CoreSite Tops Out Denver data center
October 09, 2025
CoreSite
| Distance | Site | About |
|---|---|---|
| 0.02 miles | CoreSite Santa Clara Campus |
CoreSite's Santa Clara Campus contains 5 datacenter buildings. (SV3, SV4, SV5, SV6, SV7 and SV8)
|
| 0.07 miles | CoreSite SV6 | |
| 0.07 miles | CoreSite SV5 | |
| 0.09 miles | CoreSite SV9 |
CoreSite opened its ninth Santa Clara data center, known as SV9, in 2025.
|
| 0.09 miles | CoreSite SV3 | |
| 0.10 miles | CoreSite SV8 |
CoreSite completed construction on SV8 phases I and 2 in the second half of 2019
|
| 0.13 miles | CoreSite SV7 | |
| 0.18 miles | Vantage: CA16 |
CA16 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 0.23 miles | Vantage: CA13 |
CA13 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 0.24 miles | Vantage: CA15 |
CA15 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 0.28 miles | Digital Realty: SJC34 |
This site was acquired through the Telx acquisition and is part of the Vantage Campus in Santa Clara.
|
| 0.30 miles | Vantage: Santa Clara CA1 |
Vantage's CA1 campus consists of six multi-story data centers on 21 acres, offering more than 335,000 square feet of data center space.
|
| 0.32 miles | Vantage: CA12 |
CA12 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 0.34 miles | Vantage: CA14 |
CA14 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 0.35 miles | 2401 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 0.35 miles | Centersquare: Santa Clara SF01 |
|
| 0.40 miles | Centersquare: Santa Clara SF01 DC2 |
|
| 0.40 miles | 2403 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 0.41 miles | Bowers Data Center |
GI Partners has secured planning permission to demolish an existing office property and develop a new four-story data center in Santa Clara, California.
|
| 0.43 miles | Vantage: Santa Clara CA3 |
Vantage Data Centers' third Silicon Valley campus, CA3, is a four-story facility spanning over 486,000 square feet.
|
| 0.60 miles | EdgeCore Silicon Valley |
EdgeCore Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 0.63 miles | EdgeCore: SV02 |
EdgeCore's Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 0.70 miles | Digital Realty: SJC29 |
The building, renovated in 2010, houses three 1,125 kW data rooms and is equal to a power density of 160 watts per raised square foot.
|
| 0.70 miles | Digital Realty: SJC30 | |
| 0.72 miles | Digital Realty: SJC35 |
Located near Highway 101, 3205 Alfred is a two-story data center. The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.
|
| 0.75 miles | Prime: 2225 Martin |
Prime Data Centers is planning to build a 207,000 sq ft (19,230 sqm) facility nearby at 2225 Martin Street in Santa Clara, CA.
|
| 0.79 miles | Prime Santa Clara (Martin) | |
| 0.80 miles | Csquare: SFO4-B | |
| 0.81 miles | Digital Realty: SJC16 | |
| 0.81 miles | Evocative Santa Clara SJC14 |
|
| 0.83 miles | OpenColo | |
| 0.84 miles | Csquare: Santa Clara SF04 |
CenterSquare's SFO4 carrier-neutral data center campus is located just minutes from San Jose International Airport.
|
| 0.85 miles | Digital Realty: SJC14 | |
| 0.87 miles | Prime: 1231 Comstock |
Prime Data Centers is developing a new four-story, 119,000 square-foot data center. Located at 1231 Comstock Street.
|
| 0.87 miles | Intel Santa Clara D2P3 |
The facility uses close-coupled evaporative cooling that relies on recycled water, to help it to reach an annualized PUE of 1.06.
|
| 0.88 miles | Centersquare: Sunnyvale SF03 |
|
| 0.88 miles | Equinix Santa Clara SV2 | |
| 0.88 miles | NTT Silicon Valley SV1 |
A 160,000 sq. ft., four-story data center built on a 3.3 acre site
|
| 0.89 miles | Cologix Santa Clara |
In 2021, Data center provider Cologix added its first major presence on the U.S. West Coast, acquiring this data center campus in Santa Clara, Calif. from vXchnge.
