Japan Data Facility Purchased by Mapletree Industrial Trust
May 26, 2023
Mapletree Redwood Data Centre Trust
In 2014, The AT&T Data center was sold to Carter Validus Mission Critical REIT
In 2020, Carter Validus sold the facility to Mapletree
The AT&T Data Center, which serves as the company’s main communication center, employs 500 personnel within a 347,515 square foot building on 46.32-acres.
| Distance | Site | About |
|---|---|---|
| 3.65 miles | Flexential Brentwood |
The Brentwood site was known as "Nashville 1" and "Nashville 4" when they were operated by Peak 10.
Site
Usable SqFt
Power MW
Nashville 1
12,500
.8 MW
Nashville 4
6,600
.18 MW
Total
19,100
.98 MW
|
| 5.54 miles | Flexential Cool Springs |
The Cool Springs data center was known as "Nashville 2" and "Nashville 3" when it was formerly operated by Peak 10.
|
| 5.83 miles | Lumen Nashville 1 | |
| 7.30 miles | Flexential Franklin TN |
The site was known as "Nashville 5" when operated by Peak 10.
|
| 7.74 miles | Compass Franklin I | |
| 7.74 miles | Tierpoint Nashville NSH | |
| 8.78 miles | Nexus Group Nashville | |
| 9.40 miles | Verizon: 101 Molloy |
|
| 9.64 miles | H5 Nashville | |
| 9.66 miles | 365 Nashville (NA1) | |
| 9.76 miles | EdgeConneX Nashville |
EdgeConnex has rights to adjacent space to accommodate expansion in Nashville.
|
| 10.71 miles | Lumen Nashville 2 | |
| 13.69 miles | RadiusDC: Nashville, TN |
Located on a 12-acre plot in the Trinity Hills neighborhood, the completed data center will cover 102,500 square feet (9,500 square meters) by 2026.
|
May 26, 2023
Mapletree Redwood Data Centre Trust
August 18, 2021
Lumen Minnetonka
August 16, 2021
Mapletree Redwood Data Centre Trust
May 20, 2021
Mapletree Redwood Data Centre Trust
June 23, 2020
Mapletree Redwood Data Centre Trust
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas