NEC: Kobe 2

Latest Podcast 5 Chome Takatsukadai
Operational
Fully operational facility
Operated by:

NEC: Kobe 2

Site: NEC: Kobe 1
Short Code: DC2
Year Built: 2019
░░░ Request Dataset MW
Operational Power

The facility is a part of NEC's Kobe Data Center Campus in Japan.

Map and Nearby Locations

5 Chome Takatsukadai
NEC Corporation Sites
Nearby Facilities

NEC: Kobe 2 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NEC: Kobe 2

Distance Site About
0.05 miles NEC: Kobe 1
NEC's Kobe Data Center opened in April 2016 with 1,500 racks. The campus underwent its first expansion in March 2019. The phase 3 building launched in 2024.
0.09 miles NEC: Kobe 3
The facility is a part of NEC's Kobe Data Center Campus in Japan.
14.74 miles Carrier-Neutral Data CenterInterested in this information?Contact us
14.76 miles Digital Edge: Osaka OSA2
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).

Operating Company

Operated by:
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Starts Construction of KIX15 Data Center in Japan
Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty...

Digital Realty Starts Construction of KIX15 Data Center in Japan

October 09, 2026 Digital Realty Trust

Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty and Mitsubishi Corporation, KIX15 will be the campus’s fifth building. Operations are expected to...

Read more
Read Multifeed launches JPNAP service at Osaka 7 Data Center
Multifeed launches JPNAP service at Osaka 7 Data Center

Multifeed launches JPNAP service at Osaka 7 Data Center

April 24, 2023 Osaka

Internet Multifeed has announced that it has added the Osaka Data Center 7 in Ibaraki City, Osaka Prefecture, to its JPNAP service. The data center is operated by NTT Communications Corporation and will go online for operations in May 2023.According to the company, the data center is one of the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?