400 Paul Ave (1547)

Latest Podcast 400 Paul Ave
Operational
Fully operational facility
Operated by:

400 Paul Ave (1547)

Year Built: 2021
Utility Provider: PG&E
Lot Size: 7 acres
This site is leased from Novva Data Centers in the Novva: San Francisco building
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The 1547 site is located at the 400 Paul site adjacent to 200 Paul, a telecom hotel in San Francisco.

Consisting of three buildings — 320 Paul (Building A), 350 Paul (Building B), and 400 Paul (Building C) — the property is 7.3 acres and is permitted for 24 MW and 18 2-MW generators. Building B is built on a brownfield and developed into 2 MW of turnkey data center space. The total square footage for all buildings is 242,224.

Building Plan Overview

320 Paul: Buildings A

12,560 SF office/support space

350 Paul: Building B

Floor 1 and 2, 25,000 SF data center to include mechanical, electrical, white floor space and dual MMR’s.

400 Paul Building C

187,000 SF data center space in 400 Paul; 135,000 SF uninterrupted data hall space on two floors

Map and Nearby Locations

400 Paul Ave
1547 Critical Systems Realty (fifteenfortyseven) Sites
Nearby Facilities

400 Paul Ave (1547) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of 400 Paul Ave (1547)

Distance Site
0.03 miles Novva: San Francisco
0.10 miles Colocation America - San Francisco
0.11 miles 200 Paul (SFR1) Digital Realty
0.11 miles United Layer-SF9
0.11 miles United Layer-SF8
0.11 miles United Layer-SF7
0.11 miles Verizon: 200 Paul
0.11 miles Lumen San Francisco (200 Paul)
1.66 miles Global Stack: Daly City, CA
2.83 miles Guadalupe Quarry Redevelopment Project
3.48 miles Verizon: 651 Brannan
3.59 miles Lumen San Francisco 1
3.78 miles DataCanopy: San Francisco
4.01 miles Fortress Data Center San Francisco SF1
4.43 miles 365 Main (SFR2) Digital Realty
4.45 miles ColoServe San Francisco
4.45 miles 360 Spear
8.14 miles 720 2nd - Digital Realty
8.14 miles Internap Oakland
9.05 miles Cogent Oakland
9.77 miles Lumen Emeryville 1
10.22 miles Evocative: Emeryville, Oakland OAK1
15.86 miles Lumen Hayward 1
17.03 miles Prime Hayward
17.12 miles AT&T Hayward
19.85 miles Centersquare: Redwood City SFO9

400 Paul Ave (1547) Data Center Photos See all

BuildingS A & B
12,560 SF office/support space at 320 / 350 Paul

Building B
Floor 1 and 2, 25,000 SF data center to include mechanical, electrical, white floor space and dual MMR’s.

Buildin...
400 Paul Building Plan (see notes below)
Source: 1547 Critical Systems Realty

BuildingS A & B
12,560 SF office/support space at 320 / 350 Paul

Building B
Floor 1 and 2, 25,000 SF data center to include mechanical, electrical, white floor space and dual MMR’s.

Building C
187,000 SF data center space in 400 Paul; 135,000 SF uninterrupted data hall space on two floors

Operating Company

Operated by:

fifteenfortyseven Critical Systems Realty ("1547") is a leading developer and operator of custom-designed data centers with over 1,300,000 SF of data center space in Orangeburg, NY; Toronto, ON; Chicago, IL (2); Cheyenne, WY; San Francisco, CA; Kapolei, HI; Milwaukee, WI; and Portland, OR. Central to the company's strategy is its ability to uncover the true intrinsic value of properties and opportunistically develop world-class data center facilities. 1547's focus is providing tenants with strategic, customized mission critical solutions from concept through completion.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read ZutaCore Unveils Two-Phase Matrix Flow Boiling for AI Cold Plates
ZutaCore unveiled Two-Phase Matrix Flow Boiling, the cooling architecture inside its OmniTherm cold plate family, at OCP Global Summit 2026 on Oct. 13. The Foster City, California, company builds w...

ZutaCore Unveils Two-Phase Matrix Flow Boiling for AI Cold Plates

October 26, 2026 San Francisco Bay Area

ZutaCore unveiled Two-Phase Matrix Flow Boiling, the cooling architecture inside its OmniTherm cold plate family, at OCP Global Summit 2026 on Oct. 13. The Foster City, California, company builds waterless, direct-to-chip two-phase liquid cooling for AI and high-performance computing servers. The...

Read more
Read NetworkOcean Runs Solar-Powered GPU Data Center on San Francisco Bay
San Francisco startup NetworkOcean says it has become the first company to run customer AI workloads from a solar-powered floating data center. The company operated a single Nvidia H100 GPU powered...

NetworkOcean Runs Solar-Powered GPU Data Center on San Francisco Bay

October 03, 2026 San Francisco Bay Area

San Francisco startup NetworkOcean says it has become the first company to run customer AI workloads from a solar-powered floating data center. The company operated a single Nvidia H100 GPU powered by a 20kW solar array during a trial in San Francisco Bay. The customer was not disclosed....

Read more
Read OpenAI president Greg Brockman quits as the company fires CEO
OpenAI president Greg Brockman quits as the company fires CEO

OpenAI president Greg Brockman quits as the company fires CEO

November 20, 2023 San Francisco Bay Area

OpenAI's co-founder and president, Greg Brockman, has quit the company after the board suddenly fired CEO Sam Altman last week. Brockman, who was initially made to step down as board chairman, has left the company. The board is yet to disclose the exact reason for firing Altman as the company...

Read more
Read OpenAI co-founder Sam Altman fired from the company
OpenAI co-founder Sam Altman fired from the company

OpenAI co-founder Sam Altman fired from the company

November 19, 2023 San Francisco Bay Area

OpenAI co-founder Sam Altman has been fired as CEO of the artificial intelligence startup as the board denounces confidence in his leadership. In a statement released by the company, the board noted that it “no longer has confidence in his ability to lead.” Mira Murati, OpenAI’s chief technology...

Read more
Read Developers in San Jose, California, switch hotel plans for data center development
Developers in San Jose, California, switch hotel plans for data center development

Developers in San Jose, California, switch hotel plans for data center development

August 08, 2023 San Francisco Bay Area

Plans for an entertainment district development in San Jose, California, have been scrapped and replaced with data center plans, it has been announced. Back in 2018, developer Terra Ventures had initially pitched for development known as 'Shops @ Terra'; this would have been an...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.