Telehouse: 250 Front Street West

Latest Podcast 250 Front St W
Operational
Fully operational facility
Operated by:

Telehouse: 250 Front Street West

Year Built: 2015
PUE: 1.3
Utility Provider: Toronto Hydro
Floors: 13
Ownership: Telehouse leasehold the building.

Sites leasing space from Telehouse:

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Telehouse Canada operates three data centres in downtown Toronto, connected by a dark fibre network to more than 200 carriers, ISPs and cloud providers. 250 Front Street West offers colocation and cloud-hosting space, with direct dark fibre to the 151 Front Street West and 905 King Street West facilities.

Site History

  • 1992: The Canadian Broadcasting Centre opened at 250 Front Street West.
  • 2013-2018: Allied Properties REIT built data centre space in the building, which it held on a long-term leasehold.
  • August 2023: KDDI's Telehouse closed its CA$1.35 billion purchase of Allied's urban data centre portfolio, which included the leasehold interest in 250 Front Street West.

Project Profile

  • About 82,000 sq ft of IT space
  • Tier III design
  • Meet-me rooms with access to the building's carriers and internet exchanges

Map and Nearby Locations

250 Front St W
Telehouse Sites
Nearby Facilities

Telehouse: 250 Front Street West Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Telehouse: 250 Front Street West

Distance Site About
0.04 miles Beanfield 250 Front St
Beanfield colocation at 250 Front Street West in the Canadian Broadcasting Centre block of downtown Toronto, with multi-cabinet halls cooled by Enwave deep-lake water.
0.18 miles Beanfield 151 Front St
Beanfield colocation inside the 151 Front Street West carrier hotel in downtown Toronto, with boutique multi-cabinet halls cooled by Enwave deep-lake water.
0.18 miles Hive DC: Toronto
Hive Data Center's highly connected TOR-1 site has extensive connectivity to Canada’s largest city and direct paths to the US Mid-west.
0.19 miles 3z Canada: 151 Front
0.20 miles Neutral Data Toronto
0.20 miles Cologix Toronto TOR1
Cologix operates seven discrete data centre suites at 151 Front Street West (TOR1), Canada's largest carrier hotel.
0.20 miles Equinix Toronto TR1
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
0.20 miles Amanah: TOR1
Located on the 3rd floor, TOR 1 is Amanah's primary data center suite.
0.20 miles Priority Colo TOR1
0.20 miles Digital Realty 151 Front
0.20 miles eStruxture TOR-1
eStruxture's TOR-1 colocation suites inside the 151 Front Street West carrier hotel in downtown Toronto, spread across four data halls on three floors.
0.20 miles Coloware: YTZ-1
Coloware's YTZ-1 data centre inside the 151 Front Street West carrier hotel in downtown Toronto, opened in 2020 and expanded in 2024.
0.21 miles Amanah: TOR2
Situated on the 6th floor of the same building, TOR 2 serves as a high-availability extension of TOR 1.
0.22 miles Telehouse: 151 Front Street West
Telehouse Canada's flagship carrier hotel at 151 Front Street West, beside Union Station in downtown Toronto. It is home to the Toronto Internet Exchange and to suites run by many colocation and network operators.
0.27 miles eStruxture TOR-2
eStruxture's TOR-2 data centre on the eighth floor of 145 King Street West in Toronto's financial district, formerly Cogeco Peer 1 King Street.
0.30 miles CentriLogic Toronto
CentriLogic's downtown Toronto data centre in Suite 300 at 55 York Street, a 16,000 sq ft managed services and colocation facility.
0.32 miles Equinix Toronto TR4
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
0.50 miles TNW Toronto
0.64 miles Qscale: Toronto
Qscale, a Canadian company, plans to build a multi-billion-dollar data center in Toronto.
1.22 miles Cologix TOR3
Cologix's TOR3 data centre inside 905 King Street West in Toronto's Liberty Village, with diverse fibre to Cologix TOR1 at the 151 Front Street West carrier hotel.
1.22 miles Cologix Toronto TOR2
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
1.22 miles Contegix Toronto
1.22 miles Beanfield 905 King St
Beanfield colocation suite inside 905 King Street West in Toronto's Liberty Village, on Beanfield's own fibre network.
1.23 miles Telehouse: 905 King Street West
Telehouse Canada data centre at 905 King Street West in Toronto's Liberty Village, linked by dark fibre to the 151 and 250 Front Street West carrier hotels.
1.38 miles Urbacon Toronto - 281 Front Street
At the intersection of Front Street East and Parliament Street, 281 Front is less than one and a half kilometres from Canada’s financial heart, and directly abutting 151 Front Street, which is Toronto's carrier hotel.
1.39 miles Equinix Toronto TR2
TR2 is also known as Parliament Street Data Centre TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems. TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
1.86 miles Beanfield 23 Fraser
Beanfield's ground-level colocation facility at 23 Fraser Avenue in Toronto's Liberty Village, with its own generator, dual UPS and direct access to Beanfield's fibre network.
4.38 miles TELUS: Toronto Laird
TELUS's Toronto Intelligent Internet Data Centre at 73 Laird Drive in East York, a former PSINet facility. The City of Toronto has leased data centre space there since 2007.
4.92 miles Beeches Development: East York, ON
Toronto-based Beeches Development Inc. has proposed a new data center in the Leaside business park, marking the third iteration of plans for the site at 154-156 Wicksteed Avenue.
6.31 miles Lumen Toronto 1
6.74 miles Whipcord Edge: TDC01
6.74 miles Whipcord Edge: Toronto TDC01
7.02 miles Stack: TOR01C
TOR01C is a proposed 212,000 sq ft building, the third phase of Stack Infrastructure's TOR01 campus in Scarborough, Toronto.
7.09 miles Stack: TOR01B
TOR01B is a proposed 217,000 sq ft building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto, in site plan review.
7.10 miles Stack: TOR01A
TOR01A is the first building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto. Developer First Gulf partnered with STACK to renovate the existing 89,000 sq ft building, delivered in September 2023.
7.65 miles Centersquare: Etobicoke YYZ3
Centersquare's Toronto YYZ3 facility at 75-77 Fima Crescent, Etobicoke, a ~214,000 sq ft retrofit data center that Centersquare owns. It joined the portfolio in Centersquare's October 2025 ten-facility North American acquisition.
8.02 miles eStruxture TOR-3 (Etobicoke)
eStruxture's TOR-3 data centre at 431 Horner Avenue in Etobicoke, west Toronto, with three data halls and natural gas and diesel backup generation.
8.26 miles ILAP 210 Sheppard
8.68 miles 3z Canada: Etobicoke
9.07 miles ServerFarm Toronto TOR1
Site is approximately 7.14 acres Three 10,000 SF data halls with ample office and conference space
9.09 miles Cogent: Toronto
9.10 miles Core RidgeInterested in this information?Contact us
Microsoft is building a new data center on the site of a now-closed Lowe’s store between Islington Avenue and Highway 401 in Toronto, Canada.
9.75 miles Canada Cloud Data Centre
10.25 miles Cogent Mississauga
10.26 miles UltraInterested in this information?Contact us
HIVE Digital's owned data centre at 15 City View Drive in Etobicoke, near Toronto Pearson Airport. It mines bitcoin today, and HIVE's BUZZ HPC unit plans a Tier III upgrade for AI workloads.
10.77 miles Compass: North York
Compass Datacenters' Toronto data centre at 15 Fenmar Drive in North York, a two-storey building completed in 2023 for a single hyperscale tenant.
11.04 miles Hut 8: Mississauga DC
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
11.61 miles Edgeconnex Toronto
EdgeConneX's Toronto edge data centre at 565 Gordon Baker Road in North York, a 38,900 sq ft facility opened in 2018.
11.87 miles Yondr: Toronto TOR1
The three-story facility, being built on a 4.5-acre plot, will feature closed-loop cooling technology. The project is expected to be ready for service by mid-2026.
12.02 miles 1 Century Place (TOR1) Digital Realty
Digital Realty's TOR1 wholesale data centre at 1 Century Place in Vaughan, just north of Toronto, built inside the former Toronto Star printing plant.
12.20 miles TMX: Markham Colocation
TMX Group's colocation data centre at 3500 Steeles Avenue East in Markham, built for trading firms connecting to the Toronto Stock Exchange.
12.25 miles Content Data CenterInterested in this information?Contact us
12.30 miles Real Estate Data CenterInterested in this information?Contact us
Real Estate Operator is redeveloping the former IBM Canada headquarters campus at 3600 Steeles Avenue East in Markham, including a full rebuild of the campus transformer station.
12.76 miles Hut 8: Vaughan DC
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
12.87 miles Nüday Networks
12.89 miles CentriLogic Mississauga (South)
12.99 miles Cogent: Mississauga 2
13.38 miles Urbacon: Toronto West DC7
DC7 is situated in a prime Toronto location accessible by transit and close to Canada's largest international transportation hub.
13.76 miles Kyndryl: Markham
13.76 miles Campus TwoInterested in this information?Contact us
This facility will be part of the proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," in Ontario, Canada.
13.76 miles 371 Gough - Digital Realty
Digital Realty's YYZ10 data centre at 371 Gough Road in Markham, a 120,000 sq ft building fitted out in phases from 2014. Digital Core REIT owns a 90% interest.
13.81 miles Global CenterInterested in this information?Contact us
The proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," features two distinct 3-storey buildings including administration zone.
13.83 miles Rogers Markham TOR DC3
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
13.84 miles Qu DC: TOR3
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
13.90 miles Centersquare: Markham YYZ2
Centersquare's YYZ2 data centre at 4175 14th Avenue in Markham, opened by CenturyLink in August 2014 as its second Toronto-area facility.
13.91 miles Priority Colo TOR2
Priority Colo's TOR2 data centre at 600 Cochrane Drive in Markham, near Highways 404 and 7, built in 2013 for higher-density deployments.
13.93 miles Excell IT
14.14 miles CentriLogic Mississauga (North)
18″ raised floor with hot/cold aisle configuration 24/7/365 Security & Multi-level Biometric Access Control
14.21 miles Equinix Markham TR5
14.25 miles eStruxture TOR-4 Scarborough
eStruxture's TOR-4 data centre at 20 Pullman Court in north Scarborough, a purpose-built facility formerly known as Cogeco Peer 1 Pullman.
14.41 miles CORE: Markham
Former Core Data Centres colocation operation at 105 Clegg Road in Markham. Cologix bought the building in September 2025 and runs it as Cologix TOR5.
14.41 miles Cologix TOR5
Cologix's TOR5 data centre at 105 Clegg Road in Markham, a purpose-built 40,000 sq ft facility next to Cologix TOR4.
14.42 miles Cologix TOR4
Cologix's TOR4 data centre in Markham, a purpose-built facility completed in October 2023, with diverse dark fibre to Cologix TOR1 at 151 Front Street West.
14.75 miles CentriLogic: Greater Toronto, ON
CentriLogic's 28,000 sq ft purpose-built data centre at 7445 Tranmere Drive in Mississauga, opened in August 2015 in a building that earlier housed a Dell data centre.
14.76 miles Pathway Communications
15.28 miles Moldenhauer: Mississauga
Moldenhauer's proposed data centre campus in southwest Mississauga, near Clarkson GO station.
15.72 miles West StationInterested in this information?Contact us
Microsoft's YTO11 data centre is the first building of a two-phase campus on a 28.2-acre site at 6100 Langstaff Road in Vaughan, north of Toronto.
15.77 miles CampusInterested in this information?Contact us
Microsoft's YTO12 is the planned second phase of its Vaughan data centre campus at 6100 Langstaff Road, a three-storey building next to YTO11.
16.83 miles Urbacon: Richmond DC4
DC4 is Urbacon Data Centre Solutions' fourth data centre on its Barker Business Park campus in Richmond Hill. The 203,000 sq ft building has its permit and completed civil works.
16.87 miles Urbacon: Richmond DC3
DC3 is Urbacon Data Centre Solutions' third data centre on its Barker Business Park campus in Richmond Hill. The 111,000 sq ft facility was handed over in two stages in 2023 and 2024.
17.00 miles Urbacon: Richmond DC6
DC6 is the planned sixth data centre on Urbacon Data Centre Solutions' Barker Business Park campus in Richmond Hill.
17.03 miles Urbacon: Richmond DC2
DC2 is Urbacon Data Centre Solutions' second data centre on its Barker Business Park campus in Richmond Hill. The 105,000 sq ft facility was completed in October 2020.
17.06 miles Urbacon: Richmond DC1
DC1 is the first data center on Urbacon Data Centre Solutions' Barker Business Park Digital Campus in Richmond Hill, Ontario. The 118,135 sq ft facility opened in 2017.
17.15 miles Urbacon: Richmond DC5
DC5 will be Urbacon Data Centre Solutions' fifth data centre on its Barker Business Park campus in Richmond Hill. The planned 305,000 sq ft building is zoned for data centre use.
17.60 miles 11:11 Systems: Mississauga, ON
11:11 Systems acquired the facility from Sungard Availability Services (Sungard AS) in November 2022.
17.78 miles Equinix Brampton TR6
17.86 miles Equinix Brampton TR7
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
18.25 miles 3z Canada: Mississauga
18.29 miles Ridge OneInterested in this information?Contact us
BUZZ HPC, a subsidiary of HIVE Digital Technologies, plans a sovereign AI data centre on about 25 acres at 3480 Ninth Line in Oakville, west of Toronto. The campus will connect to the Hydro One transmission grid through its own transformer station.
18.62 miles Centersquare: Mississauga YYZ1
One story building Raised floor (inches) = 24 and 30
19.20 miles CORE Brampton
55H, in partnership with Core Data Centers, has announced a phased expansion of its Brampton, Ontario data center. This expansion is designed to meet the growing demands of AI clients.

Telehouse: 250 Front Street West Data Center Photos See all

The building is home to the CBC (and a data center)
250 Front Street West
Source: Baxtel

The building is home to the CBC (and a data center)

The CBC Building with the Toronto Needle in the Background
Source: Baxtel

Operating Company

Operated by:

Telehouse is a subsidiary of KDDI Corporation. KDDI was founded in 1984 and is headquartered in Tokyo, Japan.

History (by site):


1989: New York Teleport site
1990: London Docklands North
1997: New York 25 Broadway
1997: London Metro
1998: Expanded to Los Angeles
1999: London Docklands East
1999: Paris Voltaire
2000: Asian expansion in Hong Kong & Seoul
2008: Beijing BEZ & Singapore
2009: Paris Magny
2010: London Docklands West
2010: Hanoi & Shanghai Jinqiao
2010: Johannesburg
2011: Hong Kong CCC
2011: New York Chelsea
2011: Istanbul
2012: Frankfurt and Moscow
2012: Beijing BDA
2013: Shanghai Zhangjiang

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Telehouse Breaks Ground on New London Facility
Telehouse Breaks Ground on New London Facility

Telehouse Breaks Ground on New London Facility

October 22, 2025 Telehouse

Data center firm Telehouse has broken ground on a new facility in London, the 33MW Telehouse West Two data center at its existing Docklands campus in East London. The nine-storey building will cover a total gross area of 32,000 sqm (344,445 sq ft), with 11,290 sqm (121,524 sq ft) of white space...

Read more
Read Cryptominer Hive Digital acquires Toronto data center
Cryptominer Hive Digital acquires Toronto data center

Cryptominer Hive Digital acquires Toronto data center

June 25, 2025 Toronto

Crypto firm Hive Digital this week announced the signing of a purchase and sale agreement to acquire a facility with 7.2MW of installed capacity. Hive said the acquisition will support the development of a “sovereign Canadian AI ecosystem” through its wholly owned subsidiary, Buzz High...

Read more
Read Telehouse launches liquid cooling lab at London data center
Telehouse launches liquid cooling lab at London data center

Telehouse launches liquid cooling lab at London data center

January 20, 2025 Telehouse

Telehouse has teamed up with four cooling technology vendors; Accelsius, EkkoSense, JetCool, and Legrand to launch a liquid cooling lab at its London data center. Liquid cooling technologies from these vendors will be on display at Telehouse South, at the company’s London Docklands campus. Mark...

Read more
Read Telehouse launches from three data centers in Toronto, Canada
Telehouse launches  from three data centers in Toronto, Canada

Telehouse launches from three data centers in Toronto, Canada

June 13, 2024 Telehouse

KDDI-owned Telehouse Canada this week officially launched its first three data centers in downtown Toronto and is now offering services from three carrier-neutral data centers, located at 151 Front Street West, 250 Front Street West, and 905 King Street West."We are the first global leader with...

Read more
Read Telehouse launches fifth facility in Frankfurt
Telehouse launches fifth facility in Frankfurt

Telehouse launches fifth facility in Frankfurt

December 29, 2023 Telehouse

Telehouse has launched and fully leased its fifth data center at its Frankfurt campus dubbed building M. This data center now adds 4.5 MW of IT capacity which has been fully leased less than two months since its opening. Dr. Béla Waldhauser, managing director of Telehouse Deutschland said, "It’s...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?