Equinix Begins Construction on DB7x Data Center in Dublin
March 30, 2026
Equinix
| Distance | Site | About |
|---|---|---|
| 0.06 miles | Astound: Santa Clara | |
| 0.06 miles | Evocative: Santa Clara, SJC3 |
Evocative's Santa Clara Data Center (SJC3), located at 3080 Raymond St, Santa Clara, CA , was constructed in 1980. Spanning an impressive 15000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
| 0.06 miles | OpenColo | |
| 0.14 miles | Colovore: SJC02 |
Colovore's second high-density, liquid-cooled data center is located immediately adjacent to its first data center in Santa Clara.
|
| 0.17 miles | Colovore: Santa Clara SJC01 |
Colovore launched its first single-story, 24,000-square-foot (2,230-square-meter) facility in Santa Clara in 2014, with its most recent expansion announced in February 2022.
|
| 0.18 miles | Digital Realty: SJC35 |
Located near Highway 101, 3205 Alfred is a two-story data center. The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.
|
| 0.18 miles | Digital Realty: SJC30 | |
| 0.20 miles | Lumen Santa Clara |
|
| 0.20 miles | Csquare: Santa Clara SF04 |
CenterSquare's SFO4 carrier-neutral data center campus is located just minutes from San Jose International Airport.
|
| 0.20 miles | Digital Realty: SJC14 | |
| 0.21 miles | Csquare: SFO4-B | |
| 0.22 miles | Tata San Francisco | |
| 0.22 miles | Digital Realty: Silicon Valley SJC10 |
Digital Realty acquired the 3 story facility in 2006. Telx formerly operated the building MMR. Digital Realty acquired Telx in 2015.
|
| 0.25 miles | Digital Realty: SJC15 |
The facility was renovated in 2008 and provides IT services customer with 2,250 kW of critical IT power
|
| 0.25 miles | Prime: 1231 Comstock |
Prime Data Centers is developing a new four-story, 119,000 square-foot data center. Located at 1231 Comstock Street.
|
| 0.26 miles | Evocative Santa Clara SJC14 |
|
| 0.26 miles | Digital Realty: SJC16 | |
| 0.27 miles | Prime Santa Clara |
Located in the heart of Silicon Valley, this new Santa Clara data center facility will be delivered as turn-key, or is available as powered shell, with 10 MW of critical power with N+1 configuration and up to 14MW of critical power with N configuration.
|
| 0.29 miles | StratCap: 3205 Bassett |
StratCap acquired a purpose-built data center in Santa Clara that is 100 percent leased to a ‘top-tier wireless carrier,’ and serves as a network switch facility.
|
| 0.31 miles | Digital Realty: SJC29 |
The building, renovated in 2010, houses three 1,125 kW data rooms and is equal to a power density of 160 watts per raised square foot.
|
| 0.37 miles | Hyperscale Data Center Request Dataset |
Amazon has acquired a former insulation factory located at 960 Central Expressway just west of San Jose Mineta International Airport in Santa Clara, California.
|
| 0.38 miles | Digital Realty: SJC11 |
|
| 0.48 miles | Connect Data Centers: Santa Clara, CA |
Harrison Street Real Estate Capital LLC and Oppidan Investment Co. have partnered to develop a 200,000-square-foot data center in Santa Clara, near Mineta San Jose International Airport.
|
| 0.54 miles | Digital Realty: SJC31 |
|
| 0.63 miles | NTT Silicon Valley SV1 |
A 160,000 sq. ft., four-story data center built on a 3.3 acre site
|
| 0.67 miles | EdgeCore Silicon Valley |
EdgeCore Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 0.69 miles | Digital Realty: SJC37 | |
| 0.75 miles | EdgeCore: SV02 |
EdgeCore's Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 0.79 miles | Intel Santa Clara D2P3 |
The facility uses close-coupled evaporative cooling that relies on recycled water, to help it to reach an annualized PUE of 1.06.
|
| 0.84 miles | Evocative Santa Clara SJC11 |
Formerly known as Internap Santa Clara SJE-011 before being acquired in September 2022 by Evocative
|
| 0.84 miles | CoreSite SV9 |
CoreSite opened its ninth Santa Clara data center, known as SV9, in 2025.
|
| 0.88 miles | CoreSite SV4 | |
| 0.89 miles | CoreSite Santa Clara Campus |
CoreSite's Santa Clara Campus contains 5 datacenter buildings. (SV3, SV4, SV5, SV6, SV7 and SV8)
|
| 0.90 miles | Prime: 2225 Martin |
Prime Data Centers is planning to build a 207,000 sq ft (19,230 sqm) facility nearby at 2225 Martin Street in Santa Clara, CA.
|
| 0.91 miles | CoreSite SV5 | |
| 0.93 miles | CoreSite SV8 |
CoreSite completed construction on SV8 phases I and 2 in the second half of 2019
|
| 0.94 miles | Prime Santa Clara (Martin) | |
| 0.95 miles | CoreSite SV6 | |
| 0.95 miles | Centersquare: Santa Clara SF01 |
|
| 0.95 miles | 2401 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 0.96 miles | CoreSite SV3 | |
| 0.98 miles | Vantage: CA16 |
CA16 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 0.99 miles | Cologix Santa Clara |
In 2021, Data center provider Cologix added its first major presence on the U.S. West Coast, acquiring this data center campus in Santa Clara, Calif. from vXchnge.
|
| 1.00 miles | Cyrusone Santa Clara |
|
| 1.00 miles | 2403 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 1.00 miles | Centersquare: Santa Clara SF01 DC2 |
|
| 1.00 miles | Hyperscale Data Center Request Dataset |
The project will span two data center buildings, the first spanning 285,768 square feet (26,548 sq m), and the second 229,974 square foot (21,365 sq m).
|
| 1.01 miles | EdgeConneX Santa Clara |
|
| 1.01 miles | CoreSite SV7 | |
| 1.03 miles | Hyperscale Data Center Request Dataset |
This planned facility will be a part of Amazon's 2305 Mission College Blvd Campus. The data center will span 229,974 sqft (21,365 sq m) of space.
|
| 1.04 miles | Vantage: CA15 |
CA15 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 1.05 miles | EdgeConneX: 1600 Memorex |
Expansion site
|
| 1.07 miles | Vantage: CA13 |
CA13 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 1.08 miles | Vantage: CA12 |
CA12 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 1.09 miles | Vantage: Santa Clara CA2 |
The Vantage's long-term plan calls for four data center buildings totaling 560,000 square feet and 55 megawatts of critical load.
|
| 1.10 miles | Digital Realty: SJC34 |
This site was acquired through the Telx acquisition and is part of the Vantage Campus in Santa Clara.
|
| 1.10 miles | Vantage: CA23 |
Vantage CA23 data center building is a part of Vantage's second Santa Clara Campus. The building spans 200,000 sq ft (18,500 sq m) of data center space and came online in 2021.
|
| 1.11 miles | Goodman Innovation Centre San Jose |
Logistics firm Goodman is set to enter the Silicon Valley data center market. The company confirmed the acquisition of a 45.8-acre site in San Jose for $200 million (bought from an affiliate of LBA Realty in October 2025).
|
| 1.11 miles | Vantage: Santa Clara CA1 |
Vantage's CA1 campus consists of six multi-story data centers on 21 acres, offering more than 335,000 square feet of data center space.
|
| 1.12 miles | Vantage: CA22 |
Vantage CA22 data center building is a part of Vantage's second Santa Clara Campus.
|
| 1.13 miles | Skybox Santa Clara |
|
| 1.13 miles | Vantage: CA14 |
CA14 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 1.15 miles | STACK SVY02A |
STACK Infrastructure is constructing a new data center facility at 1200 Memorex Drive, located in an industrial corner of Santa Clara. The four-story data center will contain 472,920 square feet.
|
| 1.19 miles | Goodman Innovation Bldg2 |
|
| 1.21 miles | Vantage: Santa Clara CA3 |
Vantage Data Centers' third Silicon Valley campus, CA3, is a four-story facility spanning over 486,000 square feet.
|
| 1.21 miles | Hyperscale Data Center Request Dataset |
Microsoft plans to build two five-story data centers near the corner of Component Drive and Orchard Parkway in North San Jose. In 2021, LBA sold about 21.3 acres to Microsoft for $78.7 million.
|
| 1.27 miles | Bowers Data Center |
GI Partners has secured planning permission to demolish an existing office property and develop a new four-story data center in Santa Clara, California.
|
| 1.27 miles | 2045 & 2055 Lafayette - Digital Realty |
Digital Realty acquired the facility in 2004 and fully leased it to Savvis. In 2007, Microsoft acquired that lease and is now the sole tenant of the facility.
|
| 1.32 miles | Santa Clara (SC1) Digital Realty |
|
| 1.50 miles | CloudHQ: Santa Clara SJC1 |
CloudHQ's SJC1 data center will be a multi-story facility designed to accommodate various deployment types.
|
| 1.62 miles | China Telecom Santa Clara | |
| 1.67 miles | QTS Santa Clara |
QTS's Santa Clara campus has two distinct data center buildings
|
| 1.76 miles | Centersquare: Sunnyvale SF03 |
|
| 1.83 miles | NaviSite Santa Clara |
|
| 1.85 miles | H5: Silicon Valley |
|
| 1.85 miles | ColoXchange Sunnyvale | |
| 1.85 miles | Element Critical SV1 |
|
| 1.85 miles | Equinix Santa Clara SV17 |
|
| 1.86 miles | Equinix Santa Clara SV16 |
|
| 1.86 miles | Equinix Santa Clara SV15 |
|
| 1.86 miles | Lumen Sunnyvale 1 |
|
| 1.86 miles | Equinix Santa Clara SV14 |
|
| 1.87 miles | 2950 Zanker |
The building is 100% leased on a long-term basis to a major telecommunications company.
|
| 1.91 miles | Centersquare: SF03 DC2 |
|
| 1.94 miles | 4650 Old Ironsides | |
| 1.94 miles | Centersquare: SF02 DC2 |
|
| 1.98 miles | Centersquare: Santa Clara SF02 |
|
| 1.98 miles | 4700 Old Ironsides | |
| 2.07 miles | DataBank Santa Clara SFO1 |
|
| 2.82 miles | CoreSite Milpitas SV2 | |
| 2.83 miles | 400 Holger Way, San Jose | |
| 3.14 miles | Prologis: San Jose 4 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 3.16 miles | Prologis: San Jose 3 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 3.19 miles | Prologis: San Jose 2 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 3.21 miles | Prologis: San Jose, California |
Prologis’ Sustainable Technology, Engineering and Manufacturing (STEM) Park is a landmark 159-acre development in North San Jose designed to anchor the region’s growing AI and semiconductor sectors.
|
| 3.25 miles | Vantage: Nortech Parkway |
In 2023, Vantage outlined plans to build a data center on a 9.8-acre plot in San Jose's Alviso area.
|
| 3.33 miles | Terra Ventures: San Jose, CA |
Terra Ventures has revised its plans for a 9.3-acre site in Alviso, North San Jose.
|
| 3.50 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Microsoft's Alviso Way Campus in San Jose, California.
|
| 3.57 miles | Equinix Sunnyvale SV6 |
|
| 3.59 miles | Equinix San Jose SV13 |
|
| 3.64 miles | Stack: SVY01C |
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
| 3.68 miles | Stack: SVY01D |
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
| 3.70 miles | 365 San Jose | |
| 3.70 miles | Equinix San Jose SV3 | |
| 3.70 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing a new data center campus on a 64.59-acre site in the Alviso neighborhood of Northern San Jose.
|
| 3.71 miles | Evocative: SJC7 |
|
| 3.75 miles | STACK Silicon Valley SVY01 |
Phase I supports 9.3 MW of critical power
|
| 3.80 miles | STACK SVY01B |
Stack Infrastructure has launched a 32MW SVY01B facility on its Silicon Valley campus in California
|
| 4.01 miles | Overton Moore Properties: 2334 Lundy Place |
Currently leased to a Triple Net customer, NTT Communications.
|
| 4.10 miles | Equinix Sunnyvale SV4 | |
| 4.11 miles | Arena Investors: Bassett AI R&D |
Spanning 281,800 sq ft, the development will feature lab and office spaces, three floors of data halls, IT white space, an on-site substation, generators, and a rooftop cooling plant.
|
| 4.15 miles | Cerulean San Jose |
|
| 4.16 miles | Fibernet San Jose |
|
| 4.52 miles | Menlo: MD-SV1 (Sunnyvale) |
Acquired in January 2022, this fully entitled 8.9-acre development site in Sunnyvale, CA features (1) two-story building totaling approximately 244,214 square feet served by an on-site substation.
|
| 4.64 miles | CoreSite SV1 55 S Market |
55 S Market is a legacy Carrier Hotel in San Jose
|
| 4.64 miles | Hurricane San Jose |
Multiple racks in cages in the same building as CoreSite Any2 San Jose
20+ Carriers with Diverse Fiber In Building
|
| 4.64 miles | HostPapa SJ1 |
SJ1 is located within CoreSite's 55 S Market building which is a legacy telecom and Internet hub.
|
| 4.78 miles | 150 S 1st |
|
| 4.85 miles | Rackspace San Jose SJC2 |
Colocated within the Digital Reality's building
|
| 5.19 miles | ECL MV1 | |
| 6.71 miles | Hurricane Electric Fremont 2 |
3 Internet Exchange Points (SFMIX, AMS-IX Bay, and FCIX)
70 Internet Networks
7 Carriers with Diverse Fiber
|
| 6.92 miles | Verizon: Fremont |
The site is a previous XO Communications facility
|
| 7.44 miles | Astound: Mountain View | |
| 7.81 miles | Hurricane Electric Fremont 1 |
2 Internet Exchange Points (SFMIX and AMS-IX Bay)
20 Internet Networks
6 Carriers with Diverse Fiber
|
| 9.43 miles | Hyperscale Data Center Request Dataset |
While Apple sold the property to T5 Data Centers in October 2020, it continues to operate there as a tenant.
|
| 9.43 miles | T5@Silicon Valley (Newark) |
T5 acquired the facility from Apple in 2020.
|
| 9.51 miles | T5@Silicon Valley Bldg 2 |
T5 plans to develop an additional three-story 180,000 SF data center building on its Silicon Valley campus.
|
| 12.16 miles | AT&T Palo Alto | |
| 12.22 miles | Equinix Palo Alto SV8 |
Equinix SV8 is the home of the legendary Palo Alto Internet Exchange.
|
| 12.22 miles | Menlo: Bryant Street Landlord | |
| 13.27 miles | Equinix SV11 | |
| 13.32 miles | Equinix SV10 | |
| 13.35 miles | Lightedge: San Jose, CA |
LightEdge acts as a colocation and hybrid cloud provider operating within Equinix’s Silicon Valley campus.
|
| 13.37 miles | Equinix San Jose Campus |
The four building Equinix campus in Silicon Valley lies to the far south in San Jose, yet it is one of the best-connected data centers in the Bay Area.
|
| 13.42 miles | Equinix SV5 | |
| 13.65 miles | SC Zeus: San Jose |
The site can support 5KW to 10KW per Rack. If support for Liquid Cooled Server is required, additional work needs to be completed, which will take around 4 months.
|
| 13.67 miles | Equinix: SV12x | |
| 13.68 miles | China Mobile San Jose |
In 2023, after many delays, the building was commissioned
|
| 13.69 miles | Prime: San Jose |
|
| 13.71 miles | Equinix: SV19 | |
| 13.71 miles | RICloud: 6580 Via del Oro |
In 2017, RiCloud Corp acquired from Briggs Development and spent about $100 million renovating the property.
|
| 13.89 miles | Equinix: SV18 |
|
| 19.17 miles | Prime Hayward |
This 20MW two-story flex building comprising 145,850 square feet on 4 acres is 100% leased by a leading Fortune 50. The property was built in 2015 as a build-to-suit.
|
| 19.46 miles | Sierra Morena Tower |
Sierra Morena Tower is a historical AT&T Long Line facility that now operates as a carrier-neutral communication and technology hub.
|
March 30, 2026
Equinix
January 29, 2026
Equinix
January 26, 2026
Equinix
December 19, 2025
Equinix
December 06, 2025
Equinix
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas