H5: Nashville 2

Latest Podcast 147 Fourth Avenue North
Under ConstructionOperational
Fully operational with expansion in progress
Operated by:

H5: Nashville 2

Site was first built in 2014 and has expansions through 2027
░░░ Request Dataset MW
Total Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

In January 2026, H5 Data Centers acquired a highly connected, 19,700-square-foot carrier hotel asset in Nashville from 365 Data Centers. Through this acquisition, H5 substantially grew its regional footprint in partnership with private equity firm Novacap, operating the location under their newly launched connectivity platform, HyscaleIX.

Map and Nearby Locations

147 Fourth Avenue North ( Eighth Floor )
H5 Data Centers Sites
Nearby Facilities

H5: Nashville 2 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of H5: Nashville 2

Distance Site About
0.13 miles H5 Nashville
H5 no longer operates this facility. In a quiet consolidation shift, this site was fully decommissioned.
0.18 miles Atmosphere: Nashville, TN
Atmosphere Data Centers' planned Nashville, TN facility is a Tier III+ campus spanning 38 acres, optimized for AI/HPC workloads with high-density liquid cooling and a target 1.08 PUE.
0.42 miles Verizon: 101 Molloy
1.42 miles Fisk University: Nashville, TN
The Quantum Leap Innovation & Technology Center is a proposed $400 million, 100,000-square-foot facility spearheaded by Fisk University as the anchor of its broader $1 billion campus master plan in North Nashville, Tennessee.
4.08 miles RadiusDC: Nashville, TN
Located on a 12-acre plot in the Trinity Hills neighborhood, the completed data center will cover 102,500 square feet (9,500 square meters) by 2026.
4.33 miles Lumen Nashville 1
4.47 miles EdgeConneX Nashville
EdgeConnex has rights to adjacent space to accommodate expansion in Nashville.
5.32 miles DC Blox: Nashville Campus
DC Blox’s proposed data center in Nashville is facing strong pushback from the local community.
5.60 miles Lumen Nashville 2
7.37 miles Nexus Group Nashville
9.64 miles Mapletree: 402 Franklin
In 2020, Carter Validus sold the facility to Mapletree
13.24 miles Flexential Brentwood
The Brentwood site was known as "Nashville 1" and "Nashville 4" when they were operated by Peak 10. Site Usable SqFt Power MW Nashville 1 12,500 .8 MW Nashville 4 6,600 .18 MW Total 19,100 .98 MW
14.94 miles Flexential Cool Springs
The Cool Springs data center was known as "Nashville 2" and "Nashville 3" when it was formerly operated by Peak 10.
16.90 miles Flexential Franklin TN
The site was known as "Nashville 5" when operated by Peak 10.
17.02 miles Tierpoint Nashville NSH
17.02 miles Compass Franklin I

Operating Company

Operated by:

H5 Company History:


  • July 2018, Acquires Intiuit datacenter in Quincy, WA
  • March 2018, H5 Expands to Albuquerque (505 Marquette)
  • January 2017, the Cleveland Technology Center (CTC) from ByteGrid. Source: Telecom Ramblings
  • January 2016 H5 acquired NextFort and its Phoenix datacenter.
  • June 2015, H5 acquired their Ashburn datacenter. Source: H5 Press Release
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Nashville Authorizes Eminent Domain for DC BLOX Site Near Zoo
Nashville's Metro Council voted 27 to 5 on August 4 to authorize the acquisition of a proposed [DC BLOX](https://baxtel.com/data-centers/dc-blox) data center site beside the Nashville Zoo. The vote...

Nashville Authorizes Eminent Domain for DC BLOX Site Near Zoo

August 10, 2026 DC Blox: Nashville Campus

Nashville's Metro Council voted 27 to 5 on August 4 to authorize the acquisition of a proposed DC BLOX data center site beside the Nashville Zoo. The vote allows Metro Nashville to negotiate for the 23.49-acre DC BLOX Nashville Campus or pursue eminent domain if the parties cannot agree. The...

Read more
Read H5 expands its San Antonio data center
H5 expands its San Antonio data center

H5 expands its San Antonio data center

November 21, 2023 H5 Data Centers

H5 this week announced the phase three expansion of its 100 Taylor Street facility, adding an additional 340 cabinets and up to 1.5MW of additional UPS capacity. This site, located at 100 Taylor Street, was acquired by H5 in 2018 and was previously owned by the Texas ISP Taylor Telecom. It is an...

Read more
Read H5 Data Centers to expand its Phoenix data center
H5 Data Centers to expand its Phoenix data center

H5 Data Centers to expand its Phoenix data center

July 04, 2023 H5 Data Centers

H5 Data Centers has announced a 30,000 sqft expansion of its Phoenix colocation facility. Located at 2600 W. Germann Road in Chandler, AZ, this expansion is part of the company's third phase of development at the 180,000-square-foot data center. Further to this square-footage expansion, phase...

Read more
Read Construction of H5's Ashburn, VA Data Center Begins
Construction of H5's Ashburn, VA Data Center Begins

Construction of H5's Ashburn, VA Data Center Begins

March 22, 2023 H5 Data Centers

After dismantling the former data center there, H5 Data Centers has started construction on a new one in Ashburn, Virginia. This week, the company started building a 255,000-square-foot, three-story data center with a 42-megawatt capacity. The building is offered for pre-leasing at Loudoun...

Read more
Read H5 Data Centers Completes The Acquisition of Seven Data Centers From vXchnge
H5 Data Centers Completes The Acquisition of Seven Data Centers From vXchnge

H5 Data Centers Completes The Acquisition of Seven Data Centers From vXchnge

February 01, 2022 H5 Data Centers

H5 Data Centers has announced that it has completed the acquisition of seven data center facilities from vXchnge across the United States. With this development, vXchnge has just one data center. With this agreement, H5 data centers has added over 250,000 square feet (23,200 square meters) of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?