OpenAI president Greg Brockman quits as the company fires CEO
November 20, 2023
San Francisco Bay Area
Sierra Morena Tower is a historical AT&T Long Line facility that now operates as a carrier-neutral communication and technology hub. It provides redundant line-of-sight microwave connectivity across the Bay Area, alongside secure tower and rack space.
| Distance | Site | About |
|---|---|---|
| 8.40 miles | Menlo: Bryant Street Landlord | |
| 8.40 miles | Equinix Palo Alto SV8 |
Equinix SV8 is the home of the legendary Palo Alto Internet Exchange.
|
| 8.45 miles | AT&T Palo Alto | |
| 12.36 miles | Astound: Mountain View | |
| 14.32 miles | ECL CSC1 | |
| 15.11 miles | Menlo: MD-SV1 (Sunnyvale) |
Acquired in January 2022, this fully entitled 8.9-acre development site in Sunnyvale, CA features (1) two-story building totaling approximately 244,214 square feet served by an on-site substation.
|
| 16.07 miles | Equinix Sunnyvale SV4 | |
| 16.09 miles | Equinix Sunnyvale SV6 |
|
| 17.65 miles | Equinix Santa Clara SV17 |
|
| 17.66 miles | Equinix Santa Clara SV16 |
|
| 17.66 miles | Equinix Santa Clara SV15 |
|
| 17.67 miles | Centersquare: SF03 DC2 |
|
| 17.67 miles | Equinix Santa Clara SV14 |
|
| 17.72 miles | Lumen Sunnyvale 1 |
|
| 17.73 miles | Element Critical SV1 |
|
| 17.75 miles | ColoXchange Sunnyvale | |
| 17.75 miles | H5: Silicon Valley |
|
| 17.83 miles | Centersquare: Sunnyvale SF03 |
|
| 17.93 miles | 4650 Old Ironsides | |
| 17.93 miles | Centersquare: SF02 DC2 |
|
| 17.93 miles | 4700 Old Ironsides | |
| 17.93 miles | Centersquare: Santa Clara SF02 |
|
| 18.01 miles | T5@Silicon Valley Bldg 2 |
T5 plans to develop an additional three-story 180,000 SF data center building on its Silicon Valley campus.
|
| 18.09 miles | QTS Santa Clara |
QTS's Santa Clara campus has two distinct data center buildings
|
| 18.09 miles | China Telecom Santa Clara | |
| 18.10 miles | Hyperscale Data Center Request Dataset |
While Apple sold the property to T5 Data Centers in October 2020, it continues to operate there as a tenant.
|
| 18.13 miles | T5@Silicon Valley (Newark) |
T5 acquired the facility from Apple in 2020.
|
| 18.29 miles | Prime Hayward |
This 20MW two-story flex building comprising 145,850 square feet on 4 acres is 100% leased by a leading Fortune 50. The property was built in 2015 as a build-to-suit.
|
| 18.34 miles | Bowers Data Center |
GI Partners has secured planning permission to demolish an existing office property and develop a new four-story data center in Santa Clara, California.
|
| 18.38 miles | Terra Ventures: San Jose, CA |
Terra Ventures has revised its plans for a 9.3-acre site in Alviso, North San Jose.
|
| 18.47 miles | Vantage: Santa Clara CA3 |
Vantage Data Centers' third Silicon Valley campus, CA3, is a four-story facility spanning over 486,000 square feet.
|
| 18.49 miles | Vantage: CA14 |
CA14 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 18.50 miles | CoreSite SV7 | |
| 18.50 miles | Vantage: Santa Clara CA1 |
Vantage's CA1 campus consists of six multi-story data centers on 21 acres, offering more than 335,000 square feet of data center space.
|
| 18.51 miles | Lumen Hayward 1 | |
| 18.51 miles | Digital Realty: SJC34 |
This site was acquired through the Telx acquisition and is part of the Vantage Campus in Santa Clara.
|
| 18.51 miles | Vantage: CA13 |
CA13 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 18.55 miles | Vantage: CA15 |
CA15 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 18.56 miles | CoreSite SV8 |
CoreSite completed construction on SV8 phases I and 2 in the second half of 2019
|
| 18.56 miles | CoreSite SV6 | |
| 18.56 miles | Vantage: CA12 |
CA12 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 18.57 miles | CoreSite SV3 | |
| 18.60 miles | Vantage: CA16 |
CA16 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 18.62 miles | CoreSite Santa Clara Campus |
CoreSite's Santa Clara Campus contains 5 datacenter buildings. (SV3, SV4, SV5, SV6, SV7 and SV8)
|
| 18.62 miles | CoreSite SV4 | |
| 18.63 miles | CoreSite SV5 | |
| 18.69 miles | CoreSite SV9 |
CoreSite opened its ninth Santa Clara data center, known as SV9, in 2025.
|
| 18.72 miles | Hyperscale Data Center Request Dataset |
This planned facility will be a part of Amazon's 2305 Mission College Blvd Campus. The data center will span 229,974 sqft (21,365 sq m) of space.
|
| 18.72 miles | DataBank Santa Clara SFO1 |
|
| 18.73 miles | 2403 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 18.73 miles | Centersquare: Santa Clara SF01 DC2 |
|
| 18.73 miles | 2401 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 18.73 miles | Centersquare: Santa Clara SF01 |
|
| 18.78 miles | Hyperscale Data Center Request Dataset |
The project will span two data center buildings, the first spanning 285,768 square feet (26,548 sq m), and the second 229,974 square foot (21,365 sq m).
|
| 18.80 miles | EdgeCore: SV02 |
EdgeCore's Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 18.86 miles | EdgeCore Silicon Valley |
EdgeCore Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 18.92 miles | Intel Santa Clara D2P3 |
The facility uses close-coupled evaporative cooling that relies on recycled water, to help it to reach an annualized PUE of 1.06.
|
| 19.00 miles | Evocative Santa Clara SJC11 |
Formerly known as Internap Santa Clara SJE-011 before being acquired in September 2022 by Evocative
|
| 19.10 miles | Vantage: Nortech Parkway |
In 2023, Vantage outlined plans to build a data center on a 9.8-acre plot in San Jose's Alviso area.
|
| 19.14 miles | Prime: 2225 Martin |
Prime Data Centers is planning to build a 207,000 sq ft (19,230 sqm) facility nearby at 2225 Martin Street in Santa Clara, CA.
|
| 19.15 miles | Prime Santa Clara (Martin) | |
| 19.22 miles | Cologix Santa Clara |
In 2021, Data center provider Cologix added its first major presence on the U.S. West Coast, acquiring this data center campus in Santa Clara, Calif. from vXchnge.
|
| 19.29 miles | Digital Realty: SJC35 |
Located near Highway 101, 3205 Alfred is a two-story data center. The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.
|
| 19.29 miles | Digital Realty: SJC30 | |
| 19.32 miles | Digital Realty: SJC29 |
The building, renovated in 2010, houses three 1,125 kW data rooms and is equal to a power density of 160 watts per raised square foot.
|
| 19.40 miles | OpenColo | |
| 19.40 miles | EdgeConneX Santa Clara |
|
| 19.42 miles | Csquare: SFO4-B | |
| 19.44 miles | Digital Realty: SJC16 | |
| 19.44 miles | Evocative Santa Clara SJC14 |
|
| 19.44 miles | NTT Silicon Valley SV1 |
A 160,000 sq. ft., four-story data center built on a 3.3 acre site
|
| 19.46 miles | Csquare: Santa Clara SF04 |
CenterSquare's SFO4 carrier-neutral data center campus is located just minutes from San Jose International Airport.
|
| 19.46 miles | Equinix Santa Clara SV2 | |
| 19.47 miles | EdgeConneX: 1600 Memorex |
Expansion site
|
| 19.47 miles | Digital Realty: SJC14 | |
| 19.50 miles | Prime: 1231 Comstock |
Prime Data Centers is developing a new four-story, 119,000 square-foot data center. Located at 1231 Comstock Street.
|
| 19.51 miles | Evocative: Santa Clara, SJC3 |
Evocative's Santa Clara Data Center (SJC3), located at 3080 Raymond St, Santa Clara, CA , was constructed in 1980. Spanning an impressive 15000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
| 19.52 miles | Astound: Santa Clara | |
| 19.54 miles | Digital Realty: SJC15 |
The facility was renovated in 2008 and provides IT services customer with 2,250 kW of critical IT power
|
| 19.56 miles | Hyperscale Data Center Request Dataset |
Amazon has acquired a former insulation factory located at 960 Central Expressway just west of San Jose Mineta International Airport in Santa Clara, California.
|
| 19.58 miles | Colovore: SJC02 |
Colovore's second high-density, liquid-cooled data center is located immediately adjacent to its first data center in Santa Clara.
|
| 19.58 miles | Colovore: Santa Clara SJC01 |
Colovore launched its first single-story, 24,000-square-foot (2,230-square-meter) facility in Santa Clara in 2014, with its most recent expansion announced in February 2022.
|
| 19.58 miles | Digital Realty: Silicon Valley SJC10 |
Digital Realty acquired the 3 story facility in 2006. Telx formerly operated the building MMR. Digital Realty acquired Telx in 2015.
|
| 19.58 miles | Tata San Francisco | |
| 19.59 miles | Prime Santa Clara |
Located in the heart of Silicon Valley, this new Santa Clara data center facility will be delivered as turn-key, or is available as powered shell, with 10 MW of critical power with N+1 configuration and up to 14MW of critical power with N configuration.
|
| 19.64 miles | Lumen Santa Clara |
|
| 19.68 miles | Prologis: San Jose 4 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 19.68 miles | STACK SVY02A |
STACK Infrastructure is constructing a new data center facility at 1200 Memorex Drive, located in an industrial corner of Santa Clara. The four-story data center will contain 472,920 square feet.
|
| 19.74 miles | StratCap: 3205 Bassett |
StratCap acquired a purpose-built data center in Santa Clara that is 100 percent leased to a ‘top-tier wireless carrier,’ and serves as a network switch facility.
|
| 19.78 miles | Skybox Santa Clara |
|
| 19.81 miles | Prologis: San Jose 3 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 19.82 miles | Digital Realty: SJC11 |
|
| 19.84 miles | Digital Realty: SJC31 |
|
| 19.92 miles | Connect Data Centers: Santa Clara, CA |
Harrison Street Real Estate Capital LLC and Oppidan Investment Co. have partnered to develop a 200,000-square-foot data center in Santa Clara, near Mineta San Jose International Airport.
|
| 19.95 miles | Prologis: San Jose 2 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 19.97 miles | Digital Realty: SJC37 | |
| 20.00 miles | 400 Holger Way, San Jose |
Sierra Morena Tower, LLC operates a communication and technology infrastructure hub situated at the highest point in the Bay Area. Originally part of the Pacific Telephone and Telegraph Company's AT&T Long-Line network, established in the 1960s, the facility has a history of supporting national telecommunications.
November 20, 2023
San Francisco Bay Area
November 19, 2023
San Francisco Bay Area
August 08, 2023
San Francisco Bay Area
May 12, 2023
San Francisco Bay Area
April 18, 2023
San Francisco Bay Area
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas