Canadian company, plans to build a multi-billion-dollar data center in Toronto.
|
| 0.59 miles | Crypto Mining Data Center Request Dataset |
Crypto firm Hive Digital (through its subsidiary Buzz High Performance Computing Inc.) has acquired a data center in Toronto, Canada.
|
| 1.18 miles | Urbacon Toronto - 281 Front Street |
At the intersection of Front Street East and Parliament Street, 281 Front is less than one and a half kilometres from Canada’s financial heart, and directly abutting 151 Front Street, which is Toronto's carrier hotel.
|
| 1.18 miles | Equinix Toronto TR2 |
TR2 is also known as Parliament Street Data Centre
TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems.
TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
|
| 1.44 miles | Cologix TOR3 | |
| 1.44 miles | Beanfield 905 King St |
|
| 1.44 miles | Cologix Toronto TOR2 |
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
|
| 1.44 miles | Contegix Toronto | |
| 1.44 miles | Telehouse: 905 King Street West |
Telehouse has acquired three data centers in Canada, marking its entry into the country.
|
| 1.67 miles | CORE Brampton |
55H, in partnership with Core Data Centers, has announced a phased expansion of its Brampton, Ontario data center. This expansion is designed to meet the growing demands of AI clients.
|
| 2.07 miles | Beanfield 23 Fraser |
|
| 4.85 miles | Beeches Development: East York, ON |
Toronto-based Beeches Development Inc. has proposed a new data center in the Leaside business park, marking the third iteration of plans for the site at 154-156 Wicksteed Avenue.
|
| 6.23 miles | Lumen Toronto 1 | |
| 6.83 miles | Stack: TOR01C |
Stack Infrastructure's TOR01C facility is just seven miles away from 151 Front Street. The third phase will offer 24MW to support client growth on a campus tailored as a purpose-built solution for scalability.
|
| 6.91 miles | Stack: TOR01B |
Stack Infrastructure's TOR01B facility is just seven miles away from 151 Front Street. The 24MW phase of development features committed power from Toronto Hydro from three diverse substations using 100% renewable energy sources.
|
| 6.91 miles | STACK Toronto TOR01 |
Stack Infrastructure's TOR01 Campus is just seven miles away from 151 Front Street, Toronto's largest carrier hotel and primary internet exchange point. Toronto-based developer First Gulf partnered with STACK to deliver the initial 8MW data center by renovating an existing building TOR01A.
|
| 6.94 miles | Whipcord Edge: TDC01 | |
| 6.94 miles | Canada15Edge Toronto West | |
| 7.85 miles | Compass Toronto Etobicoke | |
| 8.23 miles | eStruxture TOR-3 (Etobicoke) |
|
| 8.28 miles | ILAP 210 Sheppard | |
| 9.24 miles | ServerFarm Toronto TOR1 |
Site is approximately 7.14 acres
Three 10,000 SF data halls with ample office and conference space
|
| 9.30 miles | Hyperscale Data Center Request Dataset |
Microsoft is planning to build a new data center on the site of a now-closed Lowe’s store between Islington Avenue and Highway 401 in Toronto, Canada.
|
| 9.85 miles | Canada Cloud Data Centre | |
| 10.47 miles | Cogent Mississauga | |
| 10.92 miles | Compass: North York | |
| 11.26 miles | Hut 8: Mississauga DC |
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
|
| 11.57 miles | Edgeconnex Toronto | |
| 11.83 miles | Yondr: Toronto TOR1 |
The three-story facility, being built on a 4.5-acre plot, will feature closed-loop cooling technology. The project is expected to be ready for service by mid-2026.
|
| 12.16 miles | 1 Century Place (TOR1) Digital Realty |
This site was originally operated by Dupont Fabros as TOR1 before being acquired in Sept 2017 by Digital Realty Trust in a $7.6 Billion 12 datacenter deal.
Located just outside the city of Toronto in nearby Vaughan, this Canadian wholesale data centre spans over 66,000 square metres (711,000 square feet) with a critical power capacity of up to 46 megawatts. The site was the former Toronto Star Printing plant.
|
| 12.83 miles | Nüday Networks | |
| 13.10 miles | CentriLogic Mississauga (South) | |
| 13.42 miles | Hut 8: Vaughan DC |
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
|
| 13.57 miles | Urbacon: Toronto West DC7 |
DC7 is situated in a prime Toronto location accessible by transit and close to Canada's largest international transportation hub.
|
| 13.72 miles | 371 Gough - Digital Realty |
The site will support (5) 1,350 kW data center suites measuring approximately 10,000 sq. ft. each
|
| 13.75 miles | Hyperscale Data Center Request Dataset |
This facility will be part of the proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," in Ontario, Canada.
|
| 13.81 miles | Hyperscale Data Center Request Dataset |
The proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," features two distinct 3-storey buildings including administration zone.
|
| 13.82 miles | Rogers Markham TOR DC3 |
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
| 13.83 miles | Qu DC: TOR3 |
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
| 13.85 miles | Centersquare: Markham YYZ2 |
|
| 13.90 miles | Priority Colo TOR2 |
|
| 14.15 miles | eStruxture TOR-4 Scarborough |
|
| 14.15 miles | Excell IT | |
| 14.17 miles | Equinix Markham TR5 | |
| 14.35 miles | CentriLogic Mississauga (North) |
18″ raised floor with hot/cold aisle configuration
24/7/365 Security & Multi-level Biometric Access Control
|
| 14.38 miles | CORE: Markham | |
| 14.38 miles | Cologix TOR4 |
Close to downtown Toronto in Markham, the Scalelogix TOR4-S data center has diverse dark fiber connectivity between TOR4-S and TOR1 at 151 Front Street
|
| 14.38 miles | 1547 Ontario TOON1 |
The building was sold to 1547 Critical Systems Realty in 2018. As part of the deal, 1547 will handle wholesale deals in the building. While I.C.E will manage all the retail colocation deployments.
|
| 14.75 miles | Pathway Communications |
|
| 15.89 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $69 million CAD in a new data center campus in Vaughan, Ontario.
|
| 15.94 miles | Hyperscale Data Center Request Dataset |
This facility is part of Microsoft's YT011 data center campus in Vaughan, Ontario.
|
| 16.84 miles | Urbacon: Richmond DC4 |
DC4 is Urbacon Data Centre Solutions' fourth data center on the Richmond Hill Campus. The facility spans an area of 200,000 square feet.
|
| 16.88 miles | Urbacon: Richmond DC3 |
DC3 is Urbacon Data Centre Solutions' third data center on the Richmond Hill Campus. The facility spans an area of 111,000 square feet.
|
| 17.01 miles | Urbacon: Richmond DC6 |
DC6 will be Urbacon Data Centre Solutions' sixth data center on the Richmond Hill Campus. The facility will span an area of 200,000 square feet.
|
| 17.04 miles | Urbacon: Richmond DC2 |
DC2 is Urbacon Data Centre Solutions' second data center on the Richmond Hill Campus. The 105,000 square-foot facility came online in 2018.
|
| 17.06 miles | Urbacon - Richmond Hill, ON |
The Barker Business Park Digital Campus is in the process of being built out and will eventually accommodate over 900,000 SF data center space close to Toronto.
|
| 17.15 miles | Urbacon: Richmond DC5 |
DC5 will be Urbacon Data Centre Solutions' fifth data center on the Richmond Hill Campus. The facility will span an area of 200,000 square feet.
|
| 17.82 miles | 11:11 Systems: Mississauga, ON |
11:11 Systems acquired the facility from Sungard Availability Services (Sungard AS) in November 2022.
|
| 17.99 miles | Equinix Brampton TR6 | |
| 18.06 miles | Equinix Brampton TR7 |
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
|
| 18.84 miles | Centersquare: Mississauga YYZ1 |
One story building
Raised floor (inches) = 24 and 30
|
Telehouse is a subsidiary of KDDI Corporation. KDDI was founded in 1984 and is headquartered in Tokyo, Japan.
1989: New York Teleport site
1990: London Docklands North
1997: New York 25 Broadway
1997: London Metro
1998: Expanded to Los Angeles
1999: London Docklands East
1999: Paris Voltaire
2000: Asian expansion in Hong Kong & Seoul
2008: Beijing BEZ & Singapore
2009: Paris Magny
2010: London Docklands West
2010: Hanoi & Shanghai Jinqiao
2010: Johannesburg
2011: Hong Kong CCC
2011: New York Chelsea
2011: Istanbul
2012: Frankfurt and Moscow
2012: Beijing BDA
2013: Shanghai Zhangjiang
October 22, 2025
Telehouse
June 25, 2025
Toronto
January 20, 2025
Telehouse
June 13, 2024
Telehouse
December 29, 2023
Telehouse
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas