Kagoya: Keihanna Lab A
The data center's first three-story Building A was built in 2006, with a four-story Building B added in 2014. Currently, the two are connected by a walkway, providing server space for up to 650+ racks.
KAGOYA JAPAN Inc. is a hosting and cloud company headquartered in Kyoto, Japan, with offices in Osaka and in Shinjuku, Tokyo. Sadahiro Kitagawa is representative director, chairman and CEO. The company offers rental servers, VPS, cloud and bare-metal servers, private cloud, GPU and HPC computing, business email, and housing and colocation under the DC+ brand. It operates its own data center, Kagoya Keihanna Lab, in the Keihanna Science City area of Kyoto Prefecture. Building A opened in May 2006 with 252 racks, and Building B opened in June 2014 with 400 racks. The site takes extra-high-voltage power on two lines and has N+1 UPS and emergency generators. Kagoya holds ISO 27001 certification and the Japanese Privacy Mark.
The data center's first three-story Building A was built in 2006, with a four-story Building B added in 2014. Currently, the two are connected by a walkway, providing server space for up to 650+ racks.
The facility Lab B is a four-story building located on Kagoya's Keihanna Campus in Kyoto, Japan. It covers an area of 3275.29 square meters (including corridors) and has a capacity of 400 racks.
November 20, 2026 Osaka
CyrusOne and Kansai Electric Power Company have topped out OSK1, the first data center under their Japanese joint venture, at a planned 48MW of IT capacity. CyrusOne and KEP marked the structural completion this week with a traditional Jōtōshiki ceremony. CyrusOne KEP, the 50:50 joint venture the...
Read more
October 13, 2026 Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...
Read more
October 13, 2026 Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...
Read more
October 10, 2026 Osaka
Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...
Read more
October 09, 2026 Osaka
Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty and Mitsubishi Corporation, KIX15 will be the campus’s fifth building. Operations are expected to...
Read more
April 24, 2023 Osaka
Internet Multifeed has announced that it has added the Osaka Data Center 7 in Ibaraki City, Osaka Prefecture, to its JPNAP service. The data center is operated by NTT Communications Corporation and will go online for operations in May 2023.According to the company, the data center is one of the...