|
0.00 miles
|
Tata San Francisco
|
|
|
0.05 miles
|
Prime Santa Clara
|
Located in the heart of Silicon Valley, this new Santa Clara data center facility will be delivered as turn-key, or is available as powered shell, with 10 MW of critical power with N+1 configuration and up to 14MW of critical power with N configuration.
|
|
0.06 miles
|
Colovore: Santa Clara SJC01
|
Colovore launched its first single-story, 24,000-square-foot (2,230-square-meter) facility in Santa Clara in 2014, with its most recent expansion announced in February 2022.
|
|
0.07 miles
|
Digital Realty: SJC15
|
The facility was renovated in 2008 and provides IT services customer with 2,250 kW of critical IT power
|
|
0.11 miles
|
Colovore: SJC02
|
Colovore's second high-density, liquid-cooled data center is located immediately adjacent to its first data center in Santa Clara.
|
|
0.11 miles
|
Prime: 1231 Comstock
|
Prime Data Centers is developing a new four-story, 119,000 square-foot data center. Located at 1231 Comstock Street.
|
|
0.11 miles
|
Digital Realty: SJC14
|
|
|
0.12 miles
|
Lumen Santa Clara
|
|
|
0.12 miles
|
Csquare: Santa Clara SF04
|
CenterSquare's SFO4 carrier-neutral data center campus is located just minutes from San Jose International Airport.
|
|
0.16 miles
|
Csquare: SFO4-B
|
|
|
0.16 miles
|
Evocative Santa Clara SJC14
|
|
|
0.16 miles
|
Evocative: Santa Clara, SJC3
|
Evocative's Santa Clara Data Center (SJC3), located at 3080 Raymond St, Santa Clara, CA , was constructed in 1980. Spanning an impressive 15000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
|
0.17 miles
|
Digital Realty: SJC16
|
|
|
0.17 miles
|
Astound: Santa Clara
|
|
|
0.18 miles
|
Hyperscale Data Center
Request Dataset
|
Amazon has acquired a former insulation factory located at 960 Central Expressway just west of San Jose Mineta International Airport in Santa Clara, California.
|
|
0.22 miles
|
Equinix Santa Clara SV2
|
|
|
0.25 miles
|
Digital Realty: SJC11
|
|
|
0.26 miles
|
OpenColo
|
|
|
0.27 miles
|
Digital Realty: SJC29
|
The building, renovated in 2010, houses three 1,125 kW data rooms and is equal to a power density of 160 watts per raised square foot.
|
|
0.32 miles
|
Digital Realty: SJC30
|
|
|
0.33 miles
|
StratCap: 3205 Bassett
|
StratCap acquired a purpose-built data center in Santa Clara that is 100 percent leased to a ‘top-tier wireless carrier,’ and serves as a network switch facility.
|
|
0.33 miles
|
Digital Realty: SJC31
|
|
|
0.34 miles
|
Connect Data Centers: Santa Clara, CA
|
Harrison Street Real Estate Capital LLC and Oppidan Investment Co. have partnered to develop a 200,000-square-foot data center in Santa Clara, near Mineta San Jose International Airport.
|
|
0.35 miles
|
Digital Realty: SJC35
|
Located near Highway 101, 3205 Alfred is a two-story data center. The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.
|
|
0.46 miles
|
NTT Silicon Valley SV1
|
A 160,000 sq. ft., four-story data center built on a 3.3 acre site
|
|
0.48 miles
|
Digital Realty: SJC37
|
|
|
0.79 miles
|
Prime: 2225 Martin
|
Prime Data Centers is planning to build a 207,000 sq ft (19,230 sqm) facility nearby at 2225 Martin Street in Santa Clara, CA.
|
|
0.79 miles
|
Cyrusone Santa Clara
|
|
|
0.83 miles
|
Prime Santa Clara (Martin)
|
|
|
0.84 miles
|
EdgeConneX Santa Clara
|
|
|
0.86 miles
|
Cologix Santa Clara
|
In 2021, Data center provider Cologix added its first major presence on the U.S. West Coast, acquiring this data center campus in Santa Clara, Calif. from vXchnge.
|
|
0.86 miles
|
EdgeCore Silicon Valley
|
EdgeCore Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
|
0.87 miles
|
Vantage: Santa Clara CA2
|
The Vantage's long-term plan calls for four data center buildings totaling 560,000 square feet and 55 megawatts of critical load.
