Osaka Data Center Market

Latest Podcast

The Osaka data center market is located in the prefecture of Osaka Prefecture within Asia-Pacific (APAC). Osaka has 76 facilities.

The top providers in Osaka are NTT (8 sites) and Softbank Corp. with 4 facilities . The most popular facilities are Equinix Osaka OS1 and Equinix Osaka OS3.

Market Facts

Osaka Data Center Map

Osaka Power Growth Over Time

+196% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Osaka

Name Company Size Status Type
Equinix Osaka OS1 Equinix Extra Small Operational Carrier-Neutral
Equinix Osaka OS3 Equinix Small Operational Carrier-Neutral
Equinix: OS2x Equinix Small Operational Carrier-Neutral
Equinix: OS4x Equinix Small Operational Carrier-Neutral
Equinix: OS5x Equinix Medium Construction Carrier-Neutral
Equinix: OS6 Equinix Small Construction, Planned Carrier-Neutral
STACK Osaka KIX01 STACK INFRASTRUCTURE Medium Construction HPC
STACK: KIX01B STACK INFRASTRUCTURE Medium Planned HPC
STACK: KIX01C STACK INFRASTRUCTURE Large Planned HPC
INAP Osaka HorizonIQ Operational Carrier
NTT Osaka OS4 NTT Operational Carrier-Neutral (Telco-Owned)
NTT Osaka 7 NTT Large Operational Carrier-Neutral (Telco-Owned)
NTT: Osaka North 1(OSK12) NTT Small Construction Carrier-Neutral (Telco-Owned)
NTT OS2 (Telepark Dojima Building 2) NTT Operational Carrier-Neutral (Telco-Owned)
NTT OS3 (Telepark Dojima Building 3) NTT Operational Carrier-Neutral (Telco-Owned)
NTT Osaka 5 NTT Small Operational Carrier-Neutral (Telco-Owned)
NTT Keihanna OSK11 NTT Medium Operational Carrier-Neutral (Telco-Owned)
NTT: Nishiai NTT Large Construction, Planned Carrier-Neutral (Telco-Owned)
NTT: OSK12 Bldg-2 NTT Medium Planned Carrier-Neutral (Telco-Owned)
Telehouse: Osaka 2 Telehouse Small Operational Carrier-Neutral (Telco-Owned)
Telehouse: Osaka Shinsaibashi Telehouse Operational Carrier-Neutral (Telco-Owned)
Telehouse: Osaka Umeda Telehouse Operational Carrier-Neutral (Telco-Owned)
Vantage: Osaka KIX11 Vantage Data Centers Medium Operational Carrier-Neutral
Vantage: KIX12 Vantage Data Centers Large Construction Carrier-Neutral
Colt Osaka Keihanna Colt Data Centre Services Large Operational Carrier
Colt: Minoh 1 Colt Data Centre Services Large Planned Carrier
Colt: Minoh 2 Colt Data Centre Services Large Planned Carrier
KDDI: Sakai, Osaka KDDI Large Operational Carrier
AirTrunk: Osaka OSK1 AirTrunk Medium Operational Carrier-Neutral
AirTrunk: Osaka OSK2 AirTrunk Medium Planned Carrier-Neutral
AirTrunk: OSK2 Expansion AirTrunk Large Planned Carrier-Neutral
CloudHQ: Cosmosquare KIX1 CloudHQ Construction, Operational Carrier-Neutral
CloudHQ: Cosmosquare KIX2 CloudHQ Planned Carrier-Neutral
CloudHQ: KIX3 CloudHQ Large Planned Carrier-Neutral
NTT Data Osaka Dojima (Building #4) NTT Data Operational MSP
Empyrion: Osaka JP2 Empyrion Digital Small Planned Carrier-Neutral
MC Digital Osaka 1 (KIX10) MC Digital Realty Small Operational Carrier-Neutral
MC Digital Osaka 2 (KIX11) MC Digital Realty Medium Operational Carrier-Neutral
MC Digital Osaka 3 (KIX12) MC Digital Realty Medium Operational Carrier-Neutral
MC Digital Osaka 4 (KIX13) MC Digital Realty Medium Operational Carrier-Neutral
MC Digital Realty: KIX15 MC Digital Realty Medium Construction Carrier-Neutral
MC Digital Realty: KIX14 MC Digital Realty Medium Planned Carrier-Neutral
Mapletree: Osaka Mapletree Redwood Data Centre Trust Small Operational Real Estate
Digital Edge: Osaka OSA2 Digital Edge DC Small Operational Carrier-Neutral
Digital Edge: Osaka OSA1 Digital Edge DC Small Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Digital Edge DC Large Planned Carrier-Neutral
SC Zeus: Osaka 1 SC Zeus Data Centers Medium Construction Carrier-Neutral
SC Zeus: Osaka 2 SC Zeus Data Centers Medium Planned Carrier-Neutral
NEC: Kobe 1 NEC Corporation Small Operational Enterprise
NEC: Kobe 2 NEC Corporation Small Operational Enterprise
NEC: Kobe 3 NEC Corporation Small Operational Enterprise
ADA: Osaka East 1 Ada Infrastructure Medium Planned Carrier-Neutral
ESR Group: Cosmosquare OS1 ESR Group Medium Construction, Operational Real Estate
ESR Group: Cosmosquare OS2 ESR Group Medium Planned Real Estate
ESR Group: OS3 ESR Group Large Planned Real Estate
ESR Group: Keihanna OS4 ESR Group Large Construction, Planned Real Estate
ESR Group: Minoh, Osaka ESR Group Extra Large Planned Real Estate
ESR Group: Cosmosquare OS3 ESR Group Large Planned Real Estate
SoftBank: Osaka Suita Softbank Corp. Operational Private Equity
SoftBank: Sakai Softbank Corp. Large Construction, Prospective Expansion Private Equity
SoftBank: Nara Ikoma Softbank Corp. Large Operational, Planned Private Equity
SoftBank: Osaka No. 3 Softbank Corp. Extra Small Operational Private Equity
Optage: Sonezaki Optage Inc. Extra Small Operational Carrier
Optage: Umeda North Optage Inc. Small Operational Carrier
Optage: Shinsaibashi Optage Inc. Operational Carrier
Optage: Shinmachi Optage Inc. Operational Carrier
IIF Osaka Toyonaka Optage Inc. Operational Carrier
Kagoya: Keihanna Lab A Kagoya Japan Extra Small Operational Colo Reseller
Kagoya: Keihanna Lab B Kagoya Japan Extra Small Operational Colo Reseller
Goldman Sachs: Higashiosaka Goldman Sachs Land Bank Fintech
NRI: Osaka Data Center II Building 1 Nomura Research Institute Small Operational
NRI: Osaka Data Center II Building 2 Nomura Research Institute Extra Small Operational
TISI: Osaka 2nd DC (Shinsaibashi gDC) TISI Inc. Small Operational MSP
TISI: Osaka 3rd DC (Shinsaibashi gDC-EX) TISI Inc. Extra Small Operational MSP
TISI: Osaka 1st DC TISI Inc. Extra Small Operational MSP
Valley OneInterested in this information?Contact us Amazon AWS Small Operational Hyperscale

Largest Providers in Osaka

NTT
Site
Power
Operational
6
79.1
Construction
2
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
8
View Provider
Softbank Corp.
Site
Power
Operational
3
26.5
Construction
1
Planned
1
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
4
View Provider
MC Digital Realty
Site
Power
Operational
5
73.5
Construction
1
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
6
View Provider
Vantage Data Centers
Site
Power
Operational
1
28.0
Construction
1
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider

Largest Data Centers in Osaka

Sites Under Construction in Osaka

Location Building SqFt Power (MW) Estimated Launch
NTT: Osaka North 1(OSK12) SqFt 6 Megawatts
SoftBank: Sakai 8,072,933 SqFt 100 Megawatts Q4 2026
Vantage: Osaka KIX11 200,000 SqFt 0 Megawatts Q1 2026
SC Zeus: Osaka 1 SqFt 25 Megawatts Q4 2027
AirTrunk: Osaka OSK1 SqFt 0 Megawatts Q4 2026
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030

Regions in Osaka

Related News See all

Read Telehouse And KDDI Close £220M Purchase Of East India Dock Campus
Telehouse and its parent KDDI have completed the purchase of the Inventory Estate in East India Dock, London, for more than £220 million. The sellers are LaSalle Investment Management and Trilogy R...

Telehouse And KDDI Close £220M Purchase Of East India Dock Campus

October 29, 2026 Telehouse

Telehouse and its parent KDDI have completed the purchase of the Inventory Estate in East India Dock, London, for more than £220 million. The sellers are LaSalle Investment Management and Trilogy Real Estate, and the deal values the campus at US$294 million, Telehouse said. Telehouse says 65 MVA...

Read more
Read NTT Data Adds AI Factories In Paris And Singapore, Bringing Total To Five
NTT Data has launched AI Factory GPU clusters in [Paris](https://baxtel.com/regions/paris) and [Singapore](https://baxtel.com/regions/singapore), expanding its network of AI evaluation environments...

NTT Data Adds AI Factories In Paris And Singapore, Bringing Total To Five

October 29, 2026 NTT Data

NTT Data has launched AI Factory GPU clusters in Paris and Singapore, expanding its network of AI evaluation environments to five sites. The company announced the expansion on October 27, and the new facilities join AI Factories in Plano, Texas, and Riyadh, Saudi Arabia. Data Center Dynamics...

Read more
Read AirTrunk Secures A$4.25B Green Loan for SYD3 Sydney Campus
AirTrunk has secured an [A$4.25 billion green loan](https://airtrunk.com/airtrunk-secures-a4-25b-green-loan-for-syd3-western-sydney-expansion-supporting-australias-digital-economy) to fund continue...

AirTrunk Secures A$4.25B Green Loan for SYD3 Sydney Campus

October 28, 2026 AirTrunk

AirTrunk has secured an A$4.25 billion green loan to fund continued development of its SYD3 campus in Western Sydney. Reuters put the facility at about US$2.98 billion. Thirty-two local and international financial institutions backed the debt, which 14 lead banks underwrote. AirTrunk develops and...

Read more
Read Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico
Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, [New Mexico](https://baxtel.com/regions/new-mexico). ...

Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico

October 27, 2026 STACK INFRASTRUCTURE

Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, New Mexico. The contractors placed the final structural beam atop the building, completing its primary structural framework, Clayco announced on October...

Read more
Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Ready to Level up Your