SoftBank: Nara Ikoma

Latest Podcast 8916-47 Takayama-cho
OperationalPlanned
Operational with future phases planned
Operated by:

SoftBank: Nara Ikoma

Year Built: 2025
Utility Provider: Kansai Electric Power (Kansai Transmission & Distribution)
Floors: 4
Ownership: Softbank Corp. owned and operated by softbank corp. idc frontier operated the site until its data center business moved into softbank on april 1, 2026. the building.
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Site History

  • March 2022: SoftBank presented the project, then called the "Kansai New Center," to Ikoma City.
  • June 2022: SoftBank and BBIX received a national data center subsidy from the Ministry of Internal Affairs and Communications.
  • July 2023: The structural design of Building A received ministerial certification.
  • July 2025: SoftBank held a completion ceremony for Building A.
  • October 2025: Building A opened, operated by IDC Frontier.
  • December 2025: BBIX opened its Osaka No. 9 internet exchange point inside the facility.
  • April 2026: IDC Frontier's data center business moved into SoftBank Corp.

Project Profile

  • Owner and operator: SoftBank Corp.
  • Site: former NEC Kansai Research Laboratories, 8916-47 Takayama-cho
  • Buildings: Building A operating, Building B planned, about 40,000 m² in total at full build
  • Building A: 17,835 m² gross floor area, four floors, steel frame, seismic base isolation, designed by Nikken Sekkei
  • Cooling: central chiller plant, wall-mounted cooling units, hot-aisle containment, and direct liquid cooling up to 150 kW per rack
  • Rack power: 9 to 30 kVA air-cooled, 50 to 120 kVA liquid-cooled
  • Resilience: main and standby utility feeds, N+1 generators with 72 hours of fuel, N+1 UPS
  • Connectivity: BBIX internet exchange on site
  • Customers: AI and GPU deployments, enterprise systems, and disaster recovery

Map and Nearby Locations

8916-47 Takayama-cho
Softbank Corp. Sites
Nearby Facilities

SoftBank: Nara Ikoma Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of SoftBank: Nara Ikoma

Distance Site About
1.49 miles ADA: Osaka East 1
GLP's data center subsidiary, Ada Infrastructure, plans to build a four-story data center in East Osaka, Japan. The site will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
1.61 miles MC Digital Realty: KIX14
KIX14 is a planned MC Digital Realty data center in Ikoma City, Nara Prefecture, east of Osaka. The design calls for a base-isolated building with four floors above ground. MC Digital Realty is the 50/50 joint venture of Mitsubishi Corporation and Digital Realty.
1.72 miles STACK Osaka KIX01
Located in Osaka’s eastern suburb of Keihanna, this data center campus will comprise three buildings with robust access to power and network to ensure strong reliability.
1.72 miles ESR Group: Keihanna OS4
ESR Group and STACK Infrastructure, major players in APAC's New Economy real estate and global digital infrastructure, are jointly building a new data center campus in Keihanna, Japan (Kansai region).
1.73 miles STACK: KIX01C
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
1.77 miles STACK: KIX01B
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
1.82 miles NTT Keihanna OSK11
1.88 miles Colt Osaka Keihanna
2.96 miles Kagoya: Keihanna Lab B
The facility Lab B is a four-story building located on Kagoya's Keihanna Campus in Kyoto, Japan. It covers an area of 3275.29 square meters (including corridors) and has a capacity of 400 racks.
2.97 miles Kagoya: Keihanna Lab A
The data center's first three-story Building A was built in 2006, with a four-story Building B added in 2014. Currently, the two are connected by a walkway, providing server space for up to 650+ racks.
4.19 miles EdgeConneX: Kyotanabe 2
This facility is part of EdgeConneX Kyotanabe campus in Osaka.
4.21 miles EdgeConneX: Osaka Kyotanabe
EdgeConneX has broken ground on a 200MW AI-ready data center campus in Kyotanabe, Greater Osaka, Japan, spanning approximately 130,000 sqm (1.4 million sq ft). Construction began in March 2026, with the first 28MW phase expected online by early 2028, followed by phased expansion to full capacity.
7.15 miles Goldman Sachs: Higashiosaka
Goldman Sachs acquired land to build a data centre in Daito, Higashiosaka.
7.33 miles EdgeConneX: Yawata 3
This facility is part of EdgeConneX Yawata Campus in Osaka.
7.36 miles EdgeConneX: Osaka Yawata
EdgeConneX expands in Japan, securing a long-term land lease for its second data center site in Greater Osaka/Yawata.
7.38 miles EdgeConneX: Yawata 2
This facility is part of EdgeConneX Yawata Campus in Osaka.
11.64 miles NTT Osaka 7
11.75 miles Equinix Osaka OS3
11.80 miles Telehouse: Osaka 2
Built as the major Telehouse Data Center for the west of Japan, The Osaka 2 Data Center facility began service on 21st August, 2015.
11.81 miles Digital Edge: Osaka OSA1
12.68 miles NTT: Nishiai
NTT acquired eight acres in Osaka Nishiai to develop two data centers, with the first facility expected to open in fiscal year 2027.
12.72 miles SoftBank: Osaka Suita
SoftBank data center in Suita, about 5 km from central Osaka, with dedicated links to the Dojima internet exchange.
12.89 miles Telehouse: Osaka Umeda
KDDI Telehouse operates a colocation data center in Umeda, Osaka.
12.89 miles Optage: Umeda North
This state-of-the-art data center began operations in 2012. The facility encompasses 11,534 square meters of gross floor area, with 4,000 square meters dedicated to colocation space containing 1,300 racks.
12.89 miles SoftBank: Osaka No. 3
SoftBank data center inside OPTAGE's Umeda Kita data center building in Kita Ward, Osaka, in service since 2012.
13.19 miles NTT OS2 (Telepark Dojima Building 2)
13.28 miles NTT Osaka OS4
13.30 miles Optage: Sonezaki
Named 'Optage Sonezaki Data Center,' the 14-story carrier-neutral facility will offer 24,100 square feet (2,250 square meters) of space and incorporate seismic isolation design for earthquake protection.
13.38 miles Equinix: OS6
OS6 is Equinix's new retail colocation tower in Kyutaromachi, Chuo Ward, in central Osaka. The 13-story building is rising on a former parking lot beside Chuo-odori. Phase 1 opens in tranches from late 2027 through late 2028.
13.78 miles Empyrion: Osaka JP2
13.78 miles AirTrunk: Osaka OSK2
AirTrunk’s newly announced OSK2 project is a massive hyperscale development located in East Osaka, designed specifically to meet the surging demand for cloud and artificial intelligence (AI) infrastructure in the Kansai region.
13.78 miles AirTrunk: OSK2 Expansion
14.09 miles Vantage: Osaka KIX11
Located in Ibaraki, the Osaka campus comprises 485,000 square feet (45,000 square meters) and features two four-story, state-of-the-art facilities built to withstand even the worst earthquakes.
14.09 miles NTT: Osaka North 1(OSK12)
NTT Global Data Centers has officially broken ground on its Osaka North 1 (OSK12) data center in Ibaraki City, marking a significant expansion into one of Japan’s fastest-growing digital hubs.
14.09 miles Vantage: KIX12
This facility will be part of Vantage's Osaka (KIX1) Campus in Osaka, Japan.
14.12 miles NTT OS3 (Telepark Dojima Building 3)
14.13 miles NTT Data Osaka Dojima (Building #4)
14.20 miles CapitalLand: Osaka 01
The new facility will include more than nine data halls along with dedicated office and working spaces to support operations.
14.20 miles Telehouse: Osaka Shinsaibashi
KDDI Telehouse operates a colocation data center in Shinsaibashi, Japan.
14.20 miles Optage: Shinsaibashi
The Shinsaibashi Data Center in central Osaka was launched in 2008. OPTAGE will establish a new connectivity area “Shinsaibashi POP (Point Of Presence)” within the existing Shinsaibashi Data Center in Osaka City By 2025.
14.21 miles North RidgeInterested in this information?Contact us
14.21 miles INAP Osaka
14.24 miles Mapletree: Osaka
The multi-story facility is built on a 4,200 sqm site and offers 13,330 sqm of total space, including 12,720 sqm of lettable area. The property comes with a 70-year land lease that began October 1, 2020.
14.30 miles NTT Osaka 5
14.34 miles Equinix Osaka OS1
Opened in 2013, the first phase, with room for 320 cabinets is a US$12m investment. Once fully opened the site will carry 800 cabinets.
14.35 miles Optage: Shinmachi
14.77 miles IIF Osaka Toyonaka
The IIF Osaka Toyonaka Data Center facility, constructed in September 1991, stands on a 4,769.70-square-meter plot of land. The building features a total floor area of 20,027.14 square meters.
15.13 miles NRI: Osaka Data Center II Building 1
NRI's Osaka Data Center II is Nomura Research Institute's Kansai core and disaster-recovery data center in the Saito district of Ibaraki City. Building 1 opened in 2016 as a base-isolated facility certified to JDCC Tier 4. NRI runs its shared financial systems and outsourcing services here, and TIS markets colocation as GDC Osaka.
15.18 miles NRI: Osaka Data Center II Building 2
Building 2 of NRI's Osaka Data Center II opened in February 2023 beside Building 1 in the Saito district of Ibaraki City. The two buildings share power-receiving equipment and serve NRI's shared financial systems and outsourcing services.
15.20 miles MC Digital Realty: KIX15
KIX15 is MC Digital Realty's fifth data center on its KIX Campus in the Saito district of Ibaraki City, north of Osaka. The base-isolated building rises beside KIX10 and supports hybrid air and liquid cooling for hyperscale, cloud, and AI customers. MC Digital Realty is the 50/50 joint venture of Mitsubishi Corporation and Digital Realty.
15.23 miles MC Digital Osaka 1 (KIX10)
15.29 miles MC Digital Osaka 2 (KIX11)
15.34 miles MC Digital Osaka 3 (KIX12)
15.48 miles MC Digital Osaka 4 (KIX13)
15.55 miles Equinix: OS5x
15.56 miles Equinix: OS4x
Equinix's fourth data center in Osaka, Japan, is connected to the adjacent OS2x in Minoh City, Osaka Prefecture. The facility has 4,925 square meters (53,025 square feet) of data center space.
15.56 miles Equinix: OS2x
16.50 miles ESR Group: Minoh, Osaka
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
16.50 miles Colt: Minoh 2
This facility is part of Colt's Minoh Campus in Osaka, Japan.
16.50 miles Colt: Minoh 1
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
17.20 miles NTT: OSK12 Bldg-2
17.42 miles AirTrunk: Osaka OSK1
Located in West Osaka, the development consists of a 16,500sqm facility dedicated to high-scale cloud requirements.
18.81 miles SC Zeus: Osaka 2
This facility is part of SC Zeus' Project Zeus OSA1 campus in Osaka.
18.84 miles SC Zeus: Osaka 1
SC Zeus, a leader in sustainable data center solutions, is developing Project ZEUS OSA 1 in Osaka, a campus that will comprise two buildings.
18.99 miles ESR Group: Cosmosquare OS1
The newly completed data center is the first hyperscale facility within ESR's Cosmosquare campus. At full build-out, the US$2 billion campus will comprise three buildings.
19.00 miles ESR Group: OS2
This facility is part of ESR Group's Cosmosquare campus in Osaka.
19.01 miles CloudHQ: KIX2
This facility is part of CloudHQ's Cosmosquare campus in Osaka.
19.01 miles CloudHQ: Cosmosquare KIX1
Strategically positioned in Nanko Kita, Osaka City, CloudHQ's Cosmosquare is a future-proof, three-phase hyperscale data center campus (KIX1, KIX2, KIX3).
19.07 miles ESR Group: OS3
This facility is part of ESR Group's Cosmosquare campus in Osaka.
19.07 miles CloudHQ: KIX3
This facility is part of CloudHQ's Cosmosquare campus in Osaka.
19.65 miles SoftBank: Sakai
SoftBank is converting part of Sharp's former LCD panel plant in Sakai, Osaka, into a large AI data center. SoftBank bought the site in 2025 and plans to expand its power capacity in phases.
19.71 miles KDDI: Sakai, Osaka
KDDI has launched an AI data center at the former Sharp Sakai factory site in Osaka Prefecture.

Operating Company

Operated by:

SoftBank Corp. (TOKYO: 9434) is a leading Japanese technology and telecommunications company that stands at the forefront of the Information Revolution. As a key player within the SoftBank Group, the company leverages cutting-edge technologies including artificial intelligence, Internet of Things (IoT), and robotics to drive innovation across multiple sectors.
Going beyond traditional telecommunications, SoftBank Corp. focuses on developing transformative services and solutions that create value for society. The company's vision is encapsulated in its corporate philosophy "Information Revolution — Happiness for everyone," reflecting its commitment to using technology to enhance human wellbeing and societal progress.
Operating under the dynamic slogan "Smart & Fun!", SoftBank Corp. promotes an innovative workplace culture that emphasizes both productivity and employee satisfaction. The company embraces modern workstyles powered by IT and AI, fostering an environment where creativity and intelligence converge with enjoyment to drive sustainable growth and meaningful technological advancement.

0
Facilities
0
Markets

News See all

Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read SoftBank to Roll out “AI Data Center GPU Cloud” Platform in Japan
SoftBank to Roll out “AI Data Center GPU Cloud” Platform in Japan

SoftBank to Roll out “AI Data Center GPU Cloud” Platform in Japan

May 26, 2026 Softbank Corp.

SoftBank Corp. is set to launch an “AI Data Center GPU Cloud” service in Japan starting October 2026. The offering will form part of SoftBank Corp.’s neocloud business and will be built on its Infrinia AI Cloud OS stack. A beta version is already available. The service will run on SoftBank’s AI...

Read more
Read Multifeed launches JPNAP service at Osaka 7 Data Center
Multifeed launches JPNAP service at Osaka 7 Data Center

Multifeed launches JPNAP service at Osaka 7 Data Center

April 24, 2023 Osaka

Internet Multifeed has announced that it has added the Osaka Data Center 7 in Ibaraki City, Osaka Prefecture, to its JPNAP service. The data center is operated by NTT Communications Corporation and will go online for operations in May 2023.According to the company, the data center is one of the...

Read more
Read ESR Already Developing its 19.2MW OS1data center in Osaka, Japan
Baxtel

ESR Already Developing its 19.2MW OS1data center in Osaka, Japan

November 08, 2022 Osaka

Asia’s ESR Group has started work on its 19.2MW facility in Osaka, Japan. The real estate company revealed that the Cosmosquare OS1 data center would be phase 1 of its three-phase facility at Nanko Kita. The company plans to develop a total of 96MW on the site. OS1 is scheduled to be completed in...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?