|
|
0.88 miles
|
EdgeConneX: 1600 Memorex
|
Expansion site
|
|
0.88 miles
|
Vantage: CA23
|
Vantage CA23 data center building is a part of Vantage's second Santa Clara Campus. The building spans 200,000 sq ft (18,500 sq m) of data center space and came online in 2021.
|
|
0.90 miles
|
CoreSite SV9
|
CoreSite opened its ninth Santa Clara data center, known as SV9, in 2025.
|
|
0.91 miles
|
Vantage: CA22
|
Vantage CA22 data center building is a part of Vantage's second Santa Clara Campus.
|
|
0.92 miles
|
Skybox Santa Clara
|
|
|
0.94 miles
|
EdgeCore: SV02
|
EdgeCore's Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
|
0.95 miles
|
2401 Walsh - Digital Realty
|
Currently leased to a Triple Net customer.
|
|
0.95 miles
|
Centersquare: Santa Clara SF01
|
|
|
0.95 miles
|
STACK SVY02A
|
STACK Infrastructure is constructing a new data center facility at 1200 Memorex Drive, located in an industrial corner of Santa Clara. The four-story data center will contain 472,920 square feet.
|
|
0.96 miles
|
CoreSite SV4
|
|
|
0.96 miles
|
CoreSite Santa Clara Campus
|
CoreSite's Santa Clara Campus contains 5 datacenter buildings. (SV3, SV4, SV5, SV6, SV7 and SV8)
|
|
0.97 miles
|
CoreSite SV5
|
|
|
0.99 miles
|
Centersquare: Santa Clara SF01 DC2
|
|
|
0.99 miles
|
2403 Walsh - Digital Realty
|
Currently leased to a Triple Net customer.
|
|
1.00 miles
|
Intel Santa Clara D2P3
|
The facility uses close-coupled evaporative cooling that relies on recycled water, to help it to reach an annualized PUE of 1.06.
|
|
1.02 miles
|
Vantage: CA16
|
CA16 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
|
1.02 miles
|
CoreSite SV3
|
|
|
1.02 miles
|
CoreSite SV8
|
CoreSite completed construction on SV8 phases I and 2 in the second half of 2019
|
|
1.03 miles
|
CoreSite SV6
|
|
|
1.06 miles
|
2045 & 2055 Lafayette - Digital Realty
|
Digital Realty acquired the facility in 2004 and fully leased it to Savvis. In 2007, Microsoft acquired that lease and is now the sole tenant of the facility.
|
|
1.06 miles
|
Evocative Santa Clara SJC11
|
Formerly known as Internap Santa Clara SJE-011 before being acquired in September 2022 by Evocative
|
|
1.06 miles
|
Goodman Innovation Centre San Jose
|
Logistics firm Goodman is set to enter the Silicon Valley data center market. The company confirmed the acquisition of a 45.8-acre site in San Jose for $200 million (bought from an affiliate of LBA Realty in October 2025).
|
|
1.08 miles
|
Vantage: CA15
|
CA15 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
|
1.09 miles
|
CoreSite SV7
|
|
|
1.10 miles
|
Vantage: CA12
|
CA12 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
|
1.10 miles
|
Santa Clara (SC1) Digital Realty
|
|
|
1.11 miles
|
Vantage: CA13
|
CA13 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
|
1.13 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft plans to build two five-story data centers near the corner of Component Drive and Orchard Parkway in North San Jose. In 2021, LBA sold about 21.3 acres to Microsoft for $78.7 million.
|
|
1.13 miles
|
Digital Realty: SJC34
|
This site was acquired through the Telx acquisition and is part of the Vantage Campus in Santa Clara.
|
|
1.14 miles
|
Vantage: Santa Clara CA1
|
Vantage's CA1 campus consists of six multi-story data centers on 21 acres, offering more than 335,000 square feet of data center space.
|
|
1.14 miles
|
Goodman Innovation Bldg2
|
|
|
1.16 miles
|
Vantage: CA14
|
CA14 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
|
1.22 miles
|
Hyperscale Data Center
Request Dataset
|
The project will span two data center buildings, the first spanning 285,768 square feet (26,548 sq m), and the second 229,974 square foot (21,365 sq m).
|
|
1.22 miles
|
Vantage: Santa Clara CA3
|
Vantage Data Centers' third Silicon Valley campus, CA3, is a four-story facility spanning over 486,000 square feet.
|
|
1.24 miles
|
Hyperscale Data Center
Request Dataset
|
This planned facility will be a part of Amazon's 2305 Mission College Blvd Campus. The data center will span 229,974 sqft (21,365 sq m) of space.
|
|
1.28 miles
|
CloudHQ: Santa Clara SJC1
|
CloudHQ's SJC1 data center will be a multi-story facility designed to accommodate various deployment types.
|
|
1.31 miles
|
Bowers Data Center
|
GI Partners has secured planning permission to demolish an existing office property and develop a new four-story data center in Santa Clara, California.
|
|
1.81 miles
|
China Telecom Santa Clara
|
|
|
1.82 miles
|
Centersquare: Sunnyvale SF03
|
|
|
1.86 miles
|
NaviSite Santa Clara
|
|
|
1.87 miles
|
QTS Santa Clara
|
QTS's Santa Clara campus has two distinct data center buildings
|
|
1.90 miles
|
H5: Silicon Valley
|
|
|
1.90 miles
|
ColoXchange Sunnyvale
|
|
|
1.91 miles
|
Element Critical SV1
|
|
|
1.92 miles
|
Lumen Sunnyvale 1
|
|
|
1.94 miles
|
Equinix Santa Clara SV15
|
|
|
1.94 miles
|
Equinix Santa Clara SV16
|
|
|
1.94 miles
|
Equinix Santa Clara SV17
|
|
|
1.94 miles
|
Equinix Santa Clara SV14
|
|
|
1.94 miles
|
2950 Zanker
|
The building is 100% leased on a long-term basis to a major telecommunications company.
|
|
1.97 miles
|
Centersquare: SF03 DC2
|
|
|
2.14 miles
|
Centersquare: SF02 DC2
|
|
|
2.14 miles
|
4650 Old Ironsides
|
|
|
2.19 miles
|
4700 Old Ironsides
|
|
|
2.19 miles
|
Centersquare: Santa Clara SF02
|
|
|
2.29 miles
|
DataBank Santa Clara SFO1
|
|
|
2.89 miles
|
CoreSite Milpitas SV2
|
|
|
3.00 miles
|
400 Holger Way, San Jose
|
|
|
3.32 miles
|
Prologis: San Jose 4
|
This facility is part of Prologis' data center campus in San Jose, California.
|
|
3.34 miles
|
Prologis: San Jose 3
|
This facility is part of Prologis' data center campus in San Jose, California.
|
|
3.37 miles
|
Prologis: San Jose 2
|
This facility is part of Prologis' data center campus in San Jose, California.
|
|
3.39 miles
|
Prologis: San Jose, California
|
Prologis’ Sustainable Technology, Engineering and Manufacturing (STEM) Park is a landmark 159-acre development in North San Jose designed to anchor the region’s growing AI and semiconductor sectors.
|
|
3.45 miles
|
Vantage: Nortech Parkway
|
In 2023, Vantage outlined plans to build a data center on a 9.8-acre plot in San Jose's Alviso area.
|
|
3.50 miles
|
365 San Jose
|
|
|
3.50 miles
|
Evocative: SJC7
|
|
|
3.55 miles
|
Terra Ventures: San Jose, CA
|
Terra Ventures has revised its plans for a 9.3-acre site in Alviso, North San Jose.
|
|
3.59 miles
|
Equinix San Jose SV13
|
|
|
3.65 miles
|
Stack: SVY01C
|
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
|
3.65 miles
|
Hyperscale Data Center
Request Dataset
|
This facility will be part of Microsoft's Alviso Way Campus in San Jose, California.
|
|
3.65 miles
|
Equinix San Jose SV3
|
|
|
3.70 miles
|
Stack: SVY01D
|
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
|
3.74 miles
|
Equinix Sunnyvale SV6
|
|
|
3.76 miles
|
STACK Silicon Valley SVY01
|
Phase I supports 9.3 MW of critical power
|
|
3.80 miles
|
STACK SVY01B
|
Stack Infrastructure has launched a 32MW SVY01B facility on its Silicon Valley campus in California
|
|
3.86 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft is developing a new data center campus on a 64.59-acre site in the Alviso neighborhood of Northern San Jose.
|
|
3.91 miles
|
Arena Investors: Bassett AI R&D
|
Spanning 281,800 sq ft, the development will feature lab and office spaces, three floors of data halls, IT white space, an on-site substation, generators, and a rooftop cooling plant.
|
|
3.94 miles
|
Cerulean San Jose
|
|
|
3.95 miles
|
Fibernet San Jose
|
|
|
4.02 miles
|
Overton Moore Properties: 2334 Lundy Place
|
Currently leased to a Triple Net customer, NTT Communications.
|
|
4.24 miles
|
Carrier-Neutral Data Center
Request Dataset
|
MicroLink is planning to build a data center in San Jose, California.
|
|
4.29 miles
|
Equinix Sunnyvale SV4
|
|
|
4.45 miles
|
CoreSite SV1 55 S Market
|
55 S Market is a legacy Carrier Hotel in San Jose
|
|
4.45 miles
|
HostPapa SJ1
|
SJ1 is located within CoreSite's 55 S Market building which is a legacy telecom and Internet hub.
|
|
4.45 miles
|
Hurricane San Jose
|
Multiple racks in cages in the same building as CoreSite Any2 San Jose
20+ Carriers with Diverse Fiber In Building
|
|
4.59 miles
|
150 S 1st
|
|
|
4.65 miles
|
Rackspace San Jose SJC2
|
Colocated within the Digital Reality's building
|
|
4.68 miles
|
Menlo: MD-SV1 (Sunnyvale)
|
Acquired in January 2022, this fully entitled 8.9-acre development site in Sunnyvale, CA features (1) two-story building totaling approximately 244,214 square feet served by an on-site substation.
|
|
5.33 miles
|
ECL CSC1
|
|
|
6.87 miles
|
Hurricane Electric Fremont 2
|
3 Internet Exchange Points (SFMIX, AMS-IX Bay, and FCIX)
70 Internet Networks
7 Carriers with Diverse Fiber
|
|
7.09 miles
|
Verizon: Fremont
|
The site is a previous XO Communications facility
|
|
7.60 miles
|
Astound: Mountain View
|
|
|
7.99 miles
|
Hurricane Electric Fremont 1
|
2 Internet Exchange Points (SFMIX and AMS-IX Bay)
20 Internet Networks
6 Carriers with Diverse Fiber
|
|
9.64 miles
|
Hyperscale Data Center
Request Dataset
|
While Apple sold the property to T5 Data Centers in October 2020, it continues to operate there as a tenant.
|
|
9.64 miles
|
T5@Silicon Valley (Newark)
|
T5 acquired the facility from Apple in 2020.
|
|
9.72 miles
|
T5@Silicon Valley Bldg 2
|
T5 plans to develop an additional three-story 180,000 SF data center building on its Silicon Valley campus.
|
|
12.32 miles
|
AT&T Palo Alto
|
|
|
12.38 miles
|
Equinix Palo Alto SV8
|
Equinix SV8 is the home of the legendary Palo Alto Internet Exchange.
|
|
12.38 miles
|
Menlo: Bryant Street Landlord
|
|
|
13.07 miles
|
Equinix SV11
|
|
|
13.12 miles
|
Equinix SV10
|
|
|
13.14 miles
|
Lightedge: San Jose, CA
|
LightEdge acts as a colocation and hybrid cloud provider operating within Equinix’s Silicon Valley campus.
|
|
13.16 miles
|
Equinix San Jose Campus
|
The four building Equinix campus in Silicon Valley lies to the far south in San Jose, yet it is one of the best-connected data centers in the Bay Area.
|
|
13.21 miles
|
Equinix SV5
|
|
|
13.44 miles
|
SC Zeus: San Jose
|
The site can support 5KW to 10KW per Rack. If support for Liquid Cooled Server is required, additional work needs to be completed, which will take around 4 months.
|
|
13.48 miles
|
China Mobile San Jose
|
In 2023, after many delays, the building was commissioned
|
|
13.49 miles
|
Prime: San Jose
|
|
|
13.49 miles
|
Equinix: SV18
|
|
|
13.50 miles
|
Equinix: SV19
|
|
|
13.51 miles
|
RICloud: 6580 Via del Oro
|
In 2017, RiCloud Corp acquired from Briggs Development and spent about $100 million renovating the property.
|
|
13.63 miles
|
Equinix: SV12x
|
|
|
19.39 miles
|
Prime Hayward
|
This 20MW two-story flex building comprising 145,850 square feet on 4 acres is 100% leased by a leading Fortune 50. The property was built in 2015 as a build-to-suit.
|
|
19.58 miles
|
Sierra Morena Tower
|
Sierra Morena Tower is a historical AT&T Long Line facility that now operates as a carrier-neutral communication and technology hub.
|