|
1.69 miles
|
Centersquare: Mississauga YYZ1
|
One story building
Raised floor (inches) = 24 and 30
|
|
2.54 miles
|
11:11 Systems: Mississauga, ON
|
11:11 Systems acquired the facility from Sungard Availability Services (Sungard AS) in November 2022.
|
|
5.98 miles
|
CentriLogic Mississauga (North)
|
18″ raised floor with hot/cold aisle configuration
24/7/365 Security & Multi-level Biometric Access Control
|
|
6.37 miles
|
CentriLogic Mississauga (South)
|
|
|
7.23 miles
|
Excell IT
|
|
|
7.94 miles
|
Central CampusInterested in this information?Contact us
|
Buzz HPC, a subsidiary of HIVE Digital Technologies, has secured two parcels of land totaling 25 acres in the Greater Toronto Area for CA$58 million (US$42.21m) to construct a HPC data center.
|
|
8.87 miles
|
Hut 8: Mississauga DC
|
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
|
|
10.68 miles
|
Cogent Mississauga
|
|
|
11.33 miles
|
eStruxture TOR-3 (Etobicoke)
|
|
|
11.73 miles
|
Compass Toronto Etobicoke
|
|
|
12.14 miles
|
Equinix Brampton TR6
|
|
|
12.19 miles
|
Equinix Brampton TR7
|
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
|
|
12.55 miles
|
Whipcord Edge: TDC01
|
|
|
12.55 miles
|
Canada15Edge Toronto West
|
|
|
13.63 miles
|
Urbacon: Toronto West DC7
|
DC7 is situated in a prime Toronto location accessible by transit and close to Canada's largest international transportation hub.
|
|
14.26 miles
|
RidgeInterested in this information?Contact us
|
Microsoft is building a new data center on the site of a now-closed Lowe’s store between Islington Avenue and Highway 401 in Toronto, Canada.
|
|
15.96 miles
|
ServerFarm Toronto TOR1
|
Site is approximately 7.14 acres
Three 10,000 SF data halls with ample office and conference space
|
|
16.59 miles
|
OneInterested in this information?Contact us
|
Microsoft is investing $69 million CAD in a new data center campus in Vaughan, Ontario.
|
|
16.63 miles
|
Core ParkInterested in this information?Contact us
|
This facility is part of Microsoft's YT011 data center campus in Vaughan, Ontario.
|
|
17.18 miles
|
Compass: North York
|
|
|
17.41 miles
|
Beanfield 23 Fraser
|
|
|
17.87 miles
|
1 Century Place (TOR1) Digital Realty
|
This site was originally operated by Dupont Fabros as TOR1 before being acquired in Sept 2017 by Digital Realty Trust in a $7.6 Billion 12 datacenter deal.
Located just outside the city of Toronto in nearby Vaughan, this Canadian wholesale data centre spans over 66,000 square metres (711,000 square feet) with a critical power capacity of up to 46 megawatts. The site was the former Toronto Star Printing plant.
|
|
18.04 miles
|
Telehouse: 905 King Street West
|
Telehouse has acquired three data centers in Canada, marking its entry into the country.
|
|
18.05 miles
|
Beanfield 905 King St
|
|
|
18.05 miles
|
Cologix Toronto TOR2
|
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
|
|
18.05 miles
|
Contegix Toronto
|
|
|
18.05 miles
|
Cologix TOR3
|
|
|
19.26 miles
|
Telehouse: 250 Front Street West
|
Telehouse has acquired three data centers in Canada, marking its entry into the country.
|
|
19.44 miles
|
Hive DC: Toronto
|
Hive Data Center's highly connected TOR-1 site has extensive connectivity to Canada’s largest city and direct paths to the US Mid-west.
|
|
19.45 miles
|
Cologix Toronto TOR1
|
Cologix operates seven discrete Toronto data centres at 151 Front Street West (TOR 1), Canada’s largest and most important carrier hotel.
|
|
19.45 miles
|
Neutral Data Toronto
|
|
|
19.45 miles
|
Equinix Toronto TR1
|
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
|
|
19.46 miles
|
Amanah: TOR1
|
Located on the 3rd floor, TOR 1 is Amanah's primary data center suite.
|
|
19.46 miles
|
Digital Realty 151 Front
|
|
|
19.46 miles
|
Priority Colo TOR1
|
|
|
19.46 miles
|
eStruxture TOR-1
|
|
|
19.47 miles
|
Amanah: TOR2
|
Situated on the 6th floor of the same building, TOR 2 serves as a high-availability extension of TOR 1.
|
|
19.47 miles
|
Telehouse: 151 Front Street West
|
Telehouse has acquired three data centers in Canada, marking its entry into the country.
|
|
19.51 miles
|
eStruxture TOR-2
|
|
|
19.57 miles
|
CenriLogic Toronto
|
|
|
19.57 miles
|
Equinix Toronto TR4
|
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
|
|
19.67 miles
|
Qscale: Toronto
|
Qscale, a Canadian company, plans to build a multi-billion-dollar data center in Toronto.
|
|
19.67 miles
|
Central CampusInterested in this information?Contact us
|
Crypto firm Hive Digital (through its subsidiary Buzz High Performance Computing Inc.) has acquired a data center in Toronto, Canada.
|
|
19.70 miles
|
TNW Toronto
|
|
|
19.87 miles
|
Canada Cloud Data Centre
|
|
|
19.99 miles
|
CORE Brampton
|
55H, in partnership with Core Data Centers, has announced a phased expansion of its Brampton, Ontario data center. This expansion is designed to meet the growing demands of AI clients.
|