|
| 0.92 miles | Evocative: Santa Clara, SJC3 |
Evocative's Santa Clara Data Center (SJC3), located at 3080 Raymond St, Santa Clara, CA , was constructed in 1980. Spanning an impressive 15000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
| 0.92 miles | Digital Realty: SJC15 |
The facility was renovated in 2008 and provides IT services customer with 2,250 kW of critical IT power
|
| 0.92 miles | Astound: Santa Clara | |
| 0.94 miles | Hyperscale Data Center Request Dataset |
Amazon has acquired a former insulation factory located at 960 Central Expressway just west of San Jose Mineta International Airport in Santa Clara, California.
|
| 0.96 miles | Digital Realty: Silicon Valley SJC10 |
Digital Realty acquired the 3 story facility in 2006. Telx formerly operated the building MMR. Digital Realty acquired Telx in 2015.
|
| 0.96 miles | Tata San Francisco | |
| 0.97 miles | H5: Silicon Valley |
|
| 0.97 miles | Colovore: Santa Clara SJC01 |
Colovore launched its first single-story, 24,000-square-foot (2,230-square-meter) facility in Santa Clara in 2014, with its most recent expansion announced in February 2022.
|
| 0.97 miles | Element Critical SV1 |
|
| 0.97 miles | Prime Santa Clara |
Located in the heart of Silicon Valley, this new Santa Clara data center facility will be delivered as turn-key, or is available as powered shell, with 10 MW of critical power with N+1 configuration and up to 14MW of critical power with N configuration.
|
| 0.97 miles | ColoXchange Sunnyvale | |
| 0.97 miles | Colovore: SJC02 |
Colovore's second high-density, liquid-cooled data center is located immediately adjacent to its first data center in Santa Clara.
|
| 0.97 miles | Hyperscale Data Center Request Dataset |
This planned facility will be a part of Amazon's 2305 Mission College Blvd Campus. The data center will span 229,974 sqft (21,365 sq m) of space.
|
| 0.98 miles | Lumen Sunnyvale 1 |
|
| 0.98 miles | Equinix Santa Clara SV17 |
|
| 0.98 miles | Equinix Santa Clara SV16 |
|
| 0.98 miles | Equinix Santa Clara SV15 |
|
| 0.98 miles | Equinix Santa Clara SV14 |
|
| 1.00 miles | Hyperscale Data Center Request Dataset |
The project will span two data center buildings, the first spanning 285,768 square feet (26,548 sq m), and the second 229,974 square foot (21,365 sq m).
|
| 1.03 miles | Centersquare: SF03 DC2 |
|
| 1.03 miles | Evocative Santa Clara SJC11 |
Formerly known as Internap Santa Clara SJE-011 before being acquired in September 2022 by Evocative
|
| 1.03 miles | Lumen Santa Clara |
|
| 1.05 miles | EdgeConneX Santa Clara |
|
| 1.14 miles | EdgeConneX: 1600 Memorex |
Expansion site
|
| 1.17 miles | StratCap: 3205 Bassett |
StratCap acquired a purpose-built data center in Santa Clara that is 100 percent leased to a ‘top-tier wireless carrier,’ and serves as a network switch facility.
|
| 1.21 miles | Digital Realty: SJC11 |
|
| 1.22 miles | Digital Realty: SJC31 |
|
| 1.22 miles | China Telecom Santa Clara | |
| 1.30 miles | Connect Data Centers: Santa Clara, CA |
Harrison Street Real Estate Capital LLC and Oppidan Investment Co. have partnered to develop a 200,000-square-foot data center in Santa Clara, near Mineta San Jose International Airport.
|
| 1.30 miles | QTS Santa Clara |
QTS's Santa Clara campus has two distinct data center buildings
|
| 1.35 miles | STACK SVY02A |
STACK Infrastructure is constructing a new data center facility at 1200 Memorex Drive, located in an industrial corner of Santa Clara. The four-story data center will contain 472,920 square feet.
|
| 1.35 miles | Digital Realty: SJC37 | |
| 1.40 miles | Skybox Santa Clara |
|
| 1.52 miles | Vantage: Santa Clara CA2 |
The Vantage's long-term plan calls for four data center buildings totaling 560,000 square feet and 55 megawatts of critical load.
|
| 1.55 miles | Vantage: CA23 |
Vantage CA23 data center building is a part of Vantage's second Santa Clara Campus. The building spans 200,000 sq ft (18,500 sq m) of data center space and came online in 2021.
|
| 1.58 miles | Centersquare: SF02 DC2 |
|
| 1.58 miles | 4650 Old Ironsides | |
| 1.59 miles | Vantage: CA22 |
Vantage CA22 data center building is a part of Vantage's second Santa Clara Campus.
|
| 1.62 miles | 2045 & 2055 Lafayette - Digital Realty |
Digital Realty acquired the facility in 2004 and fully leased it to Savvis. In 2007, Microsoft acquired that lease and is now the sole tenant of the facility.
|
| 1.65 miles | 4700 Old Ironsides | |
| 1.65 miles | Centersquare: Santa Clara SF02 |
|
| 1.65 miles | Cyrusone Santa Clara |
|
| 1.78 miles | Santa Clara (SC1) Digital Realty |
|
| 1.95 miles | CloudHQ: Santa Clara SJC1 |
CloudHQ's SJC1 data center will be a multi-story facility designed to accommodate various deployment types.
|
| 1.99 miles | Goodman Innovation Centre San Jose |
Logistics firm Goodman is set to enter the Silicon Valley data center market. The company confirmed the acquisition of a 45.8-acre site in San Jose for $200 million (bought from an affiliate of LBA Realty in October 2025).
|
| 2.07 miles | Goodman Innovation Bldg2 |
|
| 2.08 miles | Hyperscale Data Center Request Dataset |
Microsoft plans to build two five-story data centers near the corner of Component Drive and Orchard Parkway in North San Jose. In 2021, LBA sold about 21.3 acres to Microsoft for $78.7 million.
|
| 2.16 miles | DataBank Santa Clara SFO1 |
|
| 2.66 miles | 2950 Zanker |
The building is 100% leased on a long-term basis to a major telecommunications company.
|
| 2.67 miles | NaviSite Santa Clara |
|
| 2.90 miles | Equinix Sunnyvale SV6 |
|
| 3.29 miles | 400 Holger Way, San Jose | |
| 3.36 miles | Terra Ventures: San Jose, CA |
Terra Ventures has revised its plans for a 9.3-acre site in Alviso, North San Jose.
|
| 3.46 miles | Vantage: Nortech Parkway |
In 2023, Vantage outlined plans to build a data center on a 9.8-acre plot in San Jose's Alviso area.
|
| 3.50 miles | Prologis: San Jose 4 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 3.55 miles | Prologis: San Jose 3 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 3.57 miles | Equinix Sunnyvale SV4 | |
| 3.61 miles | Prologis: San Jose 2 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 3.61 miles | CoreSite Milpitas SV2 | |
| 3.65 miles | Prologis: San Jose, California |
Prologis’ Sustainable Technology, Engineering and Manufacturing (STEM) Park is a landmark 159-acre development in North San Jose designed to anchor the region’s growing AI and semiconductor sectors.
|
| 3.79 miles | Menlo: MD-SV1 (Sunnyvale) |
Acquired in January 2022, this fully entitled 8.9-acre development site in Sunnyvale, CA features (1) two-story building totaling approximately 244,214 square feet served by an on-site substation.
|
| 4.07 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Microsoft's Alviso Way Campus in San Jose, California.
|
| 4.22 miles | 365 San Jose | |
| 4.23 miles | Evocative: SJC7 |
|
| 4.24 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing a new data center campus on a 64.59-acre site in the Alviso neighborhood of Northern San Jose.
|
| 4.40 miles | ECL CSC1 | |
| 4.46 miles | Equinix San Jose SV13 |
|
| 4.50 miles | Stack: SVY01C |
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
| 4.54 miles | Stack: SVY01D |
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
| 4.59 miles | Equinix San Jose SV3 | |
| 4.61 miles | STACK Silicon Valley SVY01 |
Phase I supports 9.3 MW of critical power
|
| 4.66 miles | STACK SVY01B |
Stack Infrastructure has launched a 32MW SVY01B facility on its Silicon Valley campus in California
|
| 4.66 miles | Cerulean San Jose |
|
| 4.67 miles | Fibernet San Jose |
|
| 4.72 miles | Arena Investors: Bassett AI R&D |
Spanning 281,800 sq ft, the development will feature lab and office spaces, three floors of data halls, IT white space, an on-site substation, generators, and a rooftop cooling plant.
|
| 4.87 miles | Overton Moore Properties: 2334 Lundy Place |
Currently leased to a Triple Net customer, NTT Communications.
|
| 5.23 miles | CoreSite SV1 55 S Market |
55 S Market is a legacy Carrier Hotel in San Jose
|
| 5.23 miles | HostPapa SJ1 |
SJ1 is located within CoreSite's 55 S Market building which is a legacy telecom and Internet hub.
|
| 5.23 miles | Hurricane San Jose |
Multiple racks in cages in the same building as CoreSite Any2 San Jose
20+ Carriers with Diverse Fiber In Building
|
| 5.38 miles | 150 S 1st |
|
| 5.45 miles | Rackspace San Jose SJC2 |
Colocated within the Digital Reality's building
|
| 6.70 miles | Astound: Mountain View | |
| 7.16 miles | Hurricane Electric Fremont 2 |
3 Internet Exchange Points (SFMIX, AMS-IX Bay, and FCIX)
70 Internet Networks
7 Carriers with Diverse Fiber
|
| 7.35 miles | Verizon: Fremont |
The site is a previous XO Communications facility
|
| 8.16 miles | Hurricane Electric Fremont 1 |
2 Internet Exchange Points (SFMIX and AMS-IX Bay)
20 Internet Networks
6 Carriers with Diverse Fiber
|
| 9.39 miles | Hyperscale Data Center Request Dataset |
While Apple sold the property to T5 Data Centers in October 2020, it continues to operate there as a tenant.
|
| 9.40 miles | T5@Silicon Valley (Newark) |
T5 acquired the facility from Apple in 2020.
|
| 9.47 miles | T5@Silicon Valley Bldg 2 |
T5 plans to develop an additional three-story 180,000 SF data center building on its Silicon Valley campus.
|
| 11.43 miles | AT&T Palo Alto | |
| 11.49 miles | Equinix Palo Alto SV8 |
Equinix SV8 is the home of the legendary Palo Alto Internet Exchange.
|
| 11.49 miles | Menlo: Bryant Street Landlord | |
| 13.78 miles | Equinix SV11 | |
| 13.83 miles | Equinix SV10 | |
| 13.85 miles | Lightedge: San Jose, CA |
LightEdge acts as a colocation and hybrid cloud provider operating within Equinix’s Silicon Valley campus.
|
| 13.88 miles | Equinix San Jose Campus |
The four building Equinix campus in Silicon Valley lies to the far south in San Jose, yet it is one of the best-connected data centers in the Bay Area.
|
| 13.93 miles | Equinix SV5 | |
| 14.15 miles | SC Zeus: San Jose |
The site can support 5KW to 10KW per Rack. If support for Liquid Cooled Server is required, additional work needs to be completed, which will take around 4 months.
|
| 14.16 miles | Equinix: SV12x | |
| 14.18 miles | China Mobile San Jose |
In 2023, after many delays, the building was commissioned
|
| 14.19 miles | Prime: San Jose |
|
| 14.20 miles | Equinix: SV19 | |
| 14.21 miles | RICloud: 6580 Via del Oro |
In 2017, RiCloud Corp acquired from Briggs Development and spent about $100 million renovating the property.
|
| 14.38 miles | Equinix: SV18 |
|
| 18.62 miles | Sierra Morena Tower |
Sierra Morena Tower is a historical AT&T Long Line facility that now operates as a carrier-neutral communication and technology hub.
|
| 18.95 miles | Prime Hayward |
This 20MW two-story flex building comprising 145,850 square feet on 4 acres is 100% leased by a leading Fortune 50. The property was built in 2015 as a build-to-suit.
|
CoreSite Realty is a data center REIT with a focus on network dense buildings. The company operates the Any2 Peering Exchange, which is the largest Internet Exchange in the Western US.
CoreSite Realty Corporation was founded in 2001 as CRG West, a portfolio company of The Carlyle Group. CRG West initially started with two data center buildings; One Wilshire in Los Angeles and 55 South Market in San Jose. The buildings were popular network interconnection and peering points. Although 55 S Market has declined as an interconnection point, One Wilshire continues to be a popular building for network interconnection.
In August, the company sold the One Wilshire Building to Hines REIT for $287 million. The large transaction gave CRG West additional capital to fund the company's growth into new markets.
In May, CRG West acquires buildings in Chicago (for $34 million) and Sommerville just outside of Boston. The Chicago building at 427 S LaSalle was originally designed and built by Western Union. Western Union buildings have traditionally been converted into Carrier Hotels because the telegraph infrastructure with their risers of conduits works well for the telecom industry. The facility is situated across from One Financial Plaza and adjacent to the Chicago Board of Trade.
CoreSite Boston at 70 Innerbelt Road, Somerville, MA is located less than two miles from downtown Boston and Cambridge. The large building has SunGard and Internap as significant tenants also offering colocation
CRG West acquired their Reston facility at 12100 Sunrise Valley.
CRG West rebranded as CoreSite.
In September, CoreSite became publicly traded on the New York Stock Exchange (NYSE: COR). The Carlyle Group still owned ~50% of the newly public company at the time of the IPO. The Carlyle Group has since reduced their ownership to less than 30%.
In April, CoreSite acquired Comfluent and their two Denver data centers. The data centers were small, but pivotal to the Denver Interconnection and Peering Market. DE1 is located in 910 15th Street, Denver's Telecom Hotel, the Denver Gas & Electric Building (DGEB.) Comfluent was the defacto meet me room for the building. DE2 was 639 E 18th Ave, which was adjacent to Level 3's Denver Gateway site.
CoreSite was headquarted in Denver, but until 2012 did not have any data centers in Colorado.
SV5 was built and leased to a single tenant
Tom Ray, CoreSite's CEO since inception retired. Paul Szurek became CoreSites new CEO.
In August, Sunrise Technology Park (STP) was acquired for $60 million with a plan to significantly expand the campus.
12100 Sunrise Valley was first acquired in 2008 and CoreSite has since turned the Reston site into a campus. The company constructed a building (VA2) in the parking lot. In 2018, Coresite acquired a 22-acre lot a few blocks away at 12379 Sunrise Valley Drive. The lot will serve to virtually expand the Reston Campus.
The development has four phases and involves building new 3-story data centers and demolishing the old buildings. CoreSite has begun work on VA3 on the new lot.
October 09, 2025
CoreSite
September 27, 2025
CoreSite
December 15, 2023
CoreSite
November 20, 2023
San Francisco Bay Area
November 19, 2023
San Francisco Bay Area
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas