|
2.08 miles
|
Cogent Mississauga
|
|
|
2.43 miles
|
3z Canada: Etobicoke
|
|
|
3.01 miles
|
Excell IT
|
|
|
3.14 miles
|
CentriLogic Mississauga (North)
|
18″ raised floor with hot/cold aisle configuration
24/7/365 Security & Multi-level Biometric Access Control
|
|
3.25 miles
|
CentriLogic Mississauga (South)
|
|
|
3.44 miles
|
Cogent: Mississauga 2
|
|
|
3.94 miles
|
UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.43 miles
|
eStruxture TOR-3 (Etobicoke)
|
eStruxture's TOR-3 data centre at 431 Horner Avenue in Etobicoke, west Toronto, with three data halls and natural gas and diesel backup generation.
|
|
4.77 miles
|
Centersquare: Etobicoke YYZ3
|
Centersquare's Toronto YYZ3 facility at 75-77 Fima Crescent, Etobicoke, a ~214,000 sq ft retrofit data center that Centersquare owns. It joined the portfolio in Centersquare's October 2025 ten-facility North American acquisition.
|
|
4.86 miles
|
CentriLogic: Greater Toronto, ON
|
CentriLogic's 28,000 sq ft purpose-built data centre at 7445 Tranmere Drive in Mississauga, opened in August 2015 in a building that earlier housed a Dell data centre.
|
|
4.99 miles
|
Whipcord Edge: TDC01
|
|
|
4.99 miles
|
Whipcord Edge: Toronto TDC01
|
|
|
5.74 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
6.79 miles
|
11:11 Systems: Mississauga, ON
|
11:11 Systems acquired the facility from Sungard Availability Services (Sungard AS) in November 2022.
|
|
7.07 miles
|
Urbacon: Toronto West DC7
|
DC7 is situated in a prime Toronto location accessible by transit and close to Canada's largest international transportation hub.
|
|
7.47 miles
|
ServerFarm Toronto TOR1
|
Site is approximately 7.14 acres
Three 10,000 SF data halls with ample office and conference space
|
|
7.86 miles
|
Centersquare: Mississauga YYZ1
|
One story building
Raised floor (inches) = 24 and 30
|
|
8.22 miles
|
CORE Brampton
|
55H, in partnership with Core Data Centers, has announced a phased expansion of its Brampton, Ontario data center. This expansion is designed to meet the growing demands of AI clients.
|
|
8.74 miles
|
Moldenhauer: Mississauga
|
Moldenhauer's proposed data centre campus in southwest Mississauga, near Clarkson GO station.
|
|
9.04 miles
|
Equinix Brampton TR6
|
Equinix TR6 is a colocation data center at 30 Bramtree Court in Brampton, Ontario, Canada, that Q9 Networks opened in 2005 and Equinix expanded with a new phase in 2025.
|
|
9.10 miles
|
Compass: North York
|
Compass Datacenters' Toronto data centre at 15 Fenmar Drive in North York, a two-storey building completed in 2023 for a single hyperscale tenant.
|
|
9.13 miles
|
Equinix Brampton TR7
|
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
|
|
9.28 miles
|
Beanfield 23 Fraser
|
Beanfield's ground-level colocation facility at 23 Fraser Avenue in Toronto's Liberty Village, with its own generator, dual UPS and direct access to Beanfield's fibre network.
|
|
9.36 miles
|
3z Canada: Mississauga
|
|
|
9.77 miles
|
Prologis: Mississauga
|
Prologis has filed to develop a 220,000 sq ft data center in Mississauga, Ontario, through a zoning amendment application, with the project still in early planning and potentially competing with alternative industrial development options.
|
|
9.83 miles
|
Telehouse: 905 King Street West
|
Telehouse Canada data centre at 905 King Street West in Toronto's Liberty Village, linked by dark fibre to the 151 and 250 Front Street West carrier hotels.
|
|
9.83 miles
|
Beanfield 905 King St
|
Beanfield colocation suite inside 905 King Street West in Toronto's Liberty Village, on Beanfield's own fibre network.
|
|
9.83 miles
|
Contegix Toronto
|
|
|
9.83 miles
|
Cologix Toronto TOR2
|
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
|
|
9.84 miles
|
Cologix TOR3
|
Cologix's TOR3 data centre inside 905 King Street West in Toronto's Liberty Village, with diverse fibre to Cologix TOR1 at the 151 Front Street West carrier hotel.
|
|
9.86 miles
|
Point UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.11 miles
|
1 Century Place (TOR1) Digital Realty
|
Digital Realty's TOR1 wholesale data centre at 1 Century Place in Vaughan, just north of Toronto, built inside the former Toronto Star printing plant.
|
|
10.61 miles
|
Park UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.66 miles
|
PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.04 miles
|
Telehouse: 250 Front Street West
|
Telehouse Canada data centre in the Canadian Broadcasting Centre at 250 Front Street West, a block from the 151 Front Street West carrier hotel in downtown Toronto.
|
|
11.06 miles
|
Beanfield 250 Front St
|
Beanfield colocation at 250 Front Street West in the Canadian Broadcasting Centre block of downtown Toronto, with multi-cabinet halls cooled by Enwave deep-lake water.
|
|
11.22 miles
|
Beanfield 151 Front St
|
Beanfield colocation inside the 151 Front Street West carrier hotel in downtown Toronto, with boutique multi-cabinet halls cooled by Enwave deep-lake water.
|
|
11.22 miles
|
Hive DC: Toronto
|
Hive Data Center's highly connected TOR-1 site has extensive connectivity to Canada’s largest city and direct paths to the US Mid-west.
|
|
11.24 miles
|
3z Canada: 151 Front
|
|
|
11.24 miles
|
Equinix Toronto TR1
|
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
|
|
11.24 miles
|
Cologix Toronto TOR1
|
Cologix operates seven discrete data centre suites at 151 Front Street West (TOR1), Canada's largest carrier hotel.
|
|
11.24 miles
|
Neutral Data Toronto
|
|
|
11.25 miles
|
Amanah: TOR1
|
Located on the 3rd floor, TOR 1 is Amanah's primary data center suite.
|
|
11.25 miles
|
Priority Colo TOR1
|
|
|
11.25 miles
|
Digital Realty 151 Front
|
|
|
11.25 miles
|
eStruxture TOR-1
|
eStruxture's TOR-1 colocation suites inside the 151 Front Street West carrier hotel in downtown Toronto, spread across four data halls on three floors.
|
|
11.25 miles
|
Coloware: YTZ-1
|
Coloware's YTZ-1 data centre inside the 151 Front Street West carrier hotel in downtown Toronto, opened in 2020 and expanded in 2024.
|
|
11.25 miles
|
eStruxture TOR-2
|
eStruxture's TOR-2 data centre on the eighth floor of 145 King Street West in Toronto's financial district, formerly Cogeco Peer 1 King Street.
|
|
11.25 miles
|
Amanah: TOR2
|
Situated on the 6th floor of the same building, TOR 2 serves as a high-availability extension of TOR 1.
|
|
11.26 miles
|
Telehouse: 151 Front Street West
|
Telehouse Canada's flagship carrier hotel at 151 Front Street West, beside Union Station in downtown Toronto. It is home to the Toronto Internet Exchange and to suites run by many colocation and network operators.
|
|
11.33 miles
|
Qscale: Toronto
|
Qscale, a Canadian company, plans to build a multi-billion-dollar data center in Toronto.
|
|
11.33 miles
|
Equinix Toronto TR4
|
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
|
|
11.33 miles
|
CentriLogic Toronto
|
CentriLogic's downtown Toronto data centre in Suite 300 at 55 York Street, a 16,000 sq ft managed services and colocation facility.
|
|
11.36 miles
|
Canada Cloud Data Centre
|
|
|
11.41 miles
|
TNW Toronto
|
|
|
11.70 miles
|
Hut 8: Vaughan DC
|
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
|
|
12.36 miles
|
Urbacon Toronto - 281 Front Street
|
At the intersection of Front Street East and Parliament Street, 281 Front is less than one and a half kilometres from Canada’s financial heart, and directly abutting 151 Front Street, which is Toronto's carrier hotel.
|
|
12.38 miles
|
Equinix Toronto TR2
|
TR2 is also known as Parliament Street Data Centre
TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems.
TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
|
|
13.23 miles
|
TELUS: Toronto Laird
|
TELUS's Toronto Intelligent Internet Data Centre at 73 Laird Drive in East York, a former PSINet facility. The City of Toronto has leased data centre space there since 2007.
|
|
13.50 miles
|
ILAP 210 Sheppard
|
|
|
13.62 miles
|
Beeches Development: East York, ON
|
Toronto-based Beeches Development Inc. has proposed a new data center in the Leaside business park, marking the third iteration of plans for the site at 154-156 Wicksteed Avenue.
|
|
15.01 miles
|
Lumen Toronto 1
|
|
|
15.16 miles
|
Halton Data Center: Milton
|
|
|
16.56 miles
|
Cogent: Toronto
|
|
|
17.52 miles
|
Stack: TOR01C
|
TOR01C is a proposed 212,000 sq ft building, the third phase of Stack Infrastructure's TOR01 campus in Scarborough, Toronto.
|
|
17.58 miles
|
Stack: TOR01A
|
TOR01A is the first building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto. Developer First Gulf partnered with STACK to renovate the existing 89,000 sq ft building, delivered in September 2023.
|
|
17.60 miles
|
Stack: TOR01B
|
TOR01B is a proposed 217,000 sq ft building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto, in site plan review.
|
|
17.77 miles
|
Edgeconnex Toronto
|
EdgeConneX's Toronto edge data centre at 565 Gordon Baker Road in North York, a 38,900 sq ft facility opened in 2018.
|
|
17.81 miles
|
Yondr: Toronto TOR1
|
The three-story facility, being built on a 4.5-acre plot, will feature closed-loop cooling technology. The project is expected to be ready for service by mid-2026.
|
|
18.27 miles
|
TMX: Markham Colocation
|
TMX Group's colocation data centre at 3500 Steeles Avenue East in Markham, built for trading firms connecting to the Toronto Stock Exchange.
|
|
18.34 miles
|
North PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.43 miles
|
CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.45 miles
|
Content Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.50 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.71 miles
|
Qu DC: Markham TOR3
|
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
|
18.74 miles
|
Priority Colo TOR2
|
Priority Colo's TOR2 data centre at 600 Cochrane Drive in Markham, near Highways 404 and 7, built in 2013 for higher-density deployments.
|
|
18.89 miles
|
Nüday Networks
|
|
|
19.66 miles
|
Pathway Communications
|
|
|
19.78 miles
|
Cologix TOR4
|
Cologix's TOR4 data centre in Markham, a purpose-built facility completed in October 2023, with diverse dark fibre to Cologix TOR1 at 151 Front Street West.
|
|
19.78 miles
|
CORE: Markham
|
Former Core Data Centres colocation operation at 105 Clegg Road in Markham. Cologix bought the building in September 2025 and runs it as Cologix TOR5.
|
|
19.78 miles
|
Cologix TOR5
|
Cologix's TOR5 data centre at 105 Clegg Road in Markham, a purpose-built 40,000 sq ft facility next to Cologix TOR4.
|
|
19.78 miles
|
Kyndryl: Markham
|
|
|
19.84 miles
|
371 Gough - Digital Realty
|
Digital Realty's YYZ10 data centre at 371 Gough Road in Markham, a 120,000 sq ft building fitted out in phases from 2014. Digital Core REIT owns a 90% interest.
|
|
19.87 miles
|
Equinix Markham TR5
|
Equinix TR5 is a colocation data center at 8100 Warden Avenue in Markham, Ontario, Canada, that Equinix acquired from Bell Canada in October 2020.
|