Grain Backs Parent Company of Prime Data Centers
April 09, 2026
Prime Data Centers
This 20MW two-story flex building comprising 145,850 square feet on 4 acres is 100% leased by a leading Fortune 50. The property was built in 2015 as a build-to-suit.
| Distance | Site | About |
|---|---|---|
| 1.25 miles | Lumen Hayward 1 | |
| 2.50 miles | AT&T Hayward | |
| 9.97 miles | T5@Silicon Valley Bldg 2 |
T5 plans to develop an additional three-story 180,000 SF data center building on its Silicon Valley campus.
|
| 10.09 miles | Hyperscale Data Center Request Dataset |
While Apple sold the property to T5 Data Centers in October 2020, it continues to operate there as a tenant.
|
| 10.09 miles | T5@Silicon Valley (Newark) |
T5 acquired the facility from Apple in 2020.
|
| 12.71 miles | Equinix Palo Alto SV8 |
Equinix SV8 is the home of the legendary Palo Alto Internet Exchange.
|
| 12.72 miles | Menlo: Bryant Street Landlord | |
| 12.72 miles | AT&T Palo Alto | |
| 13.70 miles | Hurricane Electric Fremont 1 |
2 Internet Exchange Points (SFMIX and AMS-IX Bay)
20 Internet Networks
6 Carriers with Diverse Fiber
|
| 14.62 miles | Astound: Mountain View | |
| 14.77 miles | Verizon: Fremont |
The site is a previous XO Communications facility
|
| 15.03 miles | Cogent Oakland | |
| 15.04 miles | Hurricane Electric Fremont 2 |
3 Internet Exchange Points (SFMIX, AMS-IX Bay, and FCIX)
70 Internet Networks
7 Carriers with Diverse Fiber
|
| 15.12 miles | Internap Oakland | |
| 15.12 miles | 720 2nd - Digital Realty |
Strategically located in a fiber-rich district and directly adjacent to PG&E substation, the facility is four blocks from Jack London Square and proximate to the central business district of Oakland.
|
| 15.60 miles | Equinix Sunnyvale SV4 | |
| 15.90 miles | Terra Ventures: San Jose, CA |
Terra Ventures has revised its plans for a 9.3-acre site in Alviso, North San Jose.
|
| 16.15 miles | Menlo: MD-SV1 (Sunnyvale) |
Acquired in January 2022, this fully entitled 8.9-acre development site in Sunnyvale, CA features (1) two-story building totaling approximately 244,214 square feet served by an on-site substation.
|
| 16.21 miles | Vantage: Nortech Parkway |
In 2023, Vantage outlined plans to build a data center on a 9.8-acre plot in San Jose's Alviso area.
|
| 16.31 miles | ECL MV1 | |
| 16.55 miles | Equinix Sunnyvale SV6 |
|
| 16.62 miles | Prologis: San Jose 4 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 16.69 miles | Prologis: San Jose 3 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 16.76 miles | Prologis: San Jose 2 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 16.82 miles | Prologis: San Jose, California |
Prologis’ Sustainable Technology, Engineering and Manufacturing (STEM) Park is a landmark 159-acre development in North San Jose designed to anchor the region’s growing AI and semiconductor sectors.
|
| 16.93 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing a new data center campus on a 64.59-acre site in the Alviso neighborhood of Northern San Jose.
|
| 16.94 miles | 200 Paul (SFR1) Digital Realty |
SFR1 (200 Paul Ave.) is the best connected building in the city of San Francisco. The 5 story building was built in 2001 and was renovated in 2014.
|
| 16.94 miles | Verizon: 200 Paul | |
| 16.94 miles | United Layer-SF8 | |
| 16.94 miles | Lumen San Francisco (200 Paul) |
|
| 16.94 miles | United Layer-SF9 | |
| 16.94 miles | United Layer-SF7 | |
| 16.95 miles | Colocation America - San Francisco | |
| 17.03 miles | 400 Paul Ave (1547) |
400 Paul is San Francisco's first purpose-built data center in over 10 years
|
| 17.03 miles | Novva: San Francisco |
Novva plans to invest $500 million in developing a San Francisco campus on the site at 400 Paul Avenue, with the first phase launching in the summer of 2026.
|
| 17.11 miles | 400 Holger Way, San Jose | |
| 17.13 miles | DataBank Santa Clara SFO1 |
|
| 17.16 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Microsoft's Alviso Way Campus in San Jose, California.
|
| 17.26 miles | Guadalupe Quarry Redevelopment Project |
The Guadalupe Quarry Redevelopment Project aims to transform the inactive San Bruno Mountain quarry, located in Brisbane just south of San Francisco.
|
| 17.27 miles | Lumen Emeryville 1 | |
| 17.31 miles | Centersquare: Santa Clara SF02 |
|
| 17.31 miles | 4700 Old Ironsides | |
| 17.37 miles | 4650 Old Ironsides | |
| 17.37 miles | Centersquare: SF02 DC2 |
|
| 17.66 miles | QTS Santa Clara |
QTS's Santa Clara campus has two distinct data center buildings
|
| 17.73 miles | China Telecom Santa Clara | |
| 18.13 miles | Evocative: Emeryville, Oakland OAK1 |
Evocative's Emeryville Data Center Facility (OAK1) is located at 1400 65th Street, Emeryville, CA 94608. Spanning an impressive 15,042 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
| 18.17 miles | Hyperscale Data Center Request Dataset |
This planned facility will be a part of Amazon's 2305 Mission College Blvd Campus. The data center will span 229,974 sqft (21,365 sq m) of space.
|
| 18.19 miles | Hyperscale Data Center Request Dataset |
The project will span two data center buildings, the first spanning 285,768 square feet (26,548 sq m), and the second 229,974 square foot (21,365 sq m).
|
| 18.29 miles | Sierra Morena Tower |
Sierra Morena Tower is a historical AT&T Long Line facility that now operates as a carrier-neutral communication and technology hub.
|
| 18.33 miles | Evocative Santa Clara SJC11 |
Formerly known as Internap Santa Clara SJE-011 before being acquired in September 2022 by Evocative
|
| 18.40 miles | Intel Santa Clara D2P3 |
The facility uses close-coupled evaporative cooling that relies on recycled water, to help it to reach an annualized PUE of 1.06.
|
| 18.44 miles | Lumen San Francisco 1 | |
| 18.53 miles | EdgeCore: SV02 |
EdgeCore's Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 18.55 miles | Equinix Santa Clara SV17 |
|
| 18.59 miles | Equinix Santa Clara SV16 |
|
| 18.61 miles | EdgeCore Silicon Valley |
EdgeCore Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 18.61 miles | Equinix Santa Clara SV15 |
|
| 18.64 miles | DataCanopy: San Francisco |
This facility has been audited under SOC 2 and SOC 3 requirements.
|
| 18.65 miles | Equinix Santa Clara SV14 |
|
| 18.67 miles | Fortress Data Center San Francisco SF1 |
|
| 18.67 miles | CoreSite Milpitas SV2 | |
| 18.74 miles | Verizon: 651 Brannan |
Former XO Communications site
|
| 18.76 miles | 2950 Zanker |
The building is 100% leased on a long-term basis to a major telecommunications company.
|
| 18.78 miles | Centersquare: SF03 DC2 |
|
| 18.80 miles | Element Critical SV1 |
|
| 18.80 miles | Lumen Sunnyvale 1 |
|
| 18.85 miles | CoreSite SV8 |
CoreSite completed construction on SV8 phases I and 2 in the second half of 2019
|
| 18.85 miles | H5: Silicon Valley |
|
| 18.86 miles | ColoXchange Sunnyvale | |
| 18.86 miles | 365 Main (SFR2) Digital Realty |
|
| 18.86 miles | 360 Spear |
360 Spear is a 155,000 square foot data center facility that benefits from being located adjacent to Digital's well-connected 365 Main Street facility.
|
| 18.86 miles | ColoServe San Francisco |
|
| 18.87 miles | Centersquare: Sunnyvale SF03 |
|
| 18.91 miles | CoreSite SV7 | |
| 18.92 miles | CoreSite SV6 | |
| 18.95 miles | CoreSite SV4 | |
| 18.96 miles | CoreSite Santa Clara Campus |
CoreSite's Santa Clara Campus contains 5 datacenter buildings. (SV3, SV4, SV5, SV6, SV7 and SV8)
|
| 18.99 miles | CoreSite SV3 | |
| 19.01 miles | CoreSite SV5 | |
| 19.04 miles | CoreSite SV9 |
CoreSite opened its ninth Santa Clara data center, known as SV9, in 2025.
|
| 19.05 miles | Bowers Data Center |
GI Partners has secured planning permission to demolish an existing office property and develop a new four-story data center in Santa Clara, California.
|
| 19.06 miles | Vantage: CA13 |
CA13 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 19.07 miles | Digital Realty: SJC35 |
Located near Highway 101, 3205 Alfred is a two-story data center. The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.
|
| 19.09 miles | Vantage: CA16 |
CA16 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 19.11 miles | NaviSite Santa Clara |
|
| 19.11 miles | Vantage: CA15 |
CA15 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 19.11 miles | Digital Realty: SJC34 |
This site was acquired through the Telx acquisition and is part of the Vantage Campus in Santa Clara.
|
| 19.11 miles | Vantage: Santa Clara CA1 |
Vantage's CA1 campus consists of six multi-story data centers on 21 acres, offering more than 335,000 square feet of data center space.
|
| 19.12 miles | Digital Realty: SJC30 | |
| 19.13 miles | OpenColo | |
| 19.14 miles | Vantage: CA14 |
CA14 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 19.17 miles | Equinix Santa Clara SV2 | |
| 19.19 miles | Vantage: CA12 |
CA12 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 19.21 miles | Vantage: Santa Clara CA3 |
Vantage Data Centers' third Silicon Valley campus, CA3, is a four-story facility spanning over 486,000 square feet.
|
| 19.23 miles | Astound: Santa Clara | |
| 19.23 miles | Evocative: Santa Clara, SJC3 |
Evocative's Santa Clara Data Center (SJC3), located at 3080 Raymond St, Santa Clara, CA , was constructed in 1980. Spanning an impressive 15000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
| 19.23 miles | StratCap: 3205 Bassett |
StratCap acquired a purpose-built data center in Santa Clara that is 100 percent leased to a ‘top-tier wireless carrier,’ and serves as a network switch facility.
|
| 19.29 miles | Centersquare: Santa Clara SF01 |
|
| 19.29 miles | 2401 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 19.30 miles | Colovore: SJC02 |
Colovore's second high-density, liquid-cooled data center is located immediately adjacent to its first data center in Santa Clara.
|
| 19.32 miles | Digital Realty: SJC29 |
The building, renovated in 2010, houses three 1,125 kW data rooms and is equal to a power density of 160 watts per raised square foot.
|
| 19.32 miles | Csquare: SFO4-B | |
| 19.33 miles | 2403 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 19.33 miles | Centersquare: Santa Clara SF01 DC2 |
|
| 19.34 miles | Csquare: Santa Clara SF04 |
CenterSquare's SFO4 carrier-neutral data center campus is located just minutes from San Jose International Airport.
|
| 19.34 miles | Colovore: Santa Clara SJC01 |
Colovore launched its first single-story, 24,000-square-foot (2,230-square-meter) facility in Santa Clara in 2014, with its most recent expansion announced in February 2022.
|
| 19.34 miles | Lumen Santa Clara |
|
| 19.35 miles | Digital Realty: SJC14 | |
| 19.37 miles | Evocative Santa Clara SJC14 |
|
| 19.38 miles | Digital Realty: SJC16 | |
| 19.39 miles | Tata San Francisco | |
| 19.39 miles | Digital Realty: Silicon Valley SJC10 |
Digital Realty acquired the 3 story facility in 2006. Telx formerly operated the building MMR. Digital Realty acquired Telx in 2015.
|
| 19.40 miles | Prime: 1231 Comstock |
Prime Data Centers is developing a new four-story, 119,000 square-foot data center. Located at 1231 Comstock Street.
|
| 19.42 miles | Digital Realty: SJC15 |
The facility was renovated in 2008 and provides IT services customer with 2,250 kW of critical IT power
|
| 19.44 miles | Prime Santa Clara |
Located in the heart of Silicon Valley, this new Santa Clara data center facility will be delivered as turn-key, or is available as powered shell, with 10 MW of critical power with N+1 configuration and up to 14MW of critical power with N configuration.
|
| 19.47 miles | Digital Realty: SJC11 |
|
| 19.50 miles | Stack: SVY01D |
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
| 19.53 miles | Hyperscale Data Center Request Dataset |
Amazon has acquired a former insulation factory located at 960 Central Expressway just west of San Jose Mineta International Airport in Santa Clara, California.
|
| 19.56 miles | Goodman Innovation Centre San Jose |
Logistics firm Goodman is set to enter the Silicon Valley data center market. The company confirmed the acquisition of a 45.8-acre site in San Jose for $200 million (bought from an affiliate of LBA Realty in October 2025).
|
| 19.56 miles | Connect Data Centers: Santa Clara, CA |
Harrison Street Real Estate Capital LLC and Oppidan Investment Co. have partnered to develop a 200,000-square-foot data center in Santa Clara, near Mineta San Jose International Airport.
|
| 19.57 miles | Goodman Innovation Bldg2 |
|
| 19.59 miles | Stack: SVY01C |
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
| 19.59 miles | STACK Silicon Valley SVY01 |
Phase I supports 9.3 MW of critical power
|
| 19.65 miles | STACK SVY01B |
Stack Infrastructure has launched a 32MW SVY01B facility on its Silicon Valley campus in California
|
| 19.66 miles | Overton Moore Properties: 2334 Lundy Place |
Currently leased to a Triple Net customer, NTT Communications.
|
| 19.66 miles | Equinix San Jose SV13 |
|
| 19.68 miles | NTT Silicon Valley SV1 |
A 160,000 sq. ft., four-story data center built on a 3.3 acre site
|
| 19.69 miles | Prime: 2225 Martin |
Prime Data Centers is planning to build a 207,000 sq ft (19,230 sqm) facility nearby at 2225 Martin Street in Santa Clara, CA.
|
| 19.71 miles | Digital Realty: SJC31 |
|
| 19.73 miles | Prime Santa Clara (Martin) | |
| 19.76 miles | Hyperscale Data Center Request Dataset |
Microsoft plans to build two five-story data centers near the corner of Component Drive and Orchard Parkway in North San Jose. In 2021, LBA sold about 21.3 acres to Microsoft for $78.7 million.
|
| 19.83 miles | Cologix Santa Clara |
In 2021, Data center provider Cologix added its first major presence on the U.S. West Coast, acquiring this data center campus in Santa Clara, Calif. from vXchnge.
|
| 19.85 miles | Digital Realty: SJC37 | |
| 19.97 miles | EdgeConneX Santa Clara |
|
Prime Data Centers develops, acquires, and operates data centers for large enterprises and hyper-scalers. Through our own properties, customer assets (sale-leaseback), or greenfield developments, Prime delivers build-to-suit, powered-shell and turn-key solutions.
April 09, 2026
Prime Data Centers
March 27, 2026
Prime Data Centers
November 14, 2024
Prime Data Centers
May 21, 2024
Prime Data Centers
November 20, 2023
San Francisco Bay Area
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas