0.00 miles
|
Cologix Toronto TOR1
|
Cologix operates seven discrete data centre suites at 151 Front Street West (TOR1), Canada's largest carrier hotel.
|
|
0.00 miles
|
Equinix Toronto TR1
|
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
|
|
0.00 miles
|
3z Canada: 151 Front
|
|
|
0.01 miles
|
Amanah: TOR1
|
Located on the 3rd floor, TOR 1 is Amanah's primary data center suite.
|
|
0.01 miles
|
Priority Colo TOR1
|
|
|
0.01 miles
|
Digital Realty 151 Front
|
|
|
0.01 miles
|
eStruxture TOR-1
|
eStruxture's TOR-1 colocation suites inside the 151 Front Street West carrier hotel in downtown Toronto, spread across four data halls on three floors.
|
|
0.01 miles
|
Coloware: YTZ-1
|
Coloware's YTZ-1 data centre inside the 151 Front Street West carrier hotel in downtown Toronto, opened in 2020 and expanded in 2024.
|
|
0.02 miles
|
Hive DC: Toronto
|
Hive Data Center's highly connected TOR-1 site has extensive connectivity to Canada’s largest city and direct paths to the US Mid-west.
|
|
0.02 miles
|
Amanah: TOR2
|
Situated on the 6th floor of the same building, TOR 2 serves as a high-availability extension of TOR 1.
|
|
0.02 miles
|
Beanfield 151 Front St
|
Beanfield colocation inside the 151 Front Street West carrier hotel in downtown Toronto, with boutique multi-cabinet halls cooled by Enwave deep-lake water.
|
|
0.02 miles
|
Telehouse: 151 Front Street West
|
Telehouse Canada's flagship carrier hotel at 151 Front Street West, beside Union Station in downtown Toronto. It is home to the Toronto Internet Exchange and to suites run by many colocation and network operators.
|
|
0.14 miles
|
CentriLogic Toronto
|
CentriLogic's downtown Toronto data centre in Suite 300 at 55 York Street, a 16,000 sq ft managed services and colocation facility.
|
|
0.17 miles
|
Equinix Toronto TR4
|
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
|
|
0.19 miles
|
Beanfield 250 Front St
|
Beanfield colocation at 250 Front Street West in the Canadian Broadcasting Centre block of downtown Toronto, with multi-cabinet halls cooled by Enwave deep-lake water.
|
|
0.20 miles
|
eStruxture TOR-2
|
eStruxture's TOR-2 data centre on the eighth floor of 145 King Street West in Toronto's financial district, formerly Cogeco Peer 1 King Street.
|
|
0.20 miles
|
Telehouse: 250 Front Street West
|
Telehouse Canada data centre in the Canadian Broadcasting Centre at 250 Front Street West, a block from the 151 Front Street West carrier hotel in downtown Toronto.
|
|
0.40 miles
|
TNW Toronto
|
|
|
0.60 miles
|
Qscale: Toronto
|
Qscale, a Canadian company, plans to build a multi-billion-dollar data center in Toronto.
|
|
1.20 miles
|
Urbacon Toronto - 281 Front Street
|
At the intersection of Front Street East and Parliament Street, 281 Front is less than one and a half kilometres from Canada’s financial heart, and directly abutting 151 Front Street, which is Toronto's carrier hotel.
|
|
1.20 miles
|
Equinix Toronto TR2
|
TR2 is also known as Parliament Street Data Centre
TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems.
TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
|
|
1.42 miles
|
Cologix TOR3
|
Cologix's TOR3 data centre inside 905 King Street West in Toronto's Liberty Village, with diverse fibre to Cologix TOR1 at the 151 Front Street West carrier hotel.
|
|
1.42 miles
|
Cologix Toronto TOR2
|
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
|
|
1.42 miles
|
Beanfield 905 King St
|
Beanfield colocation suite inside 905 King Street West in Toronto's Liberty Village, on Beanfield's own fibre network.
|
|
1.42 miles
|
Contegix Toronto
|
|
|
1.42 miles
|
Telehouse: 905 King Street West
|
Telehouse Canada data centre at 905 King Street West in Toronto's Liberty Village, linked by dark fibre to the 151 and 250 Front Street West carrier hotels.
|
|
2.05 miles
|
Beanfield 23 Fraser
|
Beanfield's ground-level colocation facility at 23 Fraser Avenue in Toronto's Liberty Village, with its own generator, dual UPS and direct access to Beanfield's fibre network.
|
|
4.33 miles
|
TELUS: Toronto Laird
|
TELUS's Toronto Intelligent Internet Data Centre at 73 Laird Drive in East York, a former PSINet facility. The City of Toronto has leased data centre space there since 2007.
|
|
4.86 miles
|
Beeches Development: East York, ON
|
Toronto-based Beeches Development Inc. has proposed a new data center in the Leaside business park, marking the third iteration of plans for the site at 154-156 Wicksteed Avenue.
|
|
6.24 miles
|
Lumen Toronto 1
|
|
|
6.85 miles
|
Stack: TOR01C
|
TOR01C is a proposed 212,000 sq ft building, the third phase of Stack Infrastructure's TOR01 campus in Scarborough, Toronto.
|
|
6.92 miles
|
Whipcord Edge: Toronto TDC01
|
|
|
6.92 miles
|
Whipcord Edge: TDC01
|
|
|
6.93 miles
|
Stack: TOR01B
|
TOR01B is a proposed 217,000 sq ft building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto, in site plan review.
|
|
6.93 miles
|
Stack: TOR01A
|
TOR01A is the first building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto. Developer First Gulf partnered with STACK to renovate the existing 89,000 sq ft building, delivered in September 2023.
|
|
7.83 miles
|
Centersquare: Etobicoke YYZ3
|
Centersquare's Toronto YYZ3 facility at 75-77 Fima Crescent, Etobicoke, a ~214,000 sq ft retrofit data center that Centersquare owns. It joined the portfolio in Centersquare's October 2025 ten-facility North American acquisition.
|
|
8.20 miles
|
eStruxture TOR-3 (Etobicoke)
|
eStruxture's TOR-3 data centre at 431 Horner Avenue in Etobicoke, west Toronto, with three data halls and natural gas and diesel backup generation.
|
|
8.28 miles
|
ILAP 210 Sheppard
|
|
|
8.88 miles
|
3z Canada: Etobicoke
|
|
|
9.04 miles
|
Cogent: Toronto
|
|
|
9.23 miles
|
ServerFarm Toronto TOR1
|
Site is approximately 7.14 acres
Three 10,000 SF data halls with ample office and conference space
|
|
9.28 miles
|
WestInterested in this information?Contact us
|
Microsoft is building a new data center on the site of a now-closed Lowe’s store between Islington Avenue and Highway 401 in Toronto, Canada.
|
|
9.84 miles
|
Canada Cloud Data Centre
|
|
|
10.45 miles
|
Cogent Mississauga
|
|
|
10.45 miles
|
East CenterInterested in this information?Contact us
|
HIVE Digital's owned data centre at 15 City View Drive in Etobicoke, near Toronto Pearson Airport. It mines bitcoin today, and HIVE's BUZZ HPC unit plans a Tier III upgrade for AI workloads.
|
|
10.91 miles
|
Compass: North York
|
Compass Datacenters' Toronto data centre at 15 Fenmar Drive in North York, a two-storey building completed in 2023 for a single hyperscale tenant.
|
|
11.24 miles
|
Hut 8: Mississauga DC
|
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
|
|
11.58 miles
|
Edgeconnex Toronto
|
EdgeConneX's Toronto edge data centre at 565 Gordon Baker Road in North York, a 38,900 sq ft facility opened in 2018.
|
|
11.84 miles
|
Yondr: Toronto TOR1
|
The three-story facility, being built on a 4.5-acre plot, will feature closed-loop cooling technology. The project is expected to be ready for service by mid-2026.
|
|
12.15 miles
|
1 Century Place (TOR1) Digital Realty
|
Digital Realty's TOR1 wholesale data centre at 1 Century Place in Vaughan, just north of Toronto, built inside the former Toronto Star printing plant.
|
|
12.17 miles
|
TMX: Markham Colocation
|
TMX Group's colocation data centre at 3500 Steeles Avenue East in Markham, built for trading firms connecting to the Toronto Stock Exchange.
|
|
12.22 miles
|
Content Data CenterInterested in this information?Contact us
|
|
|
12.26 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Real Estate Operator is redeveloping the former IBM Canada headquarters campus at 3600 Steeles Avenue East in Markham, including a full rebuild of the campus transformer station.
|
|
12.84 miles
|
Nüday Networks
|
|
|
12.88 miles
|
Hut 8: Vaughan DC
|
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
|
|
13.08 miles
|
CentriLogic Mississauga (South)
|
|
|
13.18 miles
|
Cogent: Mississauga 2
|
|
|
13.55 miles
|
Urbacon: Toronto West DC7
|
DC7 is situated in a prime Toronto location accessible by transit and close to Canada's largest international transportation hub.
|
|
13.72 miles
|
Kyndryl: Markham
|
|
|
13.73 miles
|
371 Gough - Digital Realty
|
Digital Realty's YYZ10 data centre at 371 Gough Road in Markham, a 120,000 sq ft building fitted out in phases from 2014. Digital Core REIT owns a 90% interest.
|
|
13.76 miles
|
Center PrimeInterested in this information?Contact us
|
This facility will be part of the proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," in Ontario, Canada.
|
|
13.81 miles
|
Global ParkInterested in this information?Contact us
|
The proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," features two distinct 3-storey buildings including administration zone.
|
|
13.83 miles
|
Rogers Markham TOR DC3
|
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
|
13.83 miles
|
Qu DC: TOR3
|
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
|
13.86 miles
|
Centersquare: Markham YYZ2
|
Centersquare's YYZ2 data centre at 4175 14th Avenue in Markham, opened by CenturyLink in August 2014 as its second Toronto-area facility.
|
|
13.90 miles
|
Priority Colo TOR2
|
Priority Colo's TOR2 data centre at 600 Cochrane Drive in Markham, near Highways 404 and 7, built in 2013 for higher-density deployments.
|
|
14.13 miles
|
Excell IT
|
|
|
14.16 miles
|
eStruxture TOR-4 Scarborough
|
eStruxture's TOR-4 data centre at 20 Pullman Court in north Scarborough, a purpose-built facility formerly known as Cogeco Peer 1 Pullman.
|
|
14.18 miles
|
Equinix Markham TR5
|
|
|
14.33 miles
|
CentriLogic Mississauga (North)
|
18″ raised floor with hot/cold aisle configuration
24/7/365 Security & Multi-level Biometric Access Control
|
|
14.39 miles
|
Cologix TOR5
|
Cologix's TOR5 data centre at 105 Clegg Road in Markham, a purpose-built 40,000 sq ft facility next to Cologix TOR4.
|
|
14.39 miles
|
CORE: Markham
|
Former Core Data Centres colocation operation at 105 Clegg Road in Markham. Cologix bought the building in September 2025 and runs it as Cologix TOR5.
|
|
14.39 miles
|
Cologix TOR4
|
Cologix's TOR4 data centre in Markham, a purpose-built facility completed in October 2023, with diverse dark fibre to Cologix TOR1 at 151 Front Street West.
|
|
14.75 miles
|
Pathway Communications
|
|
|
14.95 miles
|
CentriLogic: Greater Toronto, ON
|
CentriLogic's 28,000 sq ft purpose-built data centre at 7445 Tranmere Drive in Mississauga, opened in August 2015 in a building that earlier housed a Dell data centre.
|
|
15.44 miles
|
Moldenhauer: Mississauga
|
Moldenhauer's proposed data centre campus in southwest Mississauga, near Clarkson GO station.
|
|
15.88 miles
|
Point PlusInterested in this information?Contact us
|
Microsoft's YTO11 data centre is the first building of a two-phase campus on a 28.2-acre site at 6100 Langstaff Road in Vaughan, north of Toronto.
|
|
15.93 miles
|
Ridge ProInterested in this information?Contact us
|
Microsoft's YTO12 is the planned second phase of its Vaughan data centre campus at 6100 Langstaff Road, a three-storey building next to YTO11.
|
|
16.84 miles
|
Urbacon: Richmond DC4
|
DC4 is Urbacon Data Centre Solutions' fourth data centre on its Barker Business Park campus in Richmond Hill. The 203,000 sq ft building has its permit and completed civil works.
|
|
16.88 miles
|
Urbacon: Richmond DC3
|
DC3 is Urbacon Data Centre Solutions' third data centre on its Barker Business Park campus in Richmond Hill. The 111,000 sq ft facility was handed over in two stages in 2023 and 2024.
|
|
17.01 miles
|
Urbacon: Richmond DC6
|
DC6 is the planned sixth data centre on Urbacon Data Centre Solutions' Barker Business Park campus in Richmond Hill.
|
|
17.04 miles
|
Urbacon: Richmond DC2
|
DC2 is Urbacon Data Centre Solutions' second data centre on its Barker Business Park campus in Richmond Hill. The 105,000 sq ft facility was completed in October 2020.
|
|
17.07 miles
|
Urbacon: Richmond DC1
|
DC1 is the first data center on Urbacon Data Centre Solutions' Barker Business Park Digital Campus in Richmond Hill, Ontario. The 118,135 sq ft facility opened in 2017.
|
|
17.16 miles
|
Urbacon: Richmond DC5
|
DC5 will be Urbacon Data Centre Solutions' fifth data centre on its Barker Business Park campus in Richmond Hill. The planned 305,000 sq ft building is zoned for data centre use.
|
|
17.80 miles
|
11:11 Systems: Mississauga, ON
|
11:11 Systems acquired the facility from Sungard Availability Services (Sungard AS) in November 2022.
|
|
17.97 miles
|
Equinix Brampton TR6
|
|
|
18.05 miles
|
Equinix Brampton TR7
|
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
|
|
18.42 miles
|
3z Canada: Mississauga
|
|
|
18.46 miles
|
CenterInterested in this information?Contact us
|
BUZZ HPC, a subsidiary of HIVE Digital Technologies, plans a sovereign AI data centre on about 25 acres at 3480 Ninth Line in Oakville, west of Toronto. The campus will connect to the Hydro One transmission grid through its own transformer station.
|
|
18.81 miles
|
Centersquare: Mississauga YYZ1
|
One story building
Raised floor (inches) = 24 and 30
|
|
19.40 miles
|
CORE Brampton
|
55H, in partnership with Core Data Centers, has announced a phased expansion of its Brampton, Ontario data center. This expansion is designed to meet the growing demands of AI clients.
|