Site: Hurricane Electric Fremont 2
Company: Hurricane Electric
Metro: San Francisco Bay Area
State: California
Country: United States
Region: North America
Region: Americas
Short Code: Fremont 2
Address: Gross SqFt: 208,000
Total Power: 15.0 Megawatts
- 3000 Cabinets
- 3 Internet Exchange Points (SFMIX, AMS-IX Bay, and FCIX)
- 70 Internet Networks
- 7 Carriers with Diverse Fiber
- 200,000 square feet
- 24 x 7 x 365 Onsite Staff
- 24 x 7 x 365 Remote Hands
- 24 x 7 x 365 Access
- Diverse A & B Power Available (fully separate PDUs, Panels, Transformers, Generators)
- UPS and Generator back-up power
- Individually locked cabinets
- Custom designed video surveillance of every cabinet
- Card keyed doors and other onsite security measures
Building History
The site was developed in 1971 and was previously a manufacturing facility for Apple Computer. After Apple vacated the site the building was used by various tenants as a warehouse and distribution center and manufacturing plant. In 2006 Hurricane Electric converted the building to a data center.