Digital Edge: Osaka OSA2

Latest Podcast 8 Chome-2-1 Kanokodai Kitamachi
Operational
Fully operational facility
Operated by:

Digital Edge: Osaka OSA2

Short Code: Kobe KCC
░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC). This transaction represents Digital Edge's largest single investment in Japan to date.

Map and Nearby Locations

8 Chome-2-1 Kanokodai Kitamachi
Digital Edge DC Sites
Nearby Facilities

Sites within 15 miles of Digital Edge: Osaka OSA2

Distance Site About
0.05 miles Carrier-Neutral Data CenterInterested in this information?Contact us
14.67 miles ESR Group: Minoh, Osaka
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
14.67 miles Colt: Minoh 2
This facility is part of Colt's Minoh Campus in Osaka, Japan.
14.67 miles Colt: Minoh 1
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
14.76 miles NEC: Kobe 2
The facility is a part of NEC's Kobe Data Center Campus in Japan.
14.80 miles NEC: Kobe 3
The facility is a part of NEC's Kobe Data Center Campus in Japan.
14.80 miles NEC: Kobe 1
NEC's Kobe Data Center opened in April 2016 with 1,500 racks. The campus underwent its first expansion in March 2019. The phase 3 building launched in 2024.
15.34 miles AirTrunk: Osaka OSK1
Located in West Osaka, the development consists of a 16,500sqm facility dedicated to high-scale cloud requirements.
16.16 miles IIF Osaka Toyonaka
The IIF Osaka Toyonaka Data Center facility, constructed in September 1991, stands on a 4,769.70-square-meter plot of land. The building features a total floor area of 20,027.14 square meters.
16.66 miles Equinix: OS2x
16.69 miles Equinix: OS4x
Equinix's fourth data center in Osaka, Japan, is connected to the adjacent OS2x in Minoh City, Osaka Prefecture. The facility has 4,925 square meters (53,025 square feet) of data center space.
16.70 miles Equinix: OS5x
16.92 miles MC Digital Osaka 4 (KIX13)
16.99 miles MC Digital Osaka 3 (KIX12)
17.04 miles MC Digital Osaka 2 (KIX11)
17.10 miles MC Digital Realty: KIX15
KIX15 is MC Digital Realty's fifth data center on its KIX Campus in the Saito district of Ibaraki City, north of Osaka. The base-isolated building rises beside KIX10 and supports hybrid air and liquid cooling for hyperscale, cloud, and AI customers. MC Digital Realty is the 50/50 joint venture of Mitsubishi Corporation and Digital Realty.
17.13 miles MC Digital Osaka 1 (KIX10)
17.21 miles NRI: Osaka Data Center II Building 2
Building 2 of NRI's Osaka Data Center II opened in February 2023 beside Building 1 in the Saito district of Ibaraki City. The two buildings share power-receiving equipment and serve NRI's shared financial systems and outsourcing services.
17.25 miles NRI: Osaka Data Center II Building 1
NRI's Osaka Data Center II is Nomura Research Institute's Kansai core and disaster-recovery data center in the Saito district of Ibaraki City. Building 1 opened in 2016 as a base-isolated facility certified to JDCC Tier 4. NRI runs its shared financial systems and outsourcing services here, and TIS markets colocation as GDC Osaka.
18.06 miles Vantage: KIX12
This facility will be part of Vantage's Osaka (KIX1) Campus in Osaka, Japan.
18.08 miles Vantage: Osaka KIX11
Located in Ibaraki, the Osaka campus comprises 485,000 square feet (45,000 square meters) and features two four-story, state-of-the-art facilities built to withstand even the worst earthquakes.
18.36 miles SoftBank: Osaka Suita
SoftBank data center in Suita, about 5 km from central Osaka, with dedicated links to the Dojima internet exchange.
19.24 miles CapitalLand: Osaka 01
The new facility will include more than nine data halls along with dedicated office and working spaces to support operations.
19.43 miles ESR Group: OS3
This facility is part of ESR Group's Cosmosquare campus in Osaka.
19.43 miles ESR Group: Cosmosquare OS3
OS3 is the third building planned on ESR's Cosmosquare campus in Nanko Kita, Osaka. It redevelops the IBM Japan Osaka Nanko building on the west side of the campus after that building's lease ends. CloudHQ markets it as KIX3.
19.45 miles CloudHQ: KIX3
This facility is part of CloudHQ's Cosmosquare campus in Osaka.
19.46 miles CloudHQ: Cosmosquare KIX1
CloudHQ operates ESR Group's Cosmosquare OS1 building in Nanko Kita, Osaka, as KIX1, the first building of its KIX campus.
19.46 miles ESR Group: Cosmosquare OS1
OS1 is the first building on ESR's Cosmosquare campus in Nanko Kita, Osaka: a five-storey, base-isolated steel data center designed by NTT Facilities, built by Toda Construction and operated by CloudHQ as KIX1.
19.49 miles CloudHQ: Cosmosquare KIX2
CloudHQ plans to operate ESR Group's Cosmosquare OS2 building in Nanko Kita, Osaka, as KIX2, the second building of its KIX campus.
19.49 miles ESR Group: Cosmosquare OS2
OS2 is the second building planned on ESR's Cosmosquare campus in Nanko Kita, Osaka, on the south half of the parcel it shares with OS1. CloudHQ markets it as KIX2.
19.56 miles NTT Data Osaka Dojima (Building #4)
19.57 miles NTT: Osaka North 1(OSK12)
NTT Global Data Centers has officially broken ground on its Osaka North 1 (OSK12) data center in Ibaraki City, marking a significant expansion into one of Japan’s fastest-growing digital hubs.
19.59 miles SC Zeus: Osaka 1
SC Zeus, a leader in sustainable data center solutions, is developing Project ZEUS OSA 1 in Osaka, a campus that will comprise two buildings.
19.60 miles NTT OS3 (Telepark Dojima Building 3)
19.61 miles SC Zeus: Osaka 2
This facility is part of SC Zeus' Project Zeus OSA1 campus in Osaka.
19.62 miles NTT: Nishiai
NTT acquired eight acres in Osaka Nishiai to develop two data centers, with the first facility expected to open in fiscal year 2027.
19.68 miles Optage: Umeda North
This state-of-the-art data center began operations in 2012. The facility encompasses 11,534 square meters of gross floor area, with 4,000 square meters dedicated to colocation space containing 1,300 racks.
19.69 miles Telehouse: Osaka Umeda
KDDI Telehouse operates a colocation data center in Umeda, Osaka.
19.71 miles TISI: Osaka 1st DC
TISI data center space inside OPTAGE's Umeda Kita building in Kita Ward, Osaka, opened in 2012.
19.72 miles SoftBank: Osaka No. 3
SoftBank data center inside OPTAGE's Umeda Kita data center building in Kita Ward, Osaka, in service since 2012.

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Starts Construction of KIX15 Data Center in Japan
Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty...

Digital Realty Starts Construction of KIX15 Data Center in Japan

October 09, 2026 Digital Realty Trust

Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty and Mitsubishi Corporation, KIX15 will be the campus’s fifth building. Operations are expected to...

Read more
Read Digital Edge Plans 270MWV Data Center Campus Near Mumbai
APAC data center provider Digital Edge is reportedly planning a 270MW data center development near Mumbai, India.According to *The Economic Times*, citing a person familiar with the project, the co...

Digital Edge Plans 270MWV Data Center Campus Near Mumbai

July 06, 2026 Digital Edge DC

APAC data center provider Digital Edge is reportedly planning a 270MW data center development near Mumbai, India.According to The Economic Times, citing a person familiar with the project, the company acquired an approximately 30-acre parcel at the proposed Green Integrated Data Centre Park in...